What Belongs in a Product Requirements Document and Why Each Section Matters

Quick Overview

A product manager interview question asking what belongs in a product requirements document. It tests whether a candidate can name the essential sections of a PRD, explain what each one contains and which reader it serves, and scale the document to the size of the effort.

What Belongs in a Product Requirements Document and Why Each Section Matters

Company: Uber

Role: Product Manager

Category: Product / Decision Making

Difficulty: medium

Interview Round: Other

As a product manager, what are the main components of a product requirements document (PRD)? Name the sections you would include, explain what each one should contain, and say why it deserves a place in the document. ```hint Think about the readers A PRD is read by engineers, designers, data scientists, legal reviewers and leaders, and each of them opens it looking for different answers. Work out what each reader needs to find. ``` ### Clarifying Questions - Is the PRD for a brand-new product or for a feature inside an existing product? - Who is the main audience: the engineering and design team building it, or leadership approving the investment? - Does the team treat the PRD as a living document updated during development, or as a spec signed off before work begins? - How large is the effort: a small iteration one squad can ship, or a launch that spans several teams? ### What a Strong Answer Covers - The problem side: who the users are, the problem, the evidence for it, and the goal. - The solution side: prioritized requirements, explicit scope boundaries, and the intended user experience. - How success will be measured, and how risks, dependencies and unresolved questions are tracked. - The purpose of each section (which reader it serves, which failure it prevents) rather than a bare list of headings. - Fitting the document's depth to the size of the effort and keeping it current after kickoff. ### Follow-up Questions - An engineer says your PRD is too prescriptive about the solution. How do you decide what belongs in the PRD versus a technical design or a design spec? - How would a PRD for a small improvement to an existing flow differ from one for a new product line? - Requirements change halfway through development. How do you update the PRD so the team keeps trusting it?

Overview: A product manager interview question asking what belongs in a product requirements document. It tests whether a candidate can name the essential sections of a PRD, explain what each one contains and which reader it serves, and scale the document to the size of the effort.

Uber logo
Uber
Jan 18, 2025
mediumProduct ManagerOtherProduct / Decision Making
0
0

As a product manager, what are the main components of a product requirements document (PRD)? Name the sections you would include, explain what each one should contain, and say why it deserves a place in the document.

Clarifying Questions Guidance

  • Is the PRD for a brand-new product or for a feature inside an existing product?
  • Who is the main audience: the engineering and design team building it, or leadership approving the investment?
  • Does the team treat the PRD as a living document updated during development, or as a spec signed off before work begins?
  • How large is the effort: a small iteration one squad can ship, or a launch that spans several teams?

What a Strong Answer Covers Guidance

  • The problem side: who the users are, the problem, the evidence for it, and the goal.
  • The solution side: prioritized requirements, explicit scope boundaries, and the intended user experience.
  • How success will be measured, and how risks, dependencies and unresolved questions are tracked.
  • The purpose of each section (which reader it serves, which failure it prevents) rather than a bare list of headings.
  • Fitting the document's depth to the size of the effort and keeping it current after kickoff.

Follow-up Questions Guidance

  • An engineer says your PRD is too prescriptive about the solution. How do you decide what belongs in the PRD versus a technical design or a design spec?
  • How would a PRD for a small improvement to an existing flow differ from one for a new product line?
  • Requirements change halfway through development. How do you update the PRD so the team keeps trusting it?