ARRK Engineering · Software Engineer
Updated · 2026-09-24

ARRK Engineering Software Engineer
Interview Questions & Guide 2026

THE 60-SECOND BRIEF

As a Software Engineer at ARRK Engineering, you sit at the intersection of cutting-edge automotive technology and complex system integration. The company is a premier partner for the automotive industry, meaning your work directly influences the next generation of ADAS (Advanced Driver Assistance Systems), Digital Cockpits, and Autonomous Systems. You are not just writing code; you are building the software infrastructure that defines how vehicles perceive their environment and interact with drivers.

The shape of the workload matters more for your prep than the industry label does. Read-heavy serving, write-heavy ingestion and scheduled batch processing have different binding constraints and fail in different places, so find out which one the team lives in before picking design topics.

ARRK Engineering candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.

Paginate large result sets with keyset cursorsDetect concurrent edits instead of losing writesTrace a symptom to a mechanism under load

38 min read

Browse Software Engineer questions

See the practice prompts

13Practice promptsAcross five skill areas
3With worked solutionsIncluded in the practice prompts

As a Software Engineer at ARRK Engineering, you sit at the intersection of cutting-edge automotive technology and complex system integration. The company is a premier partner for the automotive industry, meaning your work directly influences the next generation of ADAS (Advanced Driver Assistance Systems), Digital Cockpits, and Autonomous Systems. You are not just writing code; you are building the software infrastructure that defines how vehicles perceive their environment and interact with drivers.

This role is critical to the ARRK Engineering mission of providing high-end engineering services to major global manufacturers. You will work in environments that demand high levels of precision, often dealing with the challenges of embedded software, real-time performance, and complex data processing. Because the projects are often tied to major vehicle platforms, the impact of your code is both tangible and visible on the road.

The environment is highly collaborative and technical. You will be expected to bridge the gap between abstract system requirements and functional, reliable software implementations. If you enjoy working on complex mechanical-digital interfaces and are comfortable in a fast-paced, project-driven engineering firm, this role offers a unique opportunity to shape the future of mobility.

01

Initial Introductions

reported

An unlabelled round is first an information problem, and the cheapest information is free. Whoever schedules it can usually tell you how long it runs, who will be in the room and what they work on, whether you will be writing code and in what environment, and whether anything is being sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.

What to demonstrate

  • Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
  • Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
  • Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating

How to prepare

  • Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
  • Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
  • Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes
PracHub interview research ↗
02

Technical Discussions

reported

The same problem is scored by two different mechanisms depending on the format, and preparing for one does not cover the other. With a person watching, partial progress is visible and a hint is a correction you can absorb; silence is the expensive failure, because nobody can read a half-written function. With an automated grader there is no partial credit for what you were about to do, nobody to ask, and the worked examples in the prompt are the entire specification. Read them as a contract, down to whether an empty result should be an empty list or no output at all.

What to demonstrate

  • In a live session, whether your commentary tracks what your hands are doing, and whether a hint redirects you or gets defended against
  • In an automated one, whether you cover the cases the examples do not show, since the hidden cases are where the score moves
  • Whether you manage the clock on purpose: abandoning an approach that is not converging while there is still time to write something simpler that finishes

How to prepare

  • Have someone hand you a problem and feed you one deliberately wrong hint. Practise testing it against a concrete case instead of accepting or rejecting it on authority.
  • Do one timed run a week in a plain browser editor with autocomplete, linting and your own snippets switched off, which is closer to what these environments give you
  • For the automated format, write the harness before the solution: a main that feeds the worked examples plus an empty and a single-element case and prints expected against actual, so a wrong submission is caught by you first
PracHub interview research ↗
03

In-Depth Evaluations

reported

Input bounds are the part of the prompt most often skimmed, and they usually contain the answer. They tell you which complexity class is admissible, which narrows the search before you have thought about the problem itself. As a rough planning figure, a compiled language does on the order of 10^8 simple operations per second and an interpreted one roughly an order of magnitude less. So n up to about twenty admits enumerating subsets, a few thousand admits a quadratic pass, and a million admits neither: you need near-linear, or linear with a log factor. If the bounds are missing, ask for them.

