Engie Impact · Data Scientist
Updated · 2026-09-24

Engie Impact Data Scientist
Interview Questions & Guide 2026

THE 60-SECOND BRIEF

As a Data Scientist at Engie Impact, you play a pivotal role in harnessing data to create actionable insights that drive sustainability and efficiency in energy solutions. Your work contributes significantly to the organization’s mission of delivering innovative strategies for businesses to transition toward a low-carbon economy. By leveraging data analytics, machine learning, and statistical modeling, you will help shape products and services that not only meet client needs but also promote environmentally sustainable practices.

Ask early whether the loop includes an asynchronous take-home or a timed live case, because the two are graded on different things. A take-home is read as an artifact: the question you decided to answer, what you did about missing or malformed records, and a conclusion stated plainly enough for someone to act on. A reviewer who cannot rerun your notebook discounts the result whatever score is printed in it. Hold to the stated time box and write down what you would have done with more of it, since the follow-up round is usually a live defence of the same work.

Engie Impact candidates report 4 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.

Pick a randomisation unit that respects interferenceTurn a vague request into a measurable questionDecompose a metric move by segment and mix

33 min read

Browse Data Scientist questions

See the practice prompts

16Practice promptsAcross five skill areas
3With worked solutionsIncluded in the practice prompts

As a Data Scientist at Engie Impact, you play a pivotal role in harnessing data to create actionable insights that drive sustainability and efficiency in energy solutions. Your work contributes significantly to the organization’s mission of delivering innovative strategies for businesses to transition toward a low-carbon economy. By leveraging data analytics, machine learning, and statistical modeling, you will help shape products and services that not only meet client needs but also promote environmentally sustainable practices.

This role is critical within the broader context of Engie Impact's operations, as it directly impacts decision-making processes and strategic directions. You will collaborate with cross-functional teams, including engineers, product managers, and business leaders, to tackle complex challenges related to energy consumption, emissions reduction, and resource optimization. The scale and complexity of the problems you will address require not only technical expertise but also a strategic mindset and an ability to communicate insights effectively to diverse audiences.

Expect to engage in projects that involve analyzing data from various sources, building predictive models, and generating reports that influence strategic initiatives. As you immerse yourself in this role, you'll find that the dynamic nature of the energy sector offers an exciting landscape for innovation and growth.

01

Initial Screening

reported

Whoever runs this call is usually not a practitioner. They take notes, and a hiring manager skims those notes later, so the real question is whether your work survives being written down by someone outside the field. Test every project sentence against that: could a non-specialist repeat it correctly without knowing what a propensity score is? Carry a plain-language version of each project and one reason you want this particular role that you could not copy onto another application. Vagueness at this stage reads as inexperience, even when the underlying work was genuinely deep.

What to demonstrate

  • Whether a non-specialist can restate your projects accurately, since their paraphrase is what reaches the hiring manager
  • Whether your reason for wanting the role points at the work itself rather than the company's reputation
  • Whether your language signals the level being screened for: what you decided yourself versus what you were handed

How to prepare

  • Write a two-sentence, jargon-free version of each major project: the question nobody could answer, and the decision your work changed. Read it to someone outside data and have them repeat it back
  • Point your 'why this role' answer at something concrete in the job description or the product surface you would be working on, and keep it to two sentences
  • Have two questions ready about measurement: which metric the team is held to, and who acts on an analysis once it lands
PracHub interview research ↗
02

Technical Interviews

reported

Much of what gets scored here happens out loud while you type. Nobody can see your reasoning inside a half-written query, so five silent minutes read as being stuck even when they are not. State the plan in plain language first: which tables, what grain you are aggregating to, and the one filter that defines the population. Then write it. The narration doubles as insurance, because a wrong plan gets caught early and cheaply while a wrong query gets caught at the end with no time left to redo it. A timed statistics section, where one exists, is a separate test with its own clock.

What to demonstrate

  • Whether the query you write matches the plan you just described
  • What you do with a hint, meaning whether the correction gets absorbed or the first approach gets defended
  • Whether you can debug your own wrong output by reading the result set and naming which part of the query produced the anomaly

How to prepare

  • Solve three problems while screen-sharing into a recording, then watch it back and mark every stretch longer than thirty seconds where you said nothing
  • Practise compressing the plan into one sentence before typing, then check afterwards whether the finished query actually matched it
  • Time yourself on statistics questions that carry a business reading, such as what a confidence interval does and does not claim, rather than re-reading notes without a clock
PracHub interview research ↗
03

Leadership Interviews

reported

An added round often puts you in front of someone outside the core hiring team: a partner engineer, a product owner, a domain expert, sometimes a more senior manager. The question they are really asking is not whether you can do the work but whether they would trust a number that came from you. That changes what a good answer looks like. Lead with what the decision cost and what it changed, keep the method available but not central, and be plain about the limits of your evidence. Overstating a result is the fastest way to lose this round.

