Comaen. Find Your Spark. · Software Engineer
Updated · 2026-10-02

Comaen. Find Your Spark. Software Engineer
Interview Guide

THE 60-SECOND BRIEF

Comaen. Find Your Spark. is described by candidates as a company that delivers automation projects for industrial sectors such as offshore, food and water treatment, with recycling also named as a sector. The Software Engineer works through the life of a project: analysing what the client needs, turning that into functional and technical specifications, programming PLC and SCADA software, testing in-house, and then commissioning on site. Projects can be local in the Netherlands or involve international travel, and the role also produces the documentation that lets systems be audited and maintained after handover.

This guide is for candidates applying for the Software Engineer role in industrial automation. Reported requirements are an HBO degree in Electrical Engineering, Mechatronics or Technical Informatics, 0-5 years of experience with LAD, SCL and FBD, working proficiency on at least one of Siemens, Beckhoff, Allen-Bradley or Bachmann, professional Dutch and English, and willingness to travel. SCADA/HMI visualisation design, See Electrical or similar design software, and offshore or food-processing experience are reported as pluses. The guide covers the reported questions, a seven-day plan, behavioural stories and FAQs.

No sequence of rounds is reported for this company. Candidates describe a process of roughly two to four weeks from first screen to final offer, mixing technical discussion of PLC and SCADA work with behavioural conversation.

PLC (Programmable Logic Controllers)SCADA (Supervisory Control and Data Acquisition)Programmeren van PLC- en SCADA-software

31 min read

Browse Software Engineer questions

See the practice prompts

13Practice promptsAcross five skill areas

The five reported questions are about hands-on automation practice: moving from a client's functional specification to a PLC design, explaining a hard bug in a PLC or SCADA system, choosing between LAD, SCL and FBD for different tasks, keeping code maintainable and documented, and describing your experience with Siemens, Beckhoff or Allen-Bradley. None of them is an algorithm puzzle, so preparation means turning your own projects into clear, structured answers rather than drilling data-structure problems.

Candidates also report evaluation areas and example scenarios. The areas are logic implementation (how you structure code so it can be read and troubleshot), hardware interfacing (connecting PLC systems to HMI and SCADA software), and advanced topics such as safety-rated PLC programming and fieldbus communication protocols. The example scenarios are structuring a project for a new machine assembly and handling hardware-in-the-loop testing before going to a site. Have a worked answer for each: modules and function blocks, operating modes, I/O mapping, alarm handling, a simulated or bench test before site, and the fieldbus and safety work you have actually done.

The role mixes independent programming with collaboration: candidates describe working with senior engineers, project managers and onsite client teams, writing technical manuals and project plans, and acting as a main contact during commissioning. Professional Dutch and English are reported as a requirement, so be ready to explain a project clearly in both. Choose two or three projects from your own history and know each one well enough to cover the client requirement, your design, the bug that cost you the most time, what you documented and what happened on site.

01

Preparation focus

editorial

Candidates do not report a round-by-round sequence. They report a total span of about two to four weeks from the first screen to the final offer, with technical deep-dives and behavioural discussion, and a pace that varies by department and project urgency. Treat this as one preparation block. Build a project walkthrough you can deliver in either direction (requirements to commissioning, or a single bug back to its cause), prepare answers for the five reported questions, and have a worked answer for the two example scenarios: structuring a project for a new machine assembly and hardware-in-the-loop testing before site. Confirm the stage list with your recruiter before you start.

What to demonstrate

  • Knowledge of PLC and SCADA architectures and of the LAD, SCL and FBD languages on a platform you have used
  • A structured way of breaking down a problem: identify the issue, test hypotheses, implement a fix that holds up
  • Communication and ownership, which matter because the role involves clients, senior engineers and commissioning trips
  • Quality of documentation and maintainable logic, reported as part of the day-to-day work

How to prepare

  • Ask the recruiter how many stages there are, who you will speak to, and whether you will write code or answer verbally
  • Write a one-page walkthrough of 2-3 of your own projects covering platform, languages, fieldbus, HMI/SCADA link, your role and the outcome
  • Rehearse the five reported questions aloud, starting with the specification-to-design question and the bug story
  • Prepare answers to the two example scenarios: structuring a project for a new machine assembly and hardware-in-the-loop testing before site
PracHub preparation framework ↗

PracHub editorial advice for the preparation topics above.

