ACC · Software Engineer
Updated · 2026-09-24

ACC Software Engineer
Interview Questions & Guide 2026

THE 60-SECOND BRIEF

The Software Engineer role at ACC sits at the intersection of traditional industrial engineering and modern digital transformation. While ACC is a leader in the cement and construction materials industry, the Software Engineer is responsible for building the technical infrastructure that optimizes plant operations, supply chain logistics, and business-to-business (B2B) interactions. You are not just writing code; you are developing solutions that bridge the gap between heavy industrial machinery and data-driven efficiency.

If the loop includes an asynchronous take-home, treat it as a code review of you rather than as a puzzle: structure, what you chose to test, and what you wrote down about the constraint you were working under. Hold the stated time box and say what you would have done with more of it.

ACC candidates report 4 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.

Fold late, out-of-order scan events by event timeKeep a site operating during a network partitionReconcile a movement ledger against derived positions

36 min read

Browse Software Engineer questions

See the practice prompts

12Practice promptsAcross five skill areas
3With worked solutionsIncluded in the practice prompts

The Software Engineer role at ACC sits at the intersection of traditional industrial engineering and modern digital transformation. While ACC is a leader in the cement and construction materials industry, the Software Engineer is responsible for building the technical infrastructure that optimizes plant operations, supply chain logistics, and business-to-business (B2B) interactions. You are not just writing code; you are developing solutions that bridge the gap between heavy industrial machinery and data-driven efficiency.

Success in this role requires a unique balance of technical depth and industry curiosity. You will be expected to understand how your software impacts real-world physical processes—such as ball mill grinding or concrete mix design—while maintaining high standards for software architecture and scalability. Whether you are working on internal tools for plant management or platforms for channel sales, your work directly influences the operational throughput and market competitiveness of ACC.

01

Academic Screening

reported

When a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.

What to demonstrate

  • Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
  • Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
  • Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
  • Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened

How to prepare

  • Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
  • Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
  • Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure
PracHub interview research ↗
02

Online Assessment

reported

What this round decides is narrow: whether you can produce code that runs and is correct on inputs nobody showed you. An elegant solution that does not compile scores below a plain one that does, so write a correct brute force first, say out loud that you know its cost, and improve it with the working version still on screen. What separates strong answers is who finds the broken case. Trace your own code against an empty input, a single element, and duplicate keys before you say you are finished, because being told is far more expensive than noticing.

What to demonstrate

  • Whether degenerate inputs get checked without being asked for: an empty collection, one element, every element equal, and the extreme value the input type allows
  • Whether the complexity you state matches the code you actually wrote, including a sort or a copy sitting inside a loop
  • Whether the finished answer is verified against the worked examples before you call it done, rather than assumed correct because the code reads correctly

How to prepare

  • Take five problems you have already solved and, without running anything, write down what each returns for empty input, a single element, and all-duplicates. Then run them and count how many you predicted wrong.
  • Drill the brute force as its own skill: on ten problems, write only the obviously-correct slow version and time how long it takes to get it passing. If that is more than a few minutes, that is what to practise, not the optimal version.
  • Add a fixed last step before you submit anything, reading only the loop bounds and the initial value of each accumulator, which is where most off-by-one errors live
PracHub interview research ↗
03

Technical Interviews

reported

Most of the time lost in this format is not lost to thinking. It goes to a standard-library call you half-remember, an off-by-one in a loop bound, and a debugging loop that mutates code at random until something passes. When output is wrong, stop re-reading the whole function: take the smallest input that reproduces it and walk the state through by hand, printing intermediates if the environment allows. Guessing at a fix without a failing case you understand is how a five-minute bug becomes twenty, and the clock does not pause while you do it.