What to demonstrate

  • Whether the approach is justified by the stated input size rather than by whichever pattern you recognised first
  • Whether you ask about the properties that change the algorithm: whether the input arrives sorted, whether duplicates occur, whether values are bounded integers, whether it all fits in memory
  • Whether you can name the bottleneck in your own solution and what would remove it, even when you deliberately leave it in place
  • Whether a claimed speedup is real, since memoising a recursion only helps when subproblems genuinely overlap and the state can be keyed cheaply

How to prepare

  • For each algorithm you rely on, write down the largest n it handles in roughly a second, then check two of those figures by timing them in the language you will actually type in
  • For two weeks, write one line naming your target complexity and the bound that justifies it before you write any code, then compare that line with what you ended up submitting
  • Practise the conversion backwards: given a required O(n log n), list the mechanisms that get you there (sorting, a heap, an ordered map, divide and conquer) and choose by what the problem needs to query, not by what you used last
PracHub interview research ↗

PracHub editorial advice for the preparation topics above.

01

Shipping a migration and the code that depends on it as a single change

During any rolling deploy, and for as long as a rollback remains possible, old and new code execute against the same schema at the same time. A migration that drops or renames a column breaks every instance that has not restarted yet, and code that requires a column the migration has not applied breaks every instance that restarted early. The discipline is expand then contract: add the new column nullable, write both shapes, backfill in batches, move reads across once the backfill is verified, and only then stop writing the old shape and drop it - four deploys, usually spread over days. It feels disproportionate until the first rollback, at which point it is the only reason the previous version still runs.

02

Paginating with LIMIT/OFFSET over a set that changes while the client is reading it

OFFSET n makes the database produce and discard n rows before returning anything, so the cost of a page grows with its depth rather than with its size and page 500 costs five hundred pages of work. The correctness problem is worse than the cost: if a row is inserted or reordered between two page fetches, rows shift across the offset boundary and are either skipped entirely or returned twice, and neither outcome leaves any trace in the response for the client to detect. Keyset pagination - WHERE (sort_key, id) < ($last_sort_key, $last_id) ORDER BY sort_key DESC, id DESC LIMIT n, backed by an index in exactly that order - reads only the rows it returns and is stable against concurrent inserts. It requires the tie-break column: a timestamp is not unique, and duplicate sort keys straddling a page boundary reintroduce the skip it was adopted to remove.

03

Issuing one query per row of a result set

Fetch related rows in a single batched query keyed by the ids you already hold, or join them into the original query. A per-row round trip multiplies network latency by the row count, and it looks perfectly fine against the ten rows in your development database.

04

Naming no test cases at all

State what you would test before being asked: empty input, a single element, all elements equal, the maximum permitted size, and the input that exercises the branch you just wrote. It costs thirty seconds and is much of what separates someone who has shipped code from someone who has only solved puzzles.

Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.

9 technical prompts3 include a worked solution

Find overlapping job attempts and peak concurrency from lease records

medium
sweep lineintervalsleases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach
  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
  5. State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
  6. Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.
Follow-up
  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
  • How would you compute both answers incrementally as records arrive rather than in a daily batch?

Collapse a redelivered event batch into per-aggregate high-water marks

easy
hashingat-least-onceaggregation

You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.

Approach
  1. One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
  2. Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
  3. Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
  4. If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
  5. Reject sorting the batch by (aggregate_id, version) as the default. It is O(n log n) and buys nothing, because max is associative and commutative and needs no ordering; sorting earns its cost only when the downstream consumer must receive the events in order rather than a per-aggregate winner.
  6. Separate the two mechanisms out loud: in-batch deduplication does not make the consumer idempotent, because the same event redelivered tomorrow arrives in a different batch entirely. The projection write itself still has to be keyed on (aggregate_id, version).
Follow-up
  • The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
  • How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
  • Two events for one aggregate carry the same version with different payloads. Which one is wrong, and how would you find out?

Merge partitioned event streams into one ordered feed with bounded lateness

hardWorked solution
k-way mergewatermarksout-of-order streams

The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.

Approach
  1. Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
  2. Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
  3. Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
  4. Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.
  5. Choose the late-event policy from what the projection is keyed on. The projection upserts on (aggregate_id, aggregate_version) and discards a version it has already applied, so a late event is safe to apply out of order and correctness never depended on the merge at all. Apply it, recompute the affected feed page, and count lateness so the 30-second budget can be re-derived from data rather than folklore.
  6. Say what the merge does not buy: ordering is guaranteed within one aggregate by the log's partitioning, and no watermark makes the cross-aggregate order authoritative. Two events from different aggregates in the same millisecond have no true order, so the feed's order is a presentation choice that must be stable rather than correct.
Worked solution 35 min
  1. Write the heap comparator on (occurred_at, event_id) and the per-partition head refill.
  2. Write the watermark computation and the emit-loop condition, then list which buffered events are held at a chosen instant.
  3. Compute the buffer at 4,000 events per second, 30 seconds and 1 KB per event, and state what fraction of a worker's heap that represents.
  4. Add the idle-partition marker and trace the watermark with one silent partition, both with and without the marker.
  5. Write the late-event path and name the key that makes applying it safe.
EXPECTED RESULTA 64-way min-heap merge at O(n log P) with a deterministic (occurred_at, event_id) comparator, a watermark of the per-partition minimum less 30 seconds gating emission, a stated buffer of 120,000 events and roughly 120 MB, idle markers so a silent partition cannot freeze the watermark, and a late-event policy justified by the projection's idempotency on (aggregate_id, aggregate_version).
Follow-up
  • The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
  • The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?
  • One partition is ten minutes behind because its producer is slow. Do you stall the feed or emit without it?