What to demonstrate

  • Whether you can explain a technical choice to someone who will never read your code, without either flattening it into nothing or hiding inside jargon
  • Honesty about evidence strength: what the analysis establishes, what it only suggests, and what it cannot say at all
  • How you take disagreement, specifically whether you update on a good objection, hold your position with reasons, or fold on contact

How to prepare

  • Write the two-sentence version of your most technical project for a non-specialist, then check that neither sentence needs a method name to make sense.
  • For one result you are proud of, write the strongest objection someone could raise and a response that concedes the part of it that is correct.
  • Prepare one decision that turned out to be wrong: how you found out, what it cost, and what you changed afterwards. A senior cross-functional interviewer asks for this more often than a technical one does.
PracHub interview research ↗
04

Technical Assessments

reported

A handful of shapes account for most of what gets asked in this format: a ranking or deduplication inside groups, a running or rolling total, a period-over-period comparison, and a cohort tracked forward over time. Recognising the shape quickly is most of the speed here; deriving it from scratch while a clock runs is where the time goes. Know that a window function keeps every row while a GROUP BY collapses them, and know which one the question needs. If the exercise is in Python instead of SQL, the same shapes arrive as groupby with transform, shift and merge, and the same grain mistakes are available.

What to demonstrate

  • Whether you reach the right construct without a detour, such as ROW_NUMBER over a partition to deduplicate instead of a self-join against a MAX subquery
  • Whether you know what your window frame actually is, since adding ORDER BY inside OVER changes the default frame and silently changes a running total
  • Whether the thing runs. A near-miss that throws an error scores below a plainer query that returns the right rows.

How to prepare

  • Write each of the four shapes once from memory against a small schema and keep the working version somewhere you will reread it: dedupe with ROW_NUMBER, a running total, a month-over-month change with LAG, and a retention table
  • Compute one running total twice on data with tied timestamps, once on the default frame and once with ROWS BETWEEN UNBOUNDED PRECEDING AND CURRENT ROW, and look at where the two disagree
  • If Python is on the table, rebuild the dedupe and the running total with groupby and cumsum, then assert the two implementations return identical rows
PracHub interview research ↗

PracHub editorial advice for the preparation topics above.

01

Watching an experiment daily and stopping when it crosses significance

A fixed-sample test controls type I error at one pre-declared look. Checking repeatedly and stopping at the first p < 0.05 inflates the false positive rate to roughly 0.15 to 0.20 for ten looks, and it rises further with more frequent checks, because the p-value takes a random walk that will eventually dip below the threshold under the null. The usual defences are a fixed horizon declared before launch, group-sequential boundaries such as O'Brien-Fleming that spend alpha across a planned number of looks, or always-valid confidence sequences that are correct under continuous monitoring. Compounding it, the effect size reported conditional on having crossed the threshold is biased away from zero, and the bias is larger the lower the power was, so an underpowered test that 'won' typically overstates the lift it found.

02

Reading a pooled rate that moved because the mix moved, not because any behaviour changed

A pooled conversion rate is a weighted average, and a shift in the weights can move it in the opposite direction to every one of its parts. A paid campaign that brings low-converting traffic drops overall signup conversion even if desktop, mobile web and app conversion each rose that week, which is Simpson's paradox and it is the single most common cause of an inexplicable dashboard move. The discipline is to decompose before explaining: recompute the rate holding last period's segment weights fixed, and compare that counterfactual to the actual, so the mix effect and the rate effect are separated numerically rather than argued about. Segment on the dimensions that actually reweight, which in this domain are almost always device_type, referrer_channel, country and new versus returning.

03

Stopping an experiment the moment it crosses significance

Fix the sample size or duration before launch, or use a method built for continuous monitoring such as a sequential test, always-valid confidence intervals, or group-sequential boundaries. Repeatedly checking a fixed-horizon p-value against 0.05 pushes the real false-positive rate well above 5 percent.

04

Over-explaining the method and under-explaining the implication

Lead with the answer and what you would do about it, then give the approach when asked. Roughly one sentence of method per three of implication is the right ratio for a stakeholder-facing answer; the interviewer already knows what a regression is.

Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.

13 technical prompts3 include a worked solution

Can you describe a project where you used machine learning algorithms?…

medium
machine learning and modelling

Can you describe a project where you used machine learning algorithms? What was your approach and the outcome?

