Anarock · Software Engineer
Updated · 2026-09-24

Anarock Software Engineer
Interview Questions & Guide 2026

THE 60-SECOND BRIEF

As a Software Engineer at Anarock, you are joining a team at the intersection of real estate and cutting-edge technology. You will be responsible for building, scaling, and maintaining the digital infrastructure that powers one of India’s leading property consultancy platforms. Your work directly influences how thousands of users discover, evaluate, and transact in the real estate market, making your contributions highly visible and impactful.

Scope in the operational half of the job when the seat carries on-call. Rollout, rollback and what you would put on a dashboard belong inside a design answer rather than after it, and an answer that never reaches them reads as someone who has built systems but not run them.

Anarock candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.

Build at-least-once pipelines with explicit deduplication horizonsMake every write idempotent under client retriesKeep money in integer minor units

34 min read

Browse Software Engineer questions

See the practice prompts

14Practice promptsAcross five skill areas
3With worked solutionsIncluded in the practice prompts

As a Software Engineer at Anarock, you are joining a team at the intersection of real estate and cutting-edge technology. You will be responsible for building, scaling, and maintaining the digital infrastructure that powers one of India’s leading property consultancy platforms. Your work directly influences how thousands of users discover, evaluate, and transact in the real estate market, making your contributions highly visible and impactful.

The role demands a balance of technical rigor and business acumen. You will work on complex systems that require high availability and performance, often navigating the unique challenges of the prop-tech domain. Whether you are optimizing backend services, designing scalable databases, or refining user-facing features, your work is critical to delivering a seamless experience for both property buyers and internal stakeholders. You will thrive here if you enjoy solving real-world problems that require both clean code and a deep understanding of how your solutions serve the business.

01

Initial Screening

reported

The title covers product work, platform work, infrastructure, mobile and frontend, and those are different jobs with different loops behind them. A screening call is the cheapest place to find out which one the seat is, and asking reads as experienced rather than fussy. The questions that separate them: what the team is on call for, what the last three projects were, and whether any round happens inside an existing repository instead of a blank file. Then say which of that you have done and which you have not. Claiming the whole posting is the fastest way to be found out one round later.

What to demonstrate

  • Whether you can locate your experience inside one flavour of the role honestly instead of claiming the entire requirements list
  • Whether you name what you have not done, which an experienced screener reads as a level signal and can plan the loop around
  • Whether what you want next matches what the seat is: someone who wants greenfield work landing on a team that mostly operates an existing system is a hire that leaves within the year

How to prepare

  • Mark every line of the posting as done, adjacent or new, and write one sentence for each adjacent line naming the closest thing you actually built
  • Split your last two years into rough percentages across feature work, operating and debugging live systems, and design or review, so a question about scope gets numbers rather than adjectives
  • Bring three questions that discriminate between seats: what the team is paged for, how much of the work is changing existing code versus standing up something new, and what shipped in the last quarter
PracHub interview research ↗
02

Technical Assessments

reported

Input bounds are the part of the prompt most often skimmed, and they usually contain the answer. They tell you which complexity class is admissible, which narrows the search before you have thought about the problem itself. As a rough planning figure, a compiled language does on the order of 10^8 simple operations per second and an interpreted one roughly an order of magnitude less. So n up to about twenty admits enumerating subsets, a few thousand admits a quadratic pass, and a million admits neither: you need near-linear, or linear with a log factor. If the bounds are missing, ask for them.

What to demonstrate

  • Whether the approach is justified by the stated input size rather than by whichever pattern you recognised first
  • Whether you ask about the properties that change the algorithm: whether the input arrives sorted, whether duplicates occur, whether values are bounded integers, whether it all fits in memory
  • Whether you can name the bottleneck in your own solution and what would remove it, even when you deliberately leave it in place
  • Whether a claimed speedup is real, since memoising a recursion only helps when subproblems genuinely overlap and the state can be keyed cheaply

How to prepare

  • For each algorithm you rely on, write down the largest n it handles in roughly a second, then check two of those figures by timing them in the language you will actually type in
  • For two weeks, write one line naming your target complexity and the bound that justifies it before you write any code, then compare that line with what you ended up submitting
  • Practise the conversion backwards: given a required O(n log n), list the mechanisms that get you there (sorting, a heap, an ordered map, divide and conquer) and choose by what the problem needs to query, not by what you used last
PracHub interview research ↗
03

Managerial Round

reported

Because the format is not fixed, the first job in the room is classification. Listen to the opening question and decide what it is: a probe into work you have already described, a fresh problem to solve now, or a conversation about how you operate. Each wants a different register, and the common failure is forcing a rehearsed structure onto a question that did not ask for it. Running a full design ritual on a ten-minute debugging question reads as not listening. When you cannot tell which it is, ask how long they want to spend and answer at that depth.