For a candidate senior enough that the loop turns on design and judgement rather than on whether the coding round gets finished. Five days build one system properly and then stress it; coding gets a single maintenance day, on the assumption that the risk at this level is an unexamined tradeoff rather than a missed algorithm.

Small steps. Visible outcomes.0 / 7 completed
ONE WEEK · YOUR PACE

Prepare, practise & reflect

One practical outcome each day. Spend longer where you need it.

0 / 7 done
01Numbers before diagrams
  • Build your own reference card of the figures you will re-derive all week: bytes for a realistic record, requests per second implied by a given daily active count, and the storage that a year at a given write rate produces. Derive each one rather than copying it, because the derivation is what survives a follow-up.
  • Turn one product statement into capacity requirements. From ten million daily users at four writes and forty reads each, state the peak-to-average factor you are assuming and why, then produce peak write QPS, peak read QPS and a year of storage.
  • Write the two numbers whose order of magnitude changes the design, the read-to-write ratio and the working-set size against memory per node, and state the threshold at which each one flips your answer.

Deliverable: A one-page numbers card and one worked capacity estimate with every assumption written down.

Practice prompt ↗Practice prompt ↗Worked solution ↗
02One system, from requirements to schema
  • Spend the first ten minutes producing only functional requirements, non-functional targets with numbers attached, a p99 latency, a durability expectation, a consistency requirement, and an explicit out-of-scope list.
  • Define the interface before the boxes: the three or four endpoints, their parameters, what each returns, and which of them are idempotent.
  • Write the data model, then write the single access pattern that justifies it, and state what the schema would have to become if the dominant access pattern were the other one.

Deliverable: One design carried to endpoint-and-schema depth, with non-functional targets expressed as numbers and a written out-of-scope list.

Practice prompt ↗Practice prompt ↗
03The consistency you are actually buying
  • Write out what a client sees under asynchronous replication when its write commits on the leader and its next read is served by a lagging follower, then write the two fixes, pinning that session's reads to the leader for a bounded window or carrying a version token the replica must reach, and the cost of each.
  • Work the quorum arithmetic on paper for N of three with W and R of two, and separate what R + W > N does guarantee, that any read set intersects any write set, from what it does not: on its own it is not linearizability, and a sloppy quorum that accepts writes on nodes outside the preference list breaks even the intersection.
  • Take two storage choices with different defaults, a single-leader relational store committing synchronously and a quorum-replicated store that converges eventually, and write the specific product behaviour that would be wrong under each, rather than a general statement about which is stronger.

Deliverable: A page separating what quorum overlap guarantees from what it does not, with one concrete product misbehaviour attached to each gap.

Practice prompt ↗Practice prompt ↗
04Failure is the design
  • For one write path, work through the case where the client times out after the server has already committed, then design the idempotency key: who generates it, how long it is retained, and what the duplicate request returns.
  • Express the retry policy as parameters rather than as a word: maximum attempts, base delay, backoff factor, jitter, and which error classes are retried at all. Then state why retrying a non-idempotent write without a key is a correctness bug and not merely waste.
  • Compute the fan-out effect on tail latency. If a request waits on ten backends and each independently exceeds its p99 one percent of the time, the chance at least one is slow is 1 - 0.99^10, about ten percent. Then write why independence is the optimistic assumption and what correlates them in practice.
  • Name the backpressure mechanism for one queue or one dependency in the design, a bounded queue with shedding or a concurrency limit, and write what the caller is told when it engages.

Deliverable: One write path with an idempotency design, a parameterised retry policy, and a written tail-latency calculation with its assumption named.

Practice prompt ↗Practice prompt ↗Worked solution ↗
05Scaling the hot path
  • Choose cache-aside or write-through for one read path and write the staleness window each produces, then name the invalidation event and what the system does when that event is lost.
  • Design against the stampede: either coalesce requests so only one recomputes a missing key, or refresh early with jittered expiry, and write why identical TTLs on keys populated in the same moment produce a synchronised expiry and a thundering herd.
  • Shard one table by a key you choose, then answer the two questions that break the choice: which queries now require a scatter-gather, and what happens to the distribution when one tenant is a hundred times larger than the median.
  • Write the cost of adding a node under plain modulo placement, where nearly every key moves, against consistent hashing, where roughly one key in n+1 moves, and state what virtual nodes are for.