Approach
  1. Check what information would not exist at prediction time, and exclude it.
  2. Pick an evaluation metric that matches the cost of each error type, not a default.
  3. Frame the prediction: the label, the moment of prediction, and the action it triggers.
Follow-up
  • What would you monitor after launch to know the model is still valid?
  • Where could label leakage enter this setup?

If you were tasked with improving a predictive model, what steps would…

medium
machine learning and modelling

If you were tasked with improving a predictive model, what steps would you take?

Approach
  1. Say how the offline result would be validated online before it is trusted.
  2. Pick an evaluation metric that matches the cost of each error type, not a default.
  3. Check what information would not exist at prediction time, and exclude it.
Follow-up
  • What would you monitor after launch to know the model is still valid?
  • How would you choose the decision threshold, and who owns that choice?

Simulate the false positive cost of repeated peeking

mediumWorked solution
simulationpeekingtype i error

Quantify the cost of peeking. Simulate a two-arm experiment with no true effect: each arm accumulates Bernoulli conversions at a base rate of 0.10 up to 40,000 units per arm. Run a two-sided two-proportion z-test at alpha 0.05 at ten equally spaced interim points, and record whether the test ever crossed. Report the false positive rate over at least 10,000 replications, alongside the rate for a single look at the final sample only. Use a fixed seed and report a Monte Carlo standard error on both figures.

Approach
  1. Generate each replication as two cumulative sums of Bernoulli draws, then read the interim points off the cumulative arrays. Regenerating data at each look would make the looks independent, which destroys exactly the dependence the exercise is about: later looks share data with earlier ones.
  2. Use the pooled-variance two-proportion z: p_pool = (x1+x2)/(n1+n2), z = (p1-p2) / sqrt(p_pool*(1-p_pool)*(1/n1 + 1/n2)), reject when |z| > 1.96. State that the normal approximation is fine here because the smallest look has roughly 400 expected conversions per arm.
  3. Vectorise across replications rather than looping: draw a (reps, n) array of uniforms, threshold at 0.10, cumsum along axis 1 and slice the ten look indices. A per-replication loop at 10,000 by 40,000 is unnecessarily slow.
  4. Record the any-cross indicator per replication, take the mean, and compute the Monte Carlo standard error as sqrt(p*(1-p)/reps) so the reported figure comes with its own precision.
  5. Report the single-look rate in the same run as a control. If it does not land near 0.05, the bug is in the test statistic and not in the peeking argument.
Worked solution 30 min
  1. rng = np.random.default_rng(seed); for memory, batch the replications in chunks and accumulate the any-cross count across chunks.
  2. Per chunk: draw (chunk, 40000) uniforms per arm, x = (u < 0.10).cumsum(axis=1), slice columns at indices 3999, 7999, ..., 39999.
  3. Compute the ten z statistics vectorised over the chunk, take crossed = (np.abs(z) > 1.96).any(axis=1).
  4. Aggregate: peek_rate = total_crossed / reps; single_rate = mean of |z_final| > 1.96; mc_se = sqrt(p*(1-p)/reps) for each.
EXPECTED RESULTThe single-look rate lands at 0.05 within about 0.005 at 10,000 replications. The ten-look rate lands near 0.19, which with 10,000 replications has a Monte Carlo standard error of about 0.004, so anything in roughly 0.18 to 0.20 is consistent and anything near 0.40 indicates independent redraws.
Follow-up
  • Re-run with 40 looks instead of 10. Why does the curve flatten rather than continue rising linearly?
  • Among the replications that crossed, what is the mean observed lift, and why is it not zero?
  • What does an O'Brien-Fleming boundary or an always-valid confidence sequence change about this simulation, and what does each cost in power?

For someone who can already write the query and train the model but stalls when asked what to measure or whether a change is worth making. Metric definition and case structure come first; the technical work is kept as maintenance rather than the centre of the week.

Small steps. Visible outcomes.0 / 7 completed
ONE WEEK · YOUR PACE

Prepare, practise & reflect

One practical outcome each day. Spend longer where you need it.

0 / 7 done
01Metric anatomy
  • For three products you use daily, write one primary metric, two input metrics that plausibly move it, and one guardrail that would catch a cheap way of moving the primary at the cost of the product.
  • For one of them, specify the metric precisely enough that two analysts would return the same number: numerator, denominator, unit of observation, time window, and how returning and deleted accounts are treated.
  • Pick a ratio metric and write what happens to it when the denominator shrinks for reasons unrelated to the numerator, with a concrete example of that happening.

Deliverable: A one-page metric tree for one product, with the primary metric written as an unambiguous spec.

