Maximize portfolio return by picking assets within a budget

Quick Overview

Choose a subset of assets, each with a cost and a projected return, to get the largest total return without going over a fixed budget, using each asset at most once. It tests dynamic programming on a budget dimension, the order of table updates, and why a greedy ratio rule fails.

Maximize portfolio return by picking assets within a budget

Role: Software Engineer

Category: Coding & Algorithms

Difficulty: medium

Interview Round: Other

You are given `n` assets, where each asset has a cost (the amount of capital required to invest) and a projected return value. You also have a total `budget` representing your available capital. Select a subset of assets to maximize the total return value without exceeding the `budget`. Each asset can only be selected at most once. Return the maximum total return value achievable within the given budget. ### Function Signature ```python def max_portfolio_value(costs: list[int], returns: list[int], budget: int) -> int: ``` ### Rules - Asset `i` has cost `costs[i]` and return `returns[i]`. - A selection is valid when the sum of its costs is at most `budget`. Spending exactly the budget is allowed, and so is leaving part of it unused. - Each asset is either taken once or not at all. Fractions of an asset are not allowed. - Return only the maximum total return, not the chosen assets. ### Constraints - `1 <= n <= 200`, and `len(costs) == len(returns) == n` - `1 <= budget <= 10000` - `1 <= costs[i] <= budget` - `1 <= returns[i] <= 10000` ### Examples ```text Input: costs = [10, 20, 30], returns = [60, 100, 120], budget = 50 Output: 220 ``` Assets 1 and 2 cost ${20 + 30 = 50}$ and return ${100 + 120 = 220}$. Taking all three would cost 60, and every other pair returns less (160 or 180). ```text Input: costs = [5, 10, 15, 20], returns = [10, 30, 20, 50], budget = 25 Output: 60 ``` Assets 0 and 3 cost ${5 + 20 = 25}$ and return 60. The next best valid choice is assets 1 and 2 (cost 25, return 50). Assets 1 and 3 would return 80 but cost 30, which is over the budget. ```text Input: costs = [6, 7], returns = [5, 8], budget = 10 Output: 8 ``` Both assets together cost 13, so only one can be taken. Asset 1 returns more, and the 3 units of unused budget are fine.

Overview: Choose a subset of assets, each with a cost and a projected return, to get the largest total return without going over a fixed budget, using each asset at most once. It tests dynamic programming on a budget dimension, the order of table updates, and why a greedy ratio rule fails.

PracHub logo
General
Nov 24, 2026
mediumSoftware EngineerOtherCoding & Algorithms
0
0

You are given n assets, where each asset has a cost (the amount of capital required to invest) and a projected return value. You also have a total budget representing your available capital.

Select a subset of assets to maximize the total return value without exceeding the budget. Each asset can only be selected at most once.

Return the maximum total return value achievable within the given budget.

Function Signature

def max_portfolio_value(costs: list[int], returns: list[int], budget: int) -> int:

Rules

  • Asset i has cost costs[i] and return returns[i] .
  • A selection is valid when the sum of its costs is at most budget . Spending exactly the budget is allowed, and so is leaving part of it unused.
  • Each asset is either taken once or not at all. Fractions of an asset are not allowed.
  • Return only the maximum total return, not the chosen assets.

Constraints

  • 1 <= n <= 200 , and len(costs) == len(returns) == n
  • 1 <= budget <= 10000
  • 1 <= costs[i] <= budget
  • 1 <= returns[i] <= 10000

Examples

Input: costs = [10, 20, 30], returns = [60, 100, 120], budget = 50
Output: 220

Assets 1 and 2 cost 20+30=50{20 + 30 = 50} and return 100+120=220{100 + 120 = 220}. Taking all three would cost 60, and every other pair returns less (160 or 180).

Input: costs = [5, 10, 15, 20], returns = [10, 30, 20, 50], budget = 25
Output: 60

Assets 0 and 3 cost 5+20=25{5 + 20 = 25} and return 60. The next best valid choice is assets 1 and 2 (cost 25, return 50). Assets 1 and 3 would return 80 but cost 30, which is over the budget.

Input: costs = [6, 7], returns = [5, 8], budget = 10
Output: 8

Both assets together cost 13, so only one can be taken. Asset 1 returns more, and the 3 units of unused budget are fine.