Estimation: Size the Total Data Storage Behind Google Street View Imagery
Company: Google
Role: Product Manager
Category: Product / Decision Making
Difficulty: medium
Interview Round: Other
Estimate how much storage Google needs to hold the Street View imagery in Google Maps. Talk through your assumptions as you build the number.
```hint Follow the car
Imagery is captured at points along roads. Work out how much data one capture point produces, how many such points a road network needs, and what else multiplies that total beyond a single snapshot of each place.
```
### Clarifying Questions
- Should I estimate worldwide coverage, or size one country such as the US first and then scale up?
- Am I sizing only the published panoramas that users browse, or also the raw data the capture vehicles record for processing?
- Should older captures that stay available as historical imagery, and extra copies kept for durability, be included?
- Is a storage volume enough, or would you also like a monthly cost?
### What a Strong Answer Covers
- A clear equation that multiplies road coverage, capture density, data per capture, retained versions and redundancy
- Round-number assumptions for each factor, each labeled and justified, with units kept straight (road miles versus square miles, megabytes versus megabits)
- Correct arithmetic, with the result stated in sensible units
- A sanity check against an independent reference point, and a note on which assumption moves the answer most
- How the estimate extends to raw capture data, other countries or imagery away from roads
### Follow-up Questions
- Which assumption would you check first, and how would you check it?
- How would the answer change if every raw camera frame were kept instead of only the stitched panoramas?
- How could you cut the storage bill without making Street View worse for users?
Overview: A Google product manager estimation question asking how much storage the imagery behind Google Maps Street View requires. It tests breaking a fuzzy total into road coverage, capture density and image size, labeling assumptions, keeping units straight and sanity-checking the final figure.