01

Answering the specification-to-design question with 'I read the spec and write the code'

Walk through the sequence you actually use: read the functional specification, list the I/O, raise ambiguities with the client, define operating modes and interlocks, plan alarms and safety functions, split the program into modules, and write a test plan before programming. Tie each step to a project.

02

Telling the bug story as 'it was a timing issue and I fixed it'

Tell it in order: the symptom, how you reproduced it, what you checked first (online monitoring, forcing values, comms diagnostics, trace or logs), the hypotheses you ruled out, the root cause, the fix and the check that stops it returning. Choose a bug where the cause was not obvious.

03

Naming a single favourite language instead of matching language to task

Say why LAD suits discrete interlocks that electricians must read, why FBD suits continuous signal flows such as scaling and control loops, and why SCL suits calculations, loops, arrays and data handling. Mention who will maintain the code, not only what is quick to write.

04

Treating documentation and handover as an afterthought, or describing only solo work

State the concrete habits: naming conventions, commented blocks, version control, an I/O list, a functional description and a manual for the people who will maintain the system. Include one story where you worked with a senior engineer, project manager or client team.

05

Describing site commissioning as the first time the code runs

Explain how you test before travelling: simulated I/O or a bench rig, a PLC simulator or hardware-in-the-loop setup, scripted test cases and a checklist for site. Say what you would still expect to find on site and how you would communicate it to the client.

Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.

10 technical prompts0 include a worked solution

Track a rolling failure rate per destination for circuit decisions

easy
sliding windowring buffercircuit breaker

The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.

Approach
  1. Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
  2. Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
  3. State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
  4. Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
Follow-up
  • The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
  • A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?

Canonicalise a request body into a stable idempotency fingerprint

medium
parsingcanonicalisationhashing

idempotency_key.request_fingerprint is a SHA-256 over the method, path and canonicalised body, and a retry whose fingerprint differs must be rejected with 422 rather than served the stored response. Write the canonicaliser. Bodies are JSON up to 256 KB nested at most 32 levels; clients vary key order, whitespace and unicode escaping, and some send 64-bit ids as JSON numbers. Produce a deterministic byte string such that semantically identical bodies match and any semantic difference does not. State your complexity and name two normalisations you refuse to perform.

Approach
  1. Parse once into a tree, then re-serialise under fixed rules: object keys sorted, array order preserved, one escaping convention, no insignificant whitespace. Parsing is O(n) and sorting keys is O(k log k) per object, so O(n log n) overall with O(depth) stack, and the 32-level cap is enforced during parsing because hostile nesting is how a canonicaliser becomes a stack overflow.
  2. Sort keys by their UTF-8 bytes and say why the obvious implementation is wrong in some runtimes: a default string comparison that orders by UTF-16 code units places surrogate pairs, meaning code points from U+10000 up, below U+E000 to U+FFFF, which is not UTF-8 byte order, so two services written in different languages disagree on the same document.
  3. Do not re-encode numbers through a double. IEEE-754 binary64 represents integers exactly only up to 2^53, so normalising a 19-digit id through a float changes it, and 1 against 1.0 cannot be reconciled without deciding whether they are the same value. Preserve the literal token, and require ids as strings at the API boundary if you want them comparable.
  4. Reject duplicate keys rather than picking one. JSON permits them and parsers disagree, most keeping the last, so any choice you make ties the fingerprint to a parser detail that the code handling the request does not necessarily share.
Follow-up
  • A client sends the same logical request with an extra field your API ignores. Same key, different fingerprint, so you return 422. Is that the right answer?
  • Where does the fingerprint get computed relative to request decompression and the body-size limit?