What to demonstrate

  • Whether you reach the right structure without a detour, and can write it from memory rather than only recall that one exists
  • Whether overflow is considered where the language has fixed-width integers, since a signed 32-bit value stops at 2,147,483,647 and then wraps in Java, is undefined behaviour in C++, and does not arise in Python, whose integers grow instead
  • Whether recursion depth is treated as a constraint on large inputs, given that CPython's default limit is 1000 frames and a deep recursion can exhaust the stack in any language where an iterative version would not
  • Whether a failing case is isolated and explained before any edit is made to the code

How to prepare

  • From an empty file and with no references open, implement the pieces you lean on most: a heap push and pop, an iterative DFS with an explicit stack, and a binary search whose midpoint is written lo + (hi - lo) / 2, which avoids the overflow that (lo + hi) / 2 can hit in a fixed-width integer type
  • Time yourself on the ten library calls you look up most, such as sorting with a custom comparator, splitting and joining strings, and finding the next key at or above a value in an ordered map, until the lookup is gone
  • Take a solution you know is broken and, before touching it, write one sentence naming the input, the expected value and the actual value. Repeat until you do it without deciding to.
PracHub interview research ↗
04

Final Interviews

reported

Where the day includes a partner from product, design or data, that conversation is weighted like the technical ones and prepared for least. They are deciding one thing: whether having you in the room makes their decisions cheaper. That means options with costs attached, not implementation detail and not "it depends". An estimate someone can plan against — a range, the assumption that would push it to the high end, and what you would drop to hit the low one — is worth more than a confident single number, which everyone present already knows is wrong.

What to demonstrate

  • Whether an estimate comes as a range with the assumption most likely to break it, and states what a specific scope cut would actually buy
  • Whether a technical constraint is handed over as a choice with consequences on their side, rather than as a verdict they have no standing to argue with
  • Whether you establish what decision is on the table before proposing anything
  • Whether risk is raised while it can still change the plan, with the trigger that would confirm it, instead of reported afterwards as a slip

How to prepare

  • Take a project that shipped late and write the two-sentence warning you could have given three weeks earlier, naming what you would have needed decided at that point
  • Rehearse one estimate out loud until it arrives in three parts: the range, the single assumption that would blow it, and the smallest thing you would cut to protect the date
  • Rewrite an objection you have actually made — the "we can't do that" version — as two options with their costs, so the choice ends up with the person who owns it
PracHub interview research ↗

PracHub editorial advice for the preparation topics above.

01

Holding a database transaction open across a physical or third-party operation

It is natural to open a transaction, lock the position, call the rating or tendering API, and commit on the response, and it works perfectly until the partner's p99 goes from 200 milliseconds to thirty seconds. At that point every request holding a lock on a hot item-node pair queues behind it, the connection pool fills with transactions that are waiting on the network rather than on the database, and an unrelated service sharing the pool fails at the same moment. In this domain the effect is amplified because demand concentrates on a few hot rows during a promotion or a seasonal peak, exactly when partner latency is also degraded. The structural fix is to keep transactions short and local - commit the state change together with an outbox row, let a relay perform the external call, and reconcile asynchronously - accepting at-least-once delivery and making the effect idempotent rather than trying to stretch a transaction over something the database cannot roll back.

02

Judging delivery windows and cut-offs in UTC

A delivery appointment, a receiving cut-off and a same-day promise are all statements about local wall-clock time at a specific stop, so evaluating them in UTC misclassifies on-time performance for any leg that crosses a zone, and misses cut-offs by an hour on the two days a year a region changes offset. The subtlety that catches experienced engineers is that converting a future local time to a UTC instant at write time bakes in the offset rules as they were known then: when a jurisdiction changes its rules, an appointment stored that way silently moves, which is why a future window is better stored as local wall time plus an IANA zone identifier and resolved at read time, while a past event is correctly stored as an instant. Duration arithmetic needs the same care, because a transit that spans a DST boundary is genuinely 23 or 25 hours long in local terms even though the elapsed instant count is unchanged. Storing only a date with no zone - common on partner feeds - is the version of this that cannot be fixed downstream, so the zone has to be captured at ingestion.