What to demonstrate

  • Whether the shape of your answer matches the question, so a yes-or-no gets answered before it is justified and an open prompt gets a direction before a detour
  • Whether you check how much depth is wanted instead of deciding for them, and whether you stop when the answer is complete rather than continuing until someone interrupts
  • Whether you can be redirected in the middle of an answer without restarting it from the beginning
  • Whether a question outside your experience gets an honest boundary followed by reasoning from what you do know, instead of a confident answer with nothing behind it

How to prepare

  • Rehearse one project at three lengths, roughly thirty seconds, three minutes, and a full walkthrough at the depth of a design review, and practise switching between them when someone interrupts mid-telling
  • Have someone ask you five questions of deliberately mixed type in one sitting without telling you the types, and score only whether you identified each one correctly before you started answering
  • Draft the sentence you will use to check depth, along the lines of asking whether the short version is useful here or they want the detail, and use it in a real conversation this week so the day of the round is not its first outing
PracHub interview research ↗

PracHub editorial advice for the preparation topics above.

01

Treating a timed-out write as a failed write

A timeout says the response did not arrive, not that the work did not happen; the server may well have committed and then lost the connection. Retrying a non-idempotent create after a timeout is the standard way to end up with two of something, and those duplicates land precisely when the system is already degraded and least able to absorb them. The discipline is to treat a timeout as unknown: either the write carries an idempotency key so the retry is safe by construction, or the client re-reads authoritative state before deciding what to do, and the interface says unknown rather than showing a failure that invites a second click.

02

Paginating a growing table with limit and offset

Two unrelated defects share the idiom. Correctness: rows inserted or deleted between page requests shift the window, so a consumer walking an export skips rows and sees others twice, which for a customer-facing sync is silent data loss rather than an error anyone notices. Cost: the database still produces and discards the skipped rows, so page N costs time proportional to N times the page size and a deep page on a large table degrades from milliseconds to seconds. Keyset pagination over a stable, unique, indexed ordering -- where (created_at, id) < ($1, $2) order by created_at desc, id desc limit $3 -- is constant-cost per page and immune to shifting, on the precondition that the cursor columns never change value for a row, which disqualifies updated_at as a cursor.

03

Assuming the bug is in the framework

Suspect your own code first: read the stack trace top to bottom, check which versions are actually installed rather than which ones you believe are, and reproduce in isolation before blaming a library that thousands of people run daily. When the fault really is upstream, you need that minimal reproduction to say so credibly anyway.

04

Not asking what the system looks like if it dies halfway through

For any multi-step write, say what state remains if the process stops between step two and step three, and what brings it back: a single transaction, a saga with compensating actions, an outbox, or a reconciliation job. Partial failure is routine at any real call volume, so 'that shouldn't happen' is an answer with nothing behind it.

Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.

11 technical prompts3 include a worked solution

Tree reconstruction using pre-order and in-order traversal

medium
data structures and algorithms

Tree reconstruction using pre-order and in-order traversal

Approach
  1. Name the brute-force solution and its complexity before improving on it.
  2. State the target complexity and say which constraint rules the naive version out.
  3. Walk one small example through your approach before writing the whole thing.
Follow-up
  • What is the worst case, and how likely is it on real data?
  • Which test case would catch an off-by-one here?

Basic Swift concepts including UIKit, Foundation, MVC, and MVVM

medium
data structures and algorithms

Basic Swift concepts including UIKit, Foundation, MVC, and MVVM

Approach
  1. Name the brute-force solution and its complexity before improving on it.
  2. State the target complexity and say which constraint rules the naive version out.
  3. Restate the input: its shape, its size, and what is guaranteed about it.
Follow-up
  • Which test case would catch an off-by-one here?
  • How does this change if the input no longer fits in memory?

Implement a rate limiter to handle different limits for different user…

medium
data structures and algorithms

Implement a rate limiter to handle different limits for different user tiers

Approach
  1. Choose the data structure from the access pattern, not from familiarity.
  2. Walk one small example through your approach before writing the whole thing.
  3. State the target complexity and say which constraint rules the naive version out.
Follow-up
  • What is the worst case, and how likely is it on real data?
  • How does this change if the input no longer fits in memory?