Archive a resource graph without breaking live references or recursing

medium
graph traversaltopological ordertenant isolation

Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.

Approach
  1. Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
  2. Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
  3. Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
  4. Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.
Follow-up
  • The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
  • The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?

The plan follows the reported questions and evaluation areas: specification to design, debugging, language choice, maintainability, platform experience, and the project stories that tie them together. Each day ends with something written or recorded.

Small steps. Visible outcomes.0 / 7 completed
ONE WEEK · YOUR PACE

Prepare, practise & reflect

One practical outcome each day. Spend longer where you need it.

0 / 7 done
01Confirm the format and inventory your projects
  • Ask your recruiter for the stage list, who you will speak to and whether you will write code or answer verbally.
  • List 2-3 of your own projects with platform, languages used, fieldbus, HMI/SCADA link, safety work, your role and whether you commissioned on site.
  • Compare that list with the reported requirements (platform, LAD/SCL/FBD, Dutch and English, travel) and note any gap you need an answer for.

Deliverable: A recruiter reply with the format, a one-page project inventory, and a short list of gaps with an answer for each.

02From functional specification to PLC design
  • Take one past specification and write the path to design: I/O list, operating modes, interlocks, alarms, safety functions, module split, test plan.
  • Answer aloud the scenario of structuring a project for a new machine assembly, using that same path.
  • Note the two questions you would put to a client when a specification is ambiguous.

Deliverable: A one-page design walkthrough from one real specification, plus a recorded spoken answer to the machine-assembly scenario.

Practice prompt ↗
03Write the bug story
  • Write your hardest PLC or SCADA bug in order: symptom, reproduction, checks, hypotheses ruled out, root cause, fix, safeguard.
  • Prepare a second, shorter bug from the SCADA or comms side so you are not tied to one story.
  • Rehearse narrating a diagnosis sequence out loud with the software-side log-partition debugging exercise from PracHub's practice set, then retell your own bug in the same order.

Deliverable: Two written bug stories, each with a stated root cause and a safeguard, and one recording of the main story.

Practice prompt ↗Practice prompt ↗
04LAD, SCL and FBD by task
  • Build a table of automation tasks (motor start/stop with interlocks, analog scaling, sequence step control, array or recipe handling) against the language you would pick and the reason.
  • Write the same small function, such as a motor start/stop with an interlock, in LAD and in SCL on paper, and write an FBD layout for scaling an analog input.
  • Prepare one example where you changed language or restructured code to make it easier for a colleague to maintain.

Deliverable: The task-to-language table, the paper implementations in LAD, SCL and FBD, and one maintainability example.

Practice prompt ↗
05Maintainable, documented code and testing before site
  • Write your maintainability checklist: naming conventions, block structure, comments, version control, I/O list, functional description, operating manual.
  • Outline how you test before travelling: simulated I/O or a bench rig, scripted test cases, a site checklist.
  • Answer aloud how you keep code maintainable for future engineers, using a real handover as the example.

Deliverable: A maintainability checklist, a pre-site test outline, and a recorded spoken answer to the maintainability question.

Practice prompt ↗
06Platform depth, interfacing and collaboration
  • Write a comparison paragraph for the platform you use most: two real advantages, one limitation and how you handled it.
  • Prepare notes on one HMI/SCADA connection, one fieldbus you have used and any safety-rated programming you have done.
  • Practise the collaboration story with the unblock-an-engineer behavioural exercise from PracHub's practice set, then adapt it to a senior engineer or onsite client team.

Deliverable: The platform comparison paragraph, a half-page of interfacing, fieldbus and safety notes, and one collaboration story.

Practice prompt ↗Practice prompt ↗
07Full spoken dry run
  • Answer all five reported questions back to back, aloud and recorded, and cut anything you cannot support with a real project.
  • Give a two-minute summary of one project in both Dutch and English, since both are reported requirements.
  • Write the questions you want to ask about the team's current technical challenges and the mentoring available to newer engineers.

Deliverable: A recording of all five answers, a bilingual project summary, and a list of questions to ask.

