4flow · Software Engineer
Updated · 2026-09-24

4flow Software Engineer
Interview Questions & Guide 2026

THE 60-SECOND BRIEF

As a Software Engineer at 4flow, you are not just writing code; you are building the digital backbone that powers complex global supply chains. The role is unique because it sits at the intersection of high-level logistics consulting and cutting-edge software development. You will be responsible for designing and implementing systems that optimize how goods move across the world, impacting efficiency, sustainability, and reliability for major global clients.

The behavioural round is a technical round in narrative form. Prepare it by collecting specifics you actually owned, such as a design you argued against, an incident you diagnosed, or a decision you later reversed, rather than by rehearsing phrasing.

4flow candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.

Make every write idempotent under retryPaginate large result sets with keyset cursorsBound every outbound call with a timeout

38 min read

Browse Software Engineer questions

See the practice prompts

15Practice promptsAcross five skill areas
3With worked solutionsIncluded in the practice prompts

As a Software Engineer at 4flow, you are not just writing code; you are building the digital backbone that powers complex global supply chains. The role is unique because it sits at the intersection of high-level logistics consulting and cutting-edge software development. You will be responsible for designing and implementing systems that optimize how goods move across the world, impacting efficiency, sustainability, and reliability for major global clients.

This position is critical because 4flow operates in a space where software must be both robust and highly adaptable to real-world physical constraints. You will likely contribute to enterprise-grade platforms, integrating backend services with complex supply chain logic. If you enjoy solving high-stakes architectural puzzles—such as managing data flow across disparate global systems or ensuring high availability for logistics services—this role offers significant strategic influence.

4flow values a pragmatic approach to engineering. They prioritize your ability to explain architectural decisions and your domain knowledge over pure algorithmic memorization.

01

Initial Screening

reported

Half of this call is the part candidates treat as small talk: start date, notice period, work authorisation and its timing, location and time zone, on-call, and the number. Those are what kill offers late, after several engineers have each spent a day. Surfacing a hard constraint now costs you nothing and occasionally buys you something, since a loop compressed to fit a competing deadline can usually only be arranged if it is asked for early. The common failure is deflecting the compensation question twice, then discovering at offer stage that the band never reached your number.

What to demonstrate

  • Whether your hard constraints are compatible with the role before a loop gets booked: earliest start, notice period, what authorisation you hold and when it needs action, days on site, willingness to carry a pager
  • Whether you give a compensation range with something behind it, such as current total compensation or a competing timeline, rather than leaving the band untested
  • Whether your stated timeline is real, since a competing deadline raised now is something scheduling can sometimes work around and the same deadline raised at offer stage usually is not

How to prepare

  • Write each constraint down in one line before the call and state them as facts rather than negotiating them live under a question you were not expecting
  • Set your range from two or three current data points for that level and location, and name the structure you are quoting in, so the number is comparable to the one they are holding
  • If another process is running, say where it stands and by when, and ask directly whether this loop can be scheduled inside that window
PracHub interview research ↗
02

Technical Discussions

reported

Input bounds are the part of the prompt most often skimmed, and they usually contain the answer. They tell you which complexity class is admissible, which narrows the search before you have thought about the problem itself. As a rough planning figure, a compiled language does on the order of 10^8 simple operations per second and an interpreted one roughly an order of magnitude less. So n up to about twenty admits enumerating subsets, a few thousand admits a quadratic pass, and a million admits neither: you need near-linear, or linear with a log factor. If the bounds are missing, ask for them.

What to demonstrate

  • Whether the approach is justified by the stated input size rather than by whichever pattern you recognised first
  • Whether you ask about the properties that change the algorithm: whether the input arrives sorted, whether duplicates occur, whether values are bounded integers, whether it all fits in memory
  • Whether you can name the bottleneck in your own solution and what would remove it, even when you deliberately leave it in place
  • Whether a claimed speedup is real, since memoising a recursion only helps when subproblems genuinely overlap and the state can be keyed cheaply

How to prepare

  • For each algorithm you rely on, write down the largest n it handles in roughly a second, then check two of those figures by timing them in the language you will actually type in
  • For two weeks, write one line naming your target complexity and the bound that justifies it before you write any code, then compare that line with what you ended up submitting
  • Practise the conversion backwards: given a required O(n log n), list the mechanisms that get you there (sorting, a heap, an ordered map, divide and conquer) and choose by what the problem needs to query, not by what you used last
PracHub interview research ↗
03

Case Study Presentation

reported

The prompt is deliberately underspecified, and the first ten minutes decide most of the outcome. What separates a strong answer is whether requirements arrive as numbers you then use, rather than a ritual of questions asked and abandoned: how many writes a second, how large a record, how stale a read may be, what must survive a machine dying. Weak answers ask what the scale is, hear a number, then draw the diagram they would have drawn anyway. The round is deciding whether you can bound an open problem tightly enough that a team could build it, and say plainly which parts you are not designing.