Deliverable: A caching and sharding decision for one path, each with its failure mode and its rebalancing cost written beside it.

Practice prompt ↗Practice prompt ↗
06Keep the coding hand in, at the bar that applies to you
  • Solve one medium problem in thirty minutes, then spend twenty more making it production-shaped: named invariants, validation at the boundary, and errors that distinguish a caller mistake from an internal fault.
  • Write the tests you would require of a colleague's version of that function: one for empty input, one for the boundary, and one for the case the implementation is most likely to get wrong.
  • Read a piece of your own code from six months ago and write the change you would ask for, phrased as you would actually phrase it in review.

Deliverable: One problem hardened to review standard, with its test list and one written review comment.

Practice prompt ↗Practice prompt ↗
07Defend it while being interrupted
  • Run a forty-five-minute design mock with an interviewer briefed to change a requirement halfway, a tenfold traffic increase or a new strict consistency requirement, and to push on one number you estimated.
  • Rehearse the two sentences a senior loop is listening for: naming the tradeoff you are choosing against and why, and saying what you would measure to learn that the choice was wrong.
  • Prepare the design you regret: a real decision, the constraint that produced it, what it cost, and what you changed afterwards.

Deliverable: Mock notes recording how the design changed under the new requirement, plus a written account of one regretted decision.

Practice prompt ↗Worked solution ↗

Expand any day for tasks and deliverables. Your progress is saved on this device.

Nobody is scoring your stamina at three in the morning. What carries weight is which signal told you something was wrong, what you measured before touching anything, what you rolled back versus what you fixed forward, and why you picked one. 'We restarted it and it went away' is a story about not knowing.

How would you describe your communication style in a professional engi…

medium
behavioural and engineering judgement

How would you describe your communication style in a professional engineering environment?

Approach
  1. Name the disagreement and how you resolved it with evidence.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Close with what you would do differently, concretely.
Follow-up
  • How did you know your change caused the improvement?
  • What would you do differently if you ran that again?

Can you tell us about a time you worked in a team project?

medium
behavioural and engineering judgement

Can you tell us about a time you worked in a team project?

Approach
  1. Name the disagreement and how you resolved it with evidence.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Pick a story where you made the decision, not one where you watched it.
Follow-up
  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

How do you handle feedback or guidance from team leaders?

medium
behavioural and engineering judgement

How do you handle feedback or guidance from team leaders?

Approach
  1. Pick a story where you made the decision, not one where you watched it.
  2. State the situation in two sentences and spend the rest on the reasoning.
  3. Name the disagreement and how you resolved it with evidence.
Follow-up
  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

What is your experience with injection molding or structural analysis?

medium
behavioural and engineering judgement

What is your experience with injection molding or structural analysis?

Approach
  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Name the disagreement and how you resolved it with evidence.
Follow-up
  • What would you do differently if you ran that again?
  • What did you decide not to do, and why?
  • 01

    How would you describe your communication style in a professional engineering environment?

  • 02

    Can you tell us about a time you worked in a team project?

  • 03

    How do you handle feedback or guidance from team leaders?

  • 04

    What is your experience with injection molding or structural analysis?

PracHub interview preparation framework ↗
Is this an official ARRK Engineering interview guide?

No. It is PracHub's own research and practice material for the Software Engineer role at ARRK Engineering. Rounds and questions reflect what candidates have reported, not a process ARRK Engineering has published, and they change over time. Confirm the current format and scope with your recruiter.

PracHub interview research ↗
How difficult is the interview process?

Most candidates describe the process as manageable and fair. While some technical rounds can be challenging, the interviewers are typically supportive and focused on evaluating your actual experience rather than "gotcha" questions.

PracHub interview research ↗
How much time should I spend preparing?

Focus your preparation on reviewing your past projects and thesis. Being able to explain your past decisions clearly and confidently is more valuable than cramming for generic coding tests.

PracHub interview research ↗
What is the culture like at ARRK Engineering?

The culture is described as professional, respectful, and highly collaborative. You will find that team leaders are often interested in your potential to learn and your ability to work well within a group.

PracHub interview research ↗
How long does the process take?

The process can vary from a few weeks to a couple of months depending on the team and project. Stay proactive and maintain clear communication with your recruiters.

PracHub interview research ↗
Sources & methodology 3 sources ↗

No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.