Quick Overview

Write a SQL query that returns the average number of days between start and end dates across completed projects, skipping rows with a missing date and rounding to two decimals. It tests date arithmetic, NULL handling in aggregates and numeric rounding in PostgreSQL.

Calculate the average project completion time in days, ignoring rows with a missing date

Company: Target

Role: Data Scientist

Category: Data Manipulation (SQL/Python)

Difficulty: easy

Interview Round: Other

Return the average number of days between `start_date` and `end_date` across all completed projects in `Projects`. Ignore rows where either date is `NULL`, and return a single column `avg_completion_days`, rounded to 2 decimals. ```hint Date arithmetic Check what type PostgreSQL gives you when you subtract one `DATE` from another, and what type `ROUND(x, 2)` accepts. ``` ### Input Table(s) `Projects` | Column | Type | Meaning | |---|---|---| | project_id | INT | Project identifier | | project_name | VARCHAR(100) | Project name | | start_date | DATE | Date the project started, may be NULL | | end_date | DATE | Date the project finished, NULL if not finished | Primary key: `project_id`. ### Output Contract Exactly one row with one column: | Column | Definition | |---|---| | avg_completion_days | Mean of `end_date - start_date` in days over projects with both dates present, rounded to 2 decimal places | The result is always a single row, so no ordering is needed. ### Example `Projects` | project_id | project_name | start_date | end_date | |---|---|---|---| | 1 | Alpha | 2024-01-01 | 2024-01-08 | | 2 | Beta | 2024-02-01 | NULL | | 3 | Gamma | NULL | 2024-03-10 | | 4 | Delta | 2024-04-01 | 2024-04-15 | Expected result: | avg_completion_days | |---| | 10.50 | Only projects 1 and 4 have both dates. Their durations are 7 and 14 days, and the average is 10.50. ### Constraints and Clarifications - `Projects` has 1 to 100,000 rows. - `project_id` is the primary key, so each project is counted once. - `start_date` is on or before `end_date` when both are present. - A completed project is one with both dates present. Rows with either date `NULL` are left out of both the sum and the count. - The duration is the plain difference in days: a project that starts and ends on the same day has a duration of 0, and 2024-01-01 to 2024-01-08 is 7 days. - If no project has both dates, the result is one row with `avg_completion_days` equal to `NULL`.

Overview: Write a SQL query that returns the average number of days between start and end dates across completed projects, skipping rows with a missing date and rounding to two decimals. It tests date arithmetic, NULL handling in aggregates and numeric rounding in PostgreSQL.

The `projects` table has one row per project with columns `project_id` (INTEGER, primary key), `project_name` (VARCHAR(100)), `start_date` (DATE, the date the project started, may be NULL) and `end_date` (DATE, the date the project finished, NULL if not finished). The table has 1 to 100,000 rows. Return the average number of days between `start_date` and `end_date` across all completed projects in `projects`. A completed project is one with both dates present. Ignore rows where either date is NULL: leave them out of both the sum and the count. Because `project_id` is the primary key, each project is counted once. The duration is the plain difference `end_date - start_date` in days: a project that starts and ends on the same day has a duration of 0, and 2024-01-01 to 2024-01-08 is 7 days. When both dates are present, `start_date` is on or before `end_date`. Return exactly one row with a single column `avg_completion_days`: the mean duration in days over projects with both dates present, rounded to 2 decimal places. If no project has both dates, return one row with `avg_completion_days` equal to NULL. The result is always a single row, so no ordering is needed.

Tables

projects(project_id INTEGER, project_name VARCHAR(100), start_date DATE, end_date DATE)

Hints

  1. Check what type PostgreSQL gives you when you subtract one DATE from another, and what type ROUND(x, 2) accepts.
TargetData ScientisteasyData Manipulation (SQL/Python)

Average Project Completion Days

The projects table has one row per project with columns project_id (INTEGER, primary key), project_name (VARCHAR(100)), start_date (DATE, the date the project started, may be NULL) and end_date (DATE, the date the project finished, NULL if not finished). The table has 1 to 100,000 rows.

Return the average number of days between start_date and end_date across all completed projects in projects. A completed project is one with both dates present. Ignore rows where either date is NULL: leave them out of both the sum and the count. Because project_id is the primary key, each project is counted once.

The duration is the plain difference end_date - start_date in days: a project that starts and ends on the same day has a duration of 0, and 2024-01-01 to 2024-01-08 is 7 days. When both dates are present, start_date is on or before end_date.

Return exactly one row with a single column avg_completion_days: the mean duration in days over projects with both dates present, rounded to 2 decimal places. If no project has both dates, return one row with avg_completion_days equal to NULL. The result is always a single row, so no ordering is needed.

Expected Output

Tables

projects
projects
ColumnType
project_idINTEGER
project_nameVARCHAR(100)
start_dateDATE
end_dateDATE

Comments (0)

No comments yet. Be the first to comment!

Submit your answer

Approved first answer today earns 30 XP
Bold⌘BItalic⌘IInline code⌘`Bullet listTab to nest (○ ■)Numbered listTab to nest (a. i.)QuoteCode block
Formatting help
Language
Run code to see results here.

Browse More Questions