What to demonstrate

  • Whether the requirements you extract actually change the design: the moment a number you asked for rules an option out is the one being watched for, and its absence is noticed
  • Which parts you put out of scope and whether you say so out loud, since an unbounded problem worked at uniform depth ends as a diagram with no decisions in it
  • Whether you separate what the system must guarantee from what it may lose, in durability and in staleness, before choosing any storage
  • Whether your one-sentence restatement of the problem matches what was actually asked, rather than the adjacent problem you already know how to solve

How to prepare

  • Take three open prompts and stop after scoping. Write the five numbers you would need and, beside each, the decision that number settles. Any question that settles nothing is one you are asking out of habit; cut it
  • Draft the out-of-scope sentence for each prompt and say it aloud: two things you are deliberately not designing and the condition that would bring them back. It costs nothing at minute five and reads as retreat at minute thirty
  • Write a one-sentence problem statement for a prompt, then have someone holding the original compare them and flag what you quietly added or dropped
PracHub interview research ↗

PracHub editorial advice for the preparation topics above.

01

Shipping a migration and the code that depends on it as a single change

During any rolling deploy, and for as long as a rollback remains possible, old and new code execute against the same schema at the same time. A migration that drops or renames a column breaks every instance that has not restarted yet, and code that requires a column the migration has not applied breaks every instance that restarted early. The discipline is expand then contract: add the new column nullable, write both shapes, backfill in batches, move reads across once the backfill is verified, and only then stop writing the old shape and drop it - four deploys, usually spread over days. It feels disproportionate until the first rollback, at which point it is the only reason the previous version still runs.

02

Choosing an index from the columns a query mentions rather than from how it filters and orders

A composite B-tree index on (a, b, c) can be seeked only as a left prefix: equality on a, then equality on b, then a range or an ordering on c. A query that filters on b alone cannot seek into it at all and at best gets a full scan of the index; a query that filters a and ranges on b gets no benefit from c, because the index is only sorted by c within a fixed (a, b) pair. The practical consequence is that one index per column is close to useless for multi-predicate queries while a single correctly ordered composite index turns a scan into a lookup. The ordering half is what gets missed: if the index cannot satisfy the ORDER BY, the database must read every matching row and sort before the limit can apply, so a LIMIT 20 over a million matching rows still reads a million rows.

03

Trusting input because it came from your own front end

Anything crossing a trust boundary is hostile: parameterise queries instead of building SQL by concatenation, validate against an allow-list rather than a deny-list, and bound the size of anything you allocate from a request. Raising this unprompted in an API or design question is a cheap and unusually strong signal.

04

Abandoning working code to chase the optimal solution

Get the straightforward version correct, state its complexity, and only then optimise, keeping the working version until the faster one passes the same cases. A correct quadratic solution with a stated path to linear beats a half-written optimal one that never ran.

Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.

12 technical prompts3 include a worked solution

Track a rolling failure rate per destination for circuit decisions

easyWorked solution
sliding windowring buffercircuit breaker

The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.

Approach
  1. Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
  2. Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
  3. State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
  4. Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
  5. Expire idle destinations, or memory grows with every destination ever seen rather than with the live set. Hold the rings in a bounded LRU keyed on destination_id and treat a miss as no history, which is the correct default for an endpoint that has been silent for a minute.
  6. Keep the half-open probe out of the window arithmetic. After the circuit opens, one probe per interval decides whether to close it, and folding that single success into a window that still holds a 100 percent failure history would reopen the destination on one data point.
Worked solution 20 min
  1. Define the bucket struct and the advance step: take floor(finished_at_ms / 1000), compare with the ring's current second, zero min(delta, 60) buckets forward, then write into the new head.
  2. Trace a destination that receives 5 attempts, goes silent for 90 seconds, then receives one more, and confirm the rate is computed from one attempt rather than six.
  3. Compute total memory for 40,000 destinations at 60 buckets of two 4-byte counters, and state what changes if the window widens to 300 seconds.
  4. Write the open rule as a single predicate combining the minimum-attempt floor with the rate threshold.
EXPECTED RESULTA per-destination ring of 60 one-second (attempts, failures) buckets advanced lazily for amortised O(1) cost, roughly 480 bytes of counters per destination and about 20 to 25 MB for 40,000 of them, an LRU bound on live rings, and an open rule requiring both a minimum attempt count in the window and a rate above threshold.
Follow-up
  • The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
  • A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
  • How would you make the window survive a process restart, and is it worth the cost?

Diff a projection against the primary without per-row point reads

hard
reconciliationrange hashingthrottling

The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.