03

Designing for a scale nobody asked for

Ask for request rate, data size, read-to-write ratio and expected growth, then size the simplest option first; one relational instance on current hardware covers a large share of real workloads. Reaching for shards, queues and a cache tier before any number has been quoted reads as pattern-matching rather than judgement.

04

Issuing one query per row of a result set

Fetch related rows in a single batched query keyed by the ids you already hold, or join them into the original query. A per-row round trip multiplies network latency by the row count, and it looks perfectly fine against the ten rows in your development database.

Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.

9 technical prompts3 include a worked solution

Live coding problems to solve during the interview.

medium
data structures and algorithms

Live coding problems to solve during the interview.

Approach
  1. Name the brute-force solution and its complexity before improving on it.
  2. Walk one small example through your approach before writing the whole thing.
  3. State the target complexity and say which constraint rules the naive version out.
Follow-up
  • Which test case would catch an off-by-one here?
  • What is the worst case, and how likely is it on real data?

Size dock doors from overlapping appointment windows

mediumWorked solution
sweep lineintervalstime zones

For one node and one local calendar day you have up to 200,000 planned dock appointments from shipment_leg: leg_id, planned_arrive_at, planned_depart_at (both TIMESTAMPTZ), plus the node's IANA zone. A door is occupied over [arrive, depart). Return the minimum number of doors that lets every appointment start on time, and the maximal interval over which that peak is sustained. Target O(n log n). Say how you derive the day's boundaries and how you break ties between an arrival and a departure at the same instant.

Approach
  1. Name the result before computing it: with one interchangeable door type, the minimum door count equals the maximum number of simultaneously occupied intervals. That equality is not a heuristic — interval graphs are perfect, so their chromatic number equals their clique number, and greedy left-to-right assignment achieves it. Say this, because it is what licenses solving a scheduling question with a counter.
  2. Emit 2n endpoints, (t, +1) at each arrival and (t, -1) at each departure, sort by t, and at equal t order the -1 before the +1. Half-open occupancy means a trailer leaving at 10:00 frees the door for one arriving at 10:00; ordering arrivals first inflates the answer by exactly the number of back-to-back handoffs, which on a well-packed schedule is most of them.
  3. Scan once with a running counter, tracking the maximum and the endpoint index where it was first reached. The peak is attained on a half-open interval between two consecutive endpoints, [t_i, t_{i+1}), not at an instant — report it that way or the operations team cannot act on it. Extend the interval while the counter stays at the maximum.
  4. Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by planned_arrive_at from an index, use the min-heap variant instead — push each departure, pop all departures at or before the current arrival, and the heap size is the current occupancy. Same time bound, O(peak) space rather than O(n), which matters when peak occupancy is 40 and n is 200,000.
  5. Derive the day's boundaries from the zone, not from arithmetic on instants. Convert local midnight and the next local midnight to instants in the node's IANA zone; on a transition day that span is 23 or 25 hours, so adding 86,400 seconds silently drops or duplicates an hour of appointments. Decide explicitly what a zero-length dwell means — under half-open semantics it occupies nothing — and state it.
Worked solution 25 min
  1. Write the endpoint tuple with the tie-break baked into the sort key — for example (t, kind) where departure sorts as 0 and arrival as 1 — rather than handling ties in the scan body.
  2. Implement the scan, returning both the maximum and the [t_i, t_{i+1}) span at which it holds.
  3. Build a fixture of six appointments where three are strictly back-to-back at the same minute, and hand-compute the answer before running.
  4. Add an appointment spanning the local DST transition and derive the day window from the zone, asserting the appointment count inside the window.
  5. Re-run with the input shuffled to confirm the result depends only on the set of intervals.
EXPECTED RESULTThe back-to-back fixture needs one door, not three; the reported peak is a half-open interval between two endpoints; on the transition day the local window is 23 or 25 hours and no appointment is dropped or double-counted.
Follow-up
  • Doors are typed: some break pallets, some are parcel-only. Does max-overlap still equal the door count?
  • Appointments have a tolerance — a trailer may start up to 20 minutes late without penalty. How does that change the objective, and is it still solvable by a sweep?
  • Half the appointments are actuals and half are plans. Which do you sweep for tomorrow's staffing, and which for last week's utilisation report?