Explain thread safety and state persistence in a distributed system

medium
data structures and algorithms

Explain thread safety and state persistence in a distributed system

Approach
  1. Walk one small example through your approach before writing the whole thing.
  2. Choose the data structure from the access pattern, not from familiarity.
  3. State the target complexity and say which constraint rules the naive version out.
Follow-up
  • How does this change if the input no longer fits in memory?
  • What is the worst case, and how likely is it on real data?

Schedule ordered webhook retries with a heap of subscription queues

mediumWorked solution
heapschedulingbackoffhead-of-line-blocking

Design the in-memory scheduler for webhook delivery. Up to 20 million rows sit in status pending or failed_retryable across 200,000 subscriptions, each row carrying next_attempt_at and attempt_count, and each endpoint having a circuit breaker. Deliveries for one subscription must be attempted in order, so at most one attempt per subscription may be in flight. Support due(now), complete(delivery, outcome) and insert(delivery) in O(log S), where S is the subscription count rather than the delivery count. Give the backoff formula you schedule retries with.

Approach
  1. Key the global heap by subscription, not by delivery. Each subscription owns a FIFO of its due deliveries in event order; the heap holds one entry per eligible subscription, keyed by its head's next_attempt_at. That is 200,000 heap entries instead of 20 million, and it makes the one-in-flight rule structural rather than a check somebody can forget.
  2. due(now): peek the minimum. If its key is in the future, sleep until then instead of spinning. Otherwise pop it, move the subscription into an in-flight set, and do not re-push it. A subscription absent from the heap cannot be dispatched twice, which is precisely how ordering is preserved.
  3. complete: on success, drop the head and re-push the subscription keyed by its new head, or leave it out when the queue empties. On a retryable failure, increment attempt_count and set next_attempt_at = now + uniform(0, min(cap, base * 2^attempt)), sampled uniformly across the whole interval. That is full jitter; deterministic backoff re-synchronises the herd you just created.
  4. Circuit breaker: park the subscription in a second heap keyed by its half-open time, so an endpoint dead for six hours costs one heap entry and zero attempts rather than consuming worker slots. Admit exactly one probe at half-open and close the breaker only on its success.
  5. Say the price of the ordering guarantee out loud. One in-flight attempt per subscription means an endpoint answering in 10 seconds drains at 0.1 deliveries/second however many workers you run, and its backlog grows until it recovers. If the customer does not need order, allow k in flight and document delivery as unordered; that is the trade, and it is a product decision.
  6. All three operations are O(log S) with O(S) resident heap memory and the queues themselves backed by the store. The database-backed equivalent is a partial index on (subscription_id, next_attempt_at) where status in ('pending','failed_retryable') claimed with FOR UPDATE SKIP LOCKED, and the write-back must be fenced on lease_token so a worker that stalled and resumed cannot overwrite a newer attempt.
Worked solution 30 min
  1. Define the four structures explicitly: queues: subscription_id -> deque[delivery], ready: min-heap of (next_attempt_at, subscription_id), inflight: set[subscription_id], breaker: min-heap of (half_open_at, subscription_id).
  2. Write down the invariant you will assert after every operation: a subscription appears in at most one of ready, inflight and breaker, never in two.
  3. Implement due, complete and insert, then simulate 200,000 subscriptions with Zipf-distributed queue depths totalling 20 million deliveries.
  4. Add one endpoint that always times out after 10 seconds and one that always answers in 20 ms, then measure the fast endpoint's throughput with and without the per-endpoint breaker.
  5. Instrument heap size across the run.
EXPECTED RESULTHeap size stays at or below 200,000 regardless of the 20 million deliveries. The fast endpoint's throughput is unaffected by the dead one once the breaker trips. The dead endpoint's deliveries accumulate in their own deque and cost exactly one heap entry.
Follow-up
  • One subscription has 4 million queued deliveries. What stops it from starving the other 199,999, and what does your heap look like under that load?
  • A customer requests redelivery of last Tuesday's events. Where do those rows enter your structure, and what keeps them from reordering live traffic?
  • The process restarts. How much state do you rebuild, and what stops every subscription from being attempted in the same second?

Roughly ninety minutes on weeknights with one longer weekend block. The plan cuts scope rather than compressing everything, on the assumption that one thing finished per night beats four half-started.