Practice prompt ↗Practice prompt ↗Practice prompt ↗Practice prompt ↗Practice prompt ↗

Expand any day for tasks and deliverables. Your progress is saved on this device.

Candidates describe the role as a mix of independent programming and collaboration with senior engineers, project managers and onsite client teams, with documentation, commissioning duties and travel. Behavioural preparation therefore centres on stories that show ownership of your work, clear communication with clients and colleagues, and how you handled expectations when a project did not go to plan.

Describe your experience with specific platforms like Siemens, Beckhoff, or Allen-Bradley; what are the distin

medium
Technical Proficiency and Domain Knowled

Describe your experience with specific platforms like Siemens, Beckhoff, or Allen-Bradley; what are the distinct advantages of the one you use most?

Approach
  1. Pick the platform you have delivered the most on and open with one concrete project: the machine or process, the controller family, the engineering software, the languages you used, the fieldbus, how it connected to HMI or SCADA, and which part you owned. Two sentences of context, then spend your time on your own decisions.
  2. Make the advantages specific and drawn from your own work, not brand slogans. Examples, to use only if they match your experience: Siemens TIA Portal keeps PLC, HMI and PROFINET configuration in one project; Beckhoff TwinCAT runs the PLC on an industrial PC and pairs naturally with EtherCAT; Allen-Bradley Studio 5000 uses tag-based addressing with user-defined types and add-on instructions. Say what that meant on a real job.
  3. Give a balanced view: name one thing the platform makes harder (licensing or hardware cost, library reuse, tooling, diagnostics) and how you handled it. Describing a weakness in the platform you use most shows that your experience is real, and you should never run down the others.
  4. Be exact about depth. Separate the platform you know well from ones you have only touched, and state your years honestly; the reported requirement is proficiency on at least one of Siemens, Beckhoff, Allen-Bradley or Bachmann, not all of them.
  5. Close with transferability: how you would get productive on another platform on that list, by mapping concepts you already know (tasks and organisation blocks, data blocks versus tags, I/O addressing, fieldbus configuration, online diagnostics).
Follow-up
  • If you had to port that project to another platform, what would you move first and what would you have to redesign?
  • Which feature of that platform has caused you the most trouble during a commissioning, and how did you work around it?
  • How would you become productive on a platform from the list that you have not used before?

Unblock an engineer without taking the keyboard

easy
mentoringleasesat-least-once

A teammate has spent two days on a job handler that occasionally writes duplicate rows. They are certain the queue is delivering twice by mistake. You suspect a lease expiring under a slow handler, so the job is running concurrently with itself. Describe how you have unblocked someone in this position: what you asked before offering a hypothesis, what you showed them rather than told them, and what you left them owning. Then say what you would do if their theory turned out to be the right one.

Approach
  1. Ask before diagnosing, and ask for things answerable from data they already have: the attempt count on the job rows that produced duplicates, the handler's observed duration against its lease expiry, and whether the duplicate rows share a natural key that a unique constraint could have caught.
  2. Teach the shape rather than the answer. A lease cannot distinguish a dead worker from a slow one, so a handler that outruns its lease is running twice by design, and deploys deliver the other half by killing handlers mid-run on every rollout. Both of their candidate theories produce identical duplicate rows, which is why the evidence has to come from timings rather than from argument.
  3. Hand over a checklist they execute: a natural key on every write the handler performs so the second copy collides rather than appends, the record of intent written before any external effect, a lease heartbeat while running, and the metric that shows it working.
  4. Keep ownership with them deliberately. Pair on the first write, then step back; if you finish it yourself you have closed one ticket and left the same person stuck on the next redelivery.
Follow-up
  • How would you distinguish a genuine double-delivery from a lease expiry using only the data already stored?
  • Their handler calls an external endpoint before recording that it did. What do you tell them to change first?