Trace a suspect lot forward to every shipped order line

medium
graph traversalgenealogyindexing

lot_edge(parent_lot_id, child_lot_id) has 400 million rows with btree indexes on both (parent_lot_id, child_lot_id) and (child_lot_id, parent_lot_id). lot_shipment(lot_id, order_line_id) maps lots to shipped lines. Given one suspect received lot, return every downstream order_line_id. The reachable subgraph can reach 2 million lots and 12 levels; the full edge table does not fit in memory. Give the traversal, its complexity in terms of the reachable subgraph, and what you do if the data contains a cycle.

Approach
  1. Genealogy is a directed acyclic graph, not a tree: a production run consumes several lots and one lot splits across many shipments, so a node is reached by several paths and a tree traversal revisits it combinatorially. Breadth-first from the suspect lot over the (parent_lot_id, ...) index, with a hash set of visited lot ids, is O(V' + E') where V' and E' count only the reachable subgraph — 2 million 8-byte ids is 16 MB of payload and a few tens of MB with open-addressing overhead, which is why the visited set is affordable and the edge table's 400 million rows never enter memory.
  2. Batch each level into one indexed read. Issue WHERE parent_lot_id = ANY($1) with a few thousand parents per call instead of a query per node: at 12 levels and 2 million nodes, per-node round trips dominate the wall clock entirely, and the recall's deadline is a real-world response time, not a query-plan aesthetic. The batch size is the tuning knob between round-trip count and per-statement planning cost.
  3. Keep the visited set even though the schema says DAG. Rework and repack loops — material returned into an earlier lot — do occur, and an unguarded traversal on a cyclic edge set does not terminate; a set membership test is O(1) and turns a hang into a correct answer plus a data-quality alert. Also cap the traversal by level and by node count, and fail loudly on the cap rather than returning a partial set silently.
  4. Join to lot_shipment once at the end over every visited lot id, not over the leaves and not per node. A lot is routinely both shipped and consumed: half a lot goes out on an order line while the other half is repacked into a child lot, so it has a lot_shipment row and outgoing edges at the same time and is not a leaf. Restricting the join to nodes with no outgoing edges drops exactly those order lines, which is under-recall — the one failure mode this trace is not allowed to have. One bulk join against an index on lot_id over the whole visited set is a single pass; per-node lookups multiply the round-trip problem by the number of visited lots.
  5. State the semantics honestly: reachability answers which shipped lines could contain material from the suspect lot, and without propagating edge quantities it is a superset of physical containment. For a recall that is the correct direction of error — over-recall, never under-recall — and saying so is the point, because a trace that returns quickly and incompletely will be believed. The upstream question, which received lots are in a suspect shipped unit, is the same traversal over the reverse index, which is why both indexes exist.
Follow-up
  • A recursive CTE would express this in ten lines. What is its cost here if the index on the traversal column is missing, and how would you notice?
  • You need the quantity of suspect material in each downstream line, not just reachability. What has to be on the edge, and what does that do to the traversal?
  • The traversal must run while a production run is writing new edges. What does a consistent answer mean here, and what do you cut it at?

For someone who has spent the last few years shipping features and reading other people's code, and who has not solved a timed problem from a blank file in a long time. Five days rebuild the primitives and the patterns that sit on them, working from invariants rather than remembered solutions, and the last two attach that back to the rest of the loop.

Small steps. Visible outcomes.0 / 7 completed
ONE WEEK · YOUR PACE

Prepare, practise & reflect

One practical outcome each day. Spend longer where you need it.