Small steps. Visible outcomes.0 / 7 completed
ONE WEEK · YOUR PACE

Prepare, practise & reflect

One practical outcome each day. Spend longer where you need it.

0 / 7 done
01Fix the scope and take a cold baseline
  • Read the role description and write the three things the loop will almost certainly test, then write an explicit not-doing list and keep it visible all week.
  • Take one twenty-five-minute coding problem and one fifteen-minute design prompt cold, and write the single sentence naming what blocked each, because those two sentences decide where the remaining evenings go.
  • Set the week's rule: one thing finished every night, including the night you only have forty minutes.

Deliverable: A one-page scope with a not-doing list and two cold attempts, each carrying one sentence on what blocked it.

Practice prompt ↗Practice prompt ↗Worked solution ↗
02One pattern, written three times from blank
  • Choose the single pattern most likely to appear in your loop and write it three times from an empty file rather than editing the previous attempt.
  • On the third pass, write the invariant as a comment before the loop body and the complexity before the first line of code.
  • Stop at ninety minutes even if the third version is imperfect, and write the one thing you would fix given another hour.

Deliverable: Three independent implementations of the same pattern plus a note on what changed between them.

Practice prompt ↗Practice prompt ↗
03One design, only to the depth you can defend
  • Take one system shape and go only as far as requirements, interface and data model, refusing to draw a box you could not survive a follow-up about.
  • Attach one number to each non-functional requirement, deriving it rather than asserting it, and write the assumption the number rests on.
  • Write the one tradeoff you are choosing against and the observation that would make you reverse it.

Deliverable: One design at interface-and-schema depth with derived numbers and one written reversible tradeoff.

Practice prompt ↗Practice prompt ↗
04Only the fundamentals you will have to defend
  • Write, in under two hundred words each, the answers to the two questions that follow almost any implementation: why this structure and not the obvious alternative, and what happens to this code at a hundred times the input.
  • Write what an index actually costs: faster lookups on the indexed columns against a write that now maintains a second structure, plus the cases where the planner declines to use it anyway, low selectivity, or a predicate wrapping the column in a function.
  • Delete any answer you cannot deliver aloud in under a minute, since an answer that needs reading is not an answer you have.

Deliverable: Three written answers, each under two hundred words and each timed aloud.

Practice prompt ↗Practice prompt ↗Worked solution ↗
05Your own work, timed
  • Write a ninety-second and a four-minute version of your main project and time both aloud rather than reading them.
  • Prepare the two follow-ups that always come: what you would do differently, and how you knew it worked.
  • Put one number in the first sentence and be ready to say exactly where it came from and what it excludes.

Deliverable: Two timed narratives with one defensible number in the opening line.

Practice prompt ↗Practice prompt ↗
06The one full rehearsal, in the weekend block
  • Run a sixty-minute mock covering a coding round and a design round in one sitting with no break, because sustained attention is the thing evenings have not trained.
  • Immediately afterwards, and before hearing any feedback, write the three moments you lost the thread.
  • Spend the rest of the block only on those three moments, and on nothing you merely feel shaky about.

Deliverable: Mock notes naming three failure moments with a specific fix written under each.

Practice prompt ↗Practice prompt ↗
07Taper
  • Write the twenty-minute warm-up you will actually do on the morning: one problem you can already solve from a blank file, one design you can narrate, and nothing you have never seen.
  • Re-read only your own notes from this week and open no new material.
  • Write the logistics down: the editor or shared document you will be working in, whether execution and lookups are permitted, and the sentence you will use when you do not know something.

Deliverable: A one-page card holding the design structure, the project numbers, and the logistics.

Practice prompt ↗Practice prompt ↗Worked solution ↗

Expand any day for tasks and deliverables. Your progress is saved on this device.

For anything that touched live traffic, be ready to say how you would have undone it: a flag, a staged rollout, dual writes with the old path still authoritative. Once the old column is dropped or the source rows are overwritten there is no reverse, so name what you kept a copy of and for how long.

Why are you interested in the prop-tech space?

medium
behavioural and engineering judgement

Why are you interested in the prop-tech space?

Approach
  1. Give the blast radius: what could have broken, and what you measured.
  2. Pick a story where you made the decision, not one where you watched it.
  3. Close with what you would do differently, concretely.
Follow-up
  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?

How do you manage pressure during high-stakes project implementation?

medium
behavioural and engineering judgement

How do you manage pressure during high-stakes project implementation?