Tell callers you do not own that their integration breaks

medium
deprecationcompatibilitystakeholders

A field in a write endpoint's response must change shape. You own the endpoint; you do not own the four internal callers or the outbound webhook consumers who read it. Describe a deprecation you were responsible for: what you shipped first, how you established who was actually reading the field, the window you gave and what set its length, what you did about the consumer who never moved, and how you decided removal was safe. Name the signal you used, not the announcement you sent.

Approach
  1. Establish the reader set empirically rather than from a wiki of owners: per-field usage counters keyed by principal, or access logs attributed to a consumer. State the blind spot of whichever you pick, since a consumer that reads the field only on a monthly job will not appear in a week of logs.
  2. Ship additive first. Populate the new field alongside the old one so no reader is forced to move, which is also what keeps a rolling deploy safe, because old and new instances answer the same requests at the same time and a rollback must still find the old shape present.
  3. Set the window from the slowest legitimate consumer's release cadence, not from your calendar, and decide separately what to do for a consumer with no release process at all, such as an external webhook endpoint you can only email.
  4. Convert silence into evidence before you rely on it: a short, low-traffic removal window that makes a still-dependent consumer fail visibly and loudly while you are watching, rather than at three in the morning after you have moved on.
Follow-up
  • How would you detect a consumer that reads the field only during a monthly export?
  • One caller refuses to move and has a commercial relationship behind it. What changes in your plan and what does not?
  • 01

    Describe your experience with specific platforms like Siemens, Beckhoff, or Allen-Bradley; what are the distinct advantages of the one you use most?

  • 02

    Tell me about a project you owned from requirements through to handover, including the documentation you left for the next engineer.

  • 03

    Describe a problem you met during commissioning on site and how you kept the client informed while you fixed it.

  • 04

    Tell me about a time you worked with a senior engineer or project manager to resolve a technical disagreement.

  • 05

    Give an example of managing a client's expectations when a requirement changed late in a project.

PracHub preparation framework ↗
How long does the hiring process typically take?

Candidates report a span of roughly two to four weeks from the first screen to the final offer, depending on scheduling and on the department. No count or order of rounds is reported, so ask your recruiter for the stages and who you will meet.

Comaen. Find Your Spark. Software Engineer candidate reports ↗
Is there room to grow after joining?

Candidates mention Senior Engineer and Lead Engineer as the roles an engineer can move towards with experience. Ask in your interviews how that progression works for a Software Engineer on automation projects.

Comaen. Find Your Spark. Software Engineer candidate reports ↗
How much travel is involved?

Candidates report that travel depends on the project and that both domestic and international commissioning are part of the role, and flexibility to travel is listed as a requirement. Ask how commissioning trips are staffed and how long you would typically be away.

Comaen. Find Your Spark. Software Engineer candidate reports ↗
What technical topics and scenarios should I prepare?

Reported evaluation areas are logic implementation, connecting PLC systems to HMI and SCADA software, safety-rated PLC programming and fieldbus protocols. Reported example scenarios are structuring a project for a new machine assembly and handling hardware-in-the-loop testing before going to a site. Prepare a worked answer for each, based on a project you have delivered.

Comaen. Find Your Spark. Software Engineer candidate reports ↗
Which platforms and languages do I need?

The reported requirement is proficiency with at least one of Siemens, Beckhoff, Allen-Bradley or Bachmann, plus experience with LAD, SCL and FBD, with 0-5 years listed. Prepare the platform you know best in depth, and be honest about which others you have only used briefly. SCADA/HMI visualisation design, See Electrical or similar software, and offshore or food-processing experience are reported as advantages.

Comaen. Find Your Spark. Software Engineer candidate reports ↗
Do I need to speak Dutch?

Professional fluency in Dutch and English is a reported requirement, and some reported topic names appear in Dutch as well as English. Prepare to describe your projects clearly in both languages.

PracHub Software Engineer practice ↗
Should I expect a coding test?

No coding test or take-home is reported. The five reported questions are conversations about PLC and SCADA practice, so prepare to explain and sketch your reasoning. Ask your recruiter whether any stage involves writing a program or reading a design.

PracHub Software Engineer practice ↗
Sources & methodology 3 sources ↗

No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.