0 / 7 done
01Rebuild the primitives by implementing them
  • Implement a dynamic array with doubling growth and an operation counter, then change the growth rule to add a fixed sixteen slots instead, and time both for n of ten thousand, a hundred thousand and a million. The fixed-increment version resizes n/16 times at O(n) each, so its total work is quadratic; doubling is what makes append amortised constant.
  • Implement a hash map with separate chaining and a load-factor resize, then insert ten thousand keys engineered to land in one bucket and record what happens to lookup time, so that average-case O(1) becomes a claim with a stated precondition rather than a reflex.
  • For dynamic-array append and hash-map insert, write down which cost is amortised rather than worst-case, which single operation pays the whole bill, and what a system with a hard per-operation deadline would have to do instead.

Deliverable: Two working implementations plus a timing table showing the input at which each structure's advertised complexity stops holding.

Practice prompt ↗Practice prompt ↗Worked solution ↗
02Arrays under an invariant: two pointers, sliding window, binary search
  • Solve longest-subarray-with-sum-at-most-K using a sliding window, then run it on an input containing negative numbers and watch it return the wrong answer: extending the window only moves the sum monotonically when every element is non-negative, and that precondition is the whole reason the technique works.
  • Write the binary search that finds the first index satisfying a predicate rather than an exact value, put the loop invariant above the loop in a comment, and verify termination on the two inputs that break careless versions: the empty range, and a range where every element satisfies the predicate.
  • Compute the midpoint as lo + (hi - lo) / 2 and write one line on why the obvious (lo + hi) / 2 is a genuine defect in a fixed-width integer type and a non-issue in a language with arbitrary-precision integers.

Deliverable: Three solved problems, each with its invariant written above the loop, plus one recorded input on which the sliding window is provably wrong.

Practice prompt ↗Practice prompt ↗
03Sorting, heaps, and the greedy argument that has to be proved
  • Solve one top-k problem three ways, by full sort, by a size-k heap, and by quickselect, then write the values of n and k at which each becomes the right choice, along with quickselect's quadratic worst case and why a randomised pivot makes that unlikely rather than impossible.
  • Implement bottom-up heapify and count sift-down steps to confirm it does linear work rather than n log n, because most nodes sit near the bottom of the tree and therefore move only a short distance.
  • Take interval scheduling by earliest finishing time and write the exchange argument out in full: given any optimal schedule, swapping in the earliest-finishing interval keeps it feasible and no smaller. Then construct the weighted variant where that same greedy fails and name what has to replace it.

Deliverable: A three-way top-k comparison with measured crossover points, one written exchange argument, and one counterexample to a greedy rule that looks almost identical.

Practice prompt ↗Practice prompt ↗
04Recursion, memoisation, and the step to a table
  • Take one problem with overlapping subproblems, such as edit distance or coin change, instrument the plain recursion with a call counter to show the blow-up, then add memoisation and re-count.
  • Convert the memoised version to a bottom-up table and state the two properties you relied on: each subproblem's result depends only on its arguments, and the dependencies form a DAG you can enumerate in order.
  • Rewrite one deep recursion with an explicit stack, then find the input length at which the original hits the interpreter's frame limit, which defaults to about a thousand frames in CPython, so you know when the rewrite is required rather than decorative.

Deliverable: One problem in three forms, naive, memoised and tabulated, with call counts for each and the input length at which recursion depth becomes the binding constraint.

Practice prompt ↗Practice prompt ↗Worked solution ↗
05Graphs, where most of the work is choosing the traversal
  • Implement BFS and DFS over one adjacency list, then answer for each which finds a shortest path in an unweighted graph and which you would use to detect a cycle in a directed graph, including why the in-progress versus finished distinction matters for the second.
  • Implement topological sort by in-degree, feed it a graph containing a cycle, and confirm the failure signature is that fewer than V nodes come out rather than an exception, then note that the order it produces is one of several valid ones.
  • Run a shortest-path search on a graph with a single negative edge weight and show the wrong answer, then write the precondition Dijkstra actually needs, non-negative weights, because it finalises a node's distance the first time that node is popped, and name the algorithm you would switch to and its own limit.

Deliverable: A small graph library with BFS, DFS and topological sort, plus two inputs that produce documented wrong answers under the wrong algorithm choice.