Approach
  1. Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
  2. Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
  3. For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
  4. Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
  5. Pin the comparison to a point in time or it reports lag as drift: consider only rows whose updated_at is older than now minus a lag margin, and re-check each candidate mismatch individually before repairing. At 1,200 writes per second a diff without this reports thousands of false positives, and an unattended repairer would then overwrite live rows with stale values.
  6. Make the run resumable and throttled: batch by range key, persist the last completed range, and watch a signal such as replica lag or primary CPU, pausing rather than pressing on. A reconciliation that cannot be stopped and resumed gets killed halfway and restarted from zero, which is how a repair becomes an incident.
Follow-up
  • The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
  • Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
  • How would you run this continuously at low cost instead of only as incident response?

Find overlapping job attempts and peak concurrency from lease records

medium
sweep lineintervalsleases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach
  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
  5. State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
  6. Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.
Follow-up
  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
  • How would you compute both answers incrementally as records arrive rather than in a daily batch?

For someone who has spent the last few years shipping features and reading other people's code, and who has not solved a timed problem from a blank file in a long time. Five days rebuild the primitives and the patterns that sit on them, working from invariants rather than remembered solutions, and the last two attach that back to the rest of the loop.

Small steps. Visible outcomes.0 / 7 completed
ONE WEEK · YOUR PACE

Prepare, practise & reflect

One practical outcome each day. Spend longer where you need it.

0 / 7 done
01Rebuild the primitives by implementing them
  • Implement a dynamic array with doubling growth and an operation counter, then change the growth rule to add a fixed sixteen slots instead, and time both for n of ten thousand, a hundred thousand and a million. The fixed-increment version resizes n/16 times at O(n) each, so its total work is quadratic; doubling is what makes append amortised constant.
  • Implement a hash map with separate chaining and a load-factor resize, then insert ten thousand keys engineered to land in one bucket and record what happens to lookup time, so that average-case O(1) becomes a claim with a stated precondition rather than a reflex.
  • For dynamic-array append and hash-map insert, write down which cost is amortised rather than worst-case, which single operation pays the whole bill, and what a system with a hard per-operation deadline would have to do instead.

Deliverable: Two working implementations plus a timing table showing the input at which each structure's advertised complexity stops holding.

Practice prompt ↗Practice prompt ↗Practice prompt ↗Worked solution ↗
02Arrays under an invariant: two pointers, sliding window, binary search
  • Solve longest-subarray-with-sum-at-most-K using a sliding window, then run it on an input containing negative numbers and watch it return the wrong answer: extending the window only moves the sum monotonically when every element is non-negative, and that precondition is the whole reason the technique works.
  • Write the binary search that finds the first index satisfying a predicate rather than an exact value, put the loop invariant above the loop in a comment, and verify termination on the two inputs that break careless versions: the empty range, and a range where every element satisfies the predicate.
  • Compute the midpoint as lo + (hi - lo) / 2 and write one line on why the obvious (lo + hi) / 2 is a genuine defect in a fixed-width integer type and a non-issue in a language with arbitrary-precision integers.

Deliverable: Three solved problems, each with its invariant written above the loop, plus one recorded input on which the sliding window is provably wrong.

Practice prompt ↗Practice prompt ↗
03Sorting, heaps, and the greedy argument that has to be proved
  • Solve one top-k problem three ways, by full sort, by a size-k heap, and by quickselect, then write the values of n and k at which each becomes the right choice, along with quickselect's quadratic worst case and why a randomised pivot makes that unlikely rather than impossible.
  • Implement bottom-up heapify and count sift-down steps to confirm it does linear work rather than n log n, because most nodes sit near the bottom of the tree and therefore move only a short distance.
  • Take interval scheduling by earliest finishing time and write the exchange argument out in full: given any optimal schedule, swapping in the earliest-finishing interval keeps it feasible and no smaller. Then construct the weighted variant where that same greedy fails and name what has to replace it.

Deliverable: A three-way top-k comparison with measured crossover points, one written exchange argument, and one counterexample to a greedy rule that looks almost identical.

Practice prompt ↗Practice prompt ↗
04Recursion, memoisation, and the step to a table
  • Take one problem with overlapping subproblems, such as edit distance or coin change, instrument the plain recursion with a call counter to show the blow-up, then add memoisation and re-count.
  • Convert the memoised version to a bottom-up table and state the two properties you relied on: each subproblem's result depends only on its arguments, and the dependencies form a DAG you can enumerate in order.
  • Rewrite one deep recursion with an explicit stack, then find the input length at which the original hits the interpreter's frame limit, which defaults to about a thousand frames in CPython, so you know when the rewrite is required rather than decorative.

Deliverable: One problem in three forms, naive, memoised and tabulated, with call counts for each and the input length at which recursion depth becomes the binding constraint.