Approach
  1. Pick a story where you made the decision, not one where you watched it.
  2. Close with what you would do differently, concretely.
  3. Give the blast radius: what could have broken, and what you measured.
Follow-up
  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

Estimate a tenant-leading index migration you have never run

hard
estimationonline migrationindex buildsuncertainty

Someone needs a date. usage_event carries an index on (occurred_at) and needs (tenant_id, occurred_at); the largest tenant holds roughly a hundred times the median tenant's rows, the table is partitioned daily with years of retention, and you have never run a migration on a table this large. Give an estimate you would defend: how you decompose the work, the two or three numbers you would go and measure first, the range and confidence you state, and what you commit to when the person asking needs a single date today.

Approach
  1. Refuse the bare number and then give one anyway, in the form that is actually useful: a range plus the measurement that collapses it. 'Four to eleven days; one afternoon building this index on a restored copy of the largest partition takes that to within a day' is an answer, while 'it depends' is not.
  2. Decompose by failure mode rather than into equal chunks, because that is where estimates go wrong. On a partitioned parent you create the index ON ONLY the parent, build each partition's index with CREATE INDEX CONCURRENTLY, then ALTER INDEX ... ATTACH PARTITION, at which point the parent index becomes valid. CONCURRENTLY does not block writes but scans each partition twice, waits out older transactions, cannot run inside a transaction block, and on failure leaves an invalid index you must drop concurrently and retry.
  3. Name the two unknowns that dominate and price them: build time on one restored partition of realistic size, and whether the planner actually chooses the new index for the skewed tenant, since selectivity for a tenant holding most of the rows is a different question from selectivity for the median tenant. Both are half-day measurements against a replica, and both are cheaper than being wrong by a week.
  4. State the assumptions the range is conditional on, because that is what makes a slip a re-estimate instead of a credibility event: no partition above a stated row count, one concurrent build at a time so it does not compete with ingest for I/O, and an ingest backlog that can absorb the added write amplification while both indexes exist.
  5. Budget the step nobody budgets: verification and the old index's removal. Dropping the old index is fast, but deciding it is safe to drop means confirming no plan still uses it, and that confirmation waits on real traffic across a full weekly cycle rather than on your patience.
  6. Answer the single-date request honestly. Commit to a date for the first checkpoint — the measured build number from the replica — and to re-estimating on that date, and say plainly what you are not committing to yet. A date with a scheduled re-estimate is worth more to the asker than a confident wrong one, and you should say why in those words.
Follow-up
  • The concurrent build fails half way through the largest partition. What is the state of the database and what do you do next?
  • Your estimate slips by sixty percent. Which assumption broke, and at what point would you have known?
  • The person asking needs the date for a customer commitment. Does your answer change?
  • 01

    Why are you interested in the prop-tech space?

  • 02

    How do you manage pressure during high-stakes project implementation?

  • 03

    Someone needs a date. usage_event carries an index on (occurred_at) and needs (tenant_id, occurred_at); the largest tenant holds roughly a hundred times the median tenant's rows, the table is partitioned daily with years of retention, and you have never run a migration on a table this large. Give an estimate you would defend: how you decompose the work, the two or three numbers you would go and measure first, the range and confidence you state, and what you commit to when the person asking needs a single date today.

PracHub interview preparation framework ↗
Is this an official Anarock interview guide?

No. It is PracHub's own research and practice material for the Software Engineer role at Anarock. Rounds and questions reflect what candidates have reported, not a process Anarock has published, and they change over time. Confirm the current format and scope with your recruiter.

PracHub interview research ↗
How difficult are the technical interviews?

The difficulty is generally considered average, provided you are well-prepared in core CS fundamentals. Consistent practice with coding problems and system design scenarios will make the rounds feel manageable.

PracHub interview research ↗
What is the typical timeline for the interview process?

You can expect the process to take approximately three weeks from your initial application to a final decision. This timeframe allows for the multiple stages of evaluation, including coding and behavioral rounds.

PracHub interview research ↗
How can I stand out as a candidate?

Be proactive in your communication. If you make a mistake, acknowledge it, explain why it happened, and demonstrate how you would fix it. This level of self-awareness is highly valued by the hiring team.

PracHub interview research ↗
Is the work culture collaborative?

Yes, Anarock emphasizes a team-oriented environment where engineers work closely with product and operations teams. Showing that you are a team player who values cross-functional success is key.

PracHub interview research ↗
Sources & methodology 3 sources ↗

No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.