Practice prompt ↗Practice prompt ↗
06One day for everything that is not an algorithm
  • Sketch one system only to the depth a coding-heavy loop tends to reach: the endpoints, what the service stores, and the single query pattern that decides the schema. Stop at twenty-five minutes.
  • Prepare the project answer for an interviewer who codes, which means rehearsing the two levels they push to: the specific thing you built, and why you chose that approach over the alternative they will name. Open with a number and be ready to say what it excludes.
  • Prepare the answer to what you would do differently, choosing a real technical mistake with a specific fix rather than a complaint about process or staffing.

Deliverable: One design sketch at endpoint-and-schema depth, plus a project answer rehearsed to two levels of follow-up.

Practice prompt ↗
07Solve out loud, under time
  • Do three timed problems at twenty-five minutes each in a plain editor with no autocomplete and no execution until the end, then tally separately the failures that were syntax and the ones that were approach, because those two numbers call for different fixes.
  • Narrate one solution from the first sentence, stating the approach and its complexity before writing any code, and rehearse the sentence you will use when you realise mid-solution that the approach is wrong.
  • Re-solve from blank the two problems you were slowest on this week and compare the times against the day they first appeared.

Deliverable: A recording of one fully narrated solution and a tally that separates syntax failures from approach failures.

Practice prompt ↗Worked solution ↗

Expand any day for tasks and deliverables. Your progress is saved on this device.

Bring the two or three numbers the story rests on and know how they were collected. A p99 whose timer starts inside your handler excludes the time a request spent queued, so it can sit flat while users wait longer. Give the window, the percentile and what the measurement left out, or drop the number.

Where do you see yourself after 5 years?

medium
behavioural and engineering judgement

Where do you see yourself after 5 years?

Approach
  1. Give the blast radius: what could have broken, and what you measured.
  2. Close with what you would do differently, concretely.
  3. State the situation in two sentences and spend the rest on the reasoning.
Follow-up
  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?

Tell me about how coal is ground in a ball mill.

medium
behavioural and engineering judgement

Tell me about how coal is ground in a ball mill.

Approach
  1. Give the blast radius: what could have broken, and what you measured.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Pick a story where you made the decision, not one where you watched it.
Follow-up
  • How did you know your change caused the improvement?
  • What did you decide not to do, and why?

How many hours continuously can you work?

medium
behavioural and engineering judgement

How many hours continuously can you work?

Approach
  1. Name the disagreement and how you resolved it with evidence.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Give the blast radius: what could have broken, and what you measured.
Follow-up
  • What did you decide not to do, and why?
  • How did you know your change caused the improvement?
  • 01

    Where do you see yourself after 5 years?

  • 02

    Tell me about how coal is ground in a ball mill.

  • 03

    How many hours continuously can you work?

PracHub interview preparation framework ↗
Is this an official ACC interview guide?

No. It is PracHub's own research and practice material for the Software Engineer role at ACC. Rounds and questions reflect what candidates have reported, not a process ACC has published, and they change over time. Confirm the current format and scope with your recruiter.

PracHub interview research ↗
How long should I spend preparing for the interview?

Give yourself at least 2–4 weeks of focused preparation. This allows you to brush up on both your technical coding skills and the domain-specific knowledge required to succeed at ACC.

PracHub interview research ↗
Is it necessary to know about the cement industry?

Yes, it is highly recommended. Understanding the basic processes of cement manufacturing and the terminology used in the industry will differentiate you from other candidates who focus solely on software.

PracHub interview research ↗
What is the most important part of the interview?

The technical rounds are critical. Be prepared to explain your thought process clearly, both when solving coding problems and when discussing your past project experiences.

PracHub interview research ↗
Is the atmosphere formal or relaxed?

Expect a professional and serious atmosphere. Interviewers at ACC are looking for candidates who are disciplined, reliable, and genuinely interested in the company’s operations.

PracHub interview research ↗
Sources & methodology 3 sources ↗

No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.