Practice prompt ↗Practice prompt ↗Worked solution ↗
05Graphs, where most of the work is choosing the traversal
  • Implement BFS and DFS over one adjacency list, then answer for each which finds a shortest path in an unweighted graph and which you would use to detect a cycle in a directed graph, including why the in-progress versus finished distinction matters for the second.
  • Implement topological sort by in-degree, feed it a graph containing a cycle, and confirm the failure signature is that fewer than V nodes come out rather than an exception, then note that the order it produces is one of several valid ones.
  • Run a shortest-path search on a graph with a single negative edge weight and show the wrong answer, then write the precondition Dijkstra actually needs, non-negative weights, because it finalises a node's distance the first time that node is popped, and name the algorithm you would switch to and its own limit.

Deliverable: A small graph library with BFS, DFS and topological sort, plus two inputs that produce documented wrong answers under the wrong algorithm choice.

Practice prompt ↗Practice prompt ↗
06One day for everything that is not an algorithm
  • Sketch one system only to the depth a coding-heavy loop tends to reach: the endpoints, what the service stores, and the single query pattern that decides the schema. Stop at twenty-five minutes.
  • Prepare the project answer for an interviewer who codes, which means rehearsing the two levels they push to: the specific thing you built, and why you chose that approach over the alternative they will name. Open with a number and be ready to say what it excludes.
  • Prepare the answer to what you would do differently, choosing a real technical mistake with a specific fix rather than a complaint about process or staffing.

Deliverable: One design sketch at endpoint-and-schema depth, plus a project answer rehearsed to two levels of follow-up.

Practice prompt ↗Practice prompt ↗
07Solve out loud, under time
  • Do three timed problems at twenty-five minutes each in a plain editor with no autocomplete and no execution until the end, then tally separately the failures that were syntax and the ones that were approach, because those two numbers call for different fixes.
  • Narrate one solution from the first sentence, stating the approach and its complexity before writing any code, and rehearse the sentence you will use when you realise mid-solution that the approach is wrong.
  • Re-solve from blank the two problems you were slowest on this week and compare the times against the day they first appeared.

Deliverable: A recording of one fully narrated solution and a tally that separates syntax failures from approach failures.

Practice prompt ↗Practice prompt ↗Worked solution ↗

Expand any day for tasks and deliverables. Your progress is saved on this device.

When the requirements were thin, the interesting part is how you fenced the problem off: the assumption you wrote down, who you got to confirm it, the narrow version you shipped first so the rest stayed cheap to change. Guessing and being right is luck. Guessing in writing, where someone could correct you, is method.

How do you handle feedback during a case study presentation?

medium
behavioural and engineering judgement

How do you handle feedback during a case study presentation?

Approach
  1. Give the blast radius: what could have broken, and what you measured.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Name the disagreement and how you resolved it with evidence.
Follow-up
  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

What is your approach to working in cross-functional teams with logist…

medium
behavioural and engineering judgement

What is your approach to working in cross-functional teams with logistics consultants?

Approach
  1. Name the disagreement and how you resolved it with evidence.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Pick a story where you made the decision, not one where you watched it.
Follow-up
  • How did you know your change caused the improvement?
  • What would you do differently if you ran that again?

Tell me about a time you had to defend a technical decision to a stake…

medium
behavioural and engineering judgement

Tell me about a time you had to defend a technical decision to a stakeholder.

Approach
  1. Pick a story where you made the decision, not one where you watched it.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Close with what you would do differently, concretely.
Follow-up
  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?
  • 01

    How do you handle feedback during a case study presentation?

  • 02

    What is your approach to working in cross-functional teams with logistics consultants?

  • 03

    Tell me about a time you had to defend a technical decision to a stakeholder.

PracHub interview preparation framework ↗
Is this an official 4flow interview guide?

No. It is PracHub's own research and practice material for the Software Engineer role at 4flow. Rounds and questions reflect what candidates have reported, not a process 4flow has published, and they change over time. Confirm the current format and scope with your recruiter.

PracHub interview research ↗
How should I prepare for the case study portion?

Focus on structure. When presented with a problem, state your assumptions, outline your methodology, and explain your recommendations clearly. The goal is to show how you think, not necessarily to reach a perfect solution.

PracHub interview research ↗
Is the technical interview focused on LeetCode-style questions?

Not exclusively. 4flow tends to value practical knowledge and architectural thinking over rote memorization of algorithms. Be prepared to discuss your past projects and how you solved real-world engineering hurdles.

PracHub interview research ↗
What is the culture like at 4flow?

It is a professional, consultancy-driven environment. You will find that team members value clear communication, evidence-based decision-making, and a collaborative spirit.

PracHub interview research ↗
How long does the process take?

The process typically involves several rounds, including an HR screen, technical interviews, and a case study. Timelines can vary based on the specific team and region, so stay in regular contact with your recruiter.

PracHub interview research ↗
Sources & methodology 3 sources ↗

No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.