Practice prompt ↗Practice prompt ↗Practice prompt ↗Worked solution ↗
02Diagnosing a drop without guessing
  • Take the prompt "weekly active users fell 8 percent week over week" and write the segmentation plan before proposing any cause: platform, region, tenure cohort, acquisition channel, and whether the movement sits in the numerator or in a changed denominator.
  • List the instrumentation failures that manufacture fake drops (a client release that stopped firing an event, a bot filter change, a shifted date boundary or timezone) and write the query that rules out each one.
  • Rehearse stating the boring explanations first, seasonality and day-of-week composition, before reaching for a product cause.

Deliverable: A drop-diagnosis checklist short enough to recite from memory in under a minute.

Practice prompt ↗Practice prompt ↗Practice prompt ↗
03Should we build it
  • Take a feature idea and write it as a bet: what you believe is true, what would have to be true for it to pay off, the metric that would confirm it, and the effect size that would justify the engineering cost.
  • Size the opportunity top-down and bottom-up, then reconcile the two numbers in writing instead of quoting whichever is friendlier.
  • Write the counter-metric that would make you kill the feature even if it wins on the primary metric.

Deliverable: A one-page product memo ending in a decision rather than a list of considerations.

Practice prompt ↗Practice prompt ↗
04The places aggregate numbers lie
  • Construct a Simpson's paradox numerically: two segments where the treatment wins within each segment yet loses overall, and identify the shift in segment weights that causes it.
  • Take a heavy right-tailed quantity such as revenue per user and write why the mean is the wrong summary, which percentile you would report instead, and what a moving mean with a stable median tells you.
  • Write your definition of a session for the product from day one, then name two real behaviours it misclassifies.

Deliverable: One page holding a worked Simpson's paradox table and a session definition with its two known failure cases.

Practice prompt ↗Practice prompt ↗Worked solution ↗
05Technical maintenance, aimed at metrics
  • Solve four timed SQL prompts that all end in a ratio metric, so the question of grain stays live in every answer.
  • Compute a 95 percent confidence interval for a proportion on a small sample, and state why the normal approximation is unreliable when either np or n(1 minus p) falls below roughly 10, along with which interval you would use instead.
  • Take one metric from your day-one tree, write the query that computes it correctly, then write the query that computes it wrong in the most plausible way and explain how you would notice.

Deliverable: Four solved prompts plus a matched correct and plausible-wrong query for one metric.

Practice prompt ↗Practice prompt ↗
06Turning engineering work into data science stories
  • Write three project stories as situation, decision, trade-off, outcome, each carrying one number and one thing you got wrong.
  • For the story you will lead with, prepare an answer to "what would you do differently" that names a decision you made, not a constraint you were handed.
  • Practise the sentence that reframes a systems project as a question project: the question the work answered, ahead of the pipeline it shipped.

Deliverable: Three written stories with the lead story delivered aloud and timed under four minutes.

Practice prompt ↗Practice prompt ↗
07Mock case and gap list
  • Run a 40-minute mock case with someone playing a product manager who pushes back on your metric choice, and record it.
  • Listen back and mark every moment you proposed a solution before the success metric existed.
  • Rewrite those moments as the question you should have asked, and rehearse the first 90 seconds of the case until scoping comes before solving.

Deliverable: A recorded case plus a rewritten opening 90 seconds.

Practice prompt ↗Practice prompt ↗Worked solution ↗

Expand any day for tasks and deliverables. Your progress is saved on this device.

Have two ready. In one, the data was on your side and you had to move someone who outranked you. In the other, the pushback was correct and you changed position. The second is the harder story and it lands better, because it shows you separate being right from being attached to an answer. Name the person's actual objection.

How do you handle feedback and criticism of your work?

medium
behavioural and stakeholder questions

How do you handle feedback and criticism of your work?

Approach
  1. Name the disagreement or constraint, and how you resolved it with evidence.
  2. Close with what you would do differently, concretely.
  3. State the situation in two sentences and spend the rest on your reasoning.
Follow-up
  • What would you do differently if you ran that project again?
  • How did you know the outcome was caused by your change?

Turn an ambiguous onboarding question into a measurable metric

easy
scopingmetric definitionstakeholder

Two days before a planning review, a director asks whether onboarding is working. You have dim_user (account_created_at_utc, signup_surface, is_internal), fct_event (is_core_action, flow_id, flow_instance_id, event_name, occurred_at_utc, received_at_utc) and fct_session. No further meeting with the director is possible before you start work. Deliver three clarifying questions you would send in writing, the metric you will compute in the meantime with its numerator, denominator, window and exclusions, and one sentence naming the question you are deliberately not answering.

Approach
  1. Recognise what is being probed: whether you convert a goal into a computable predicate without stalling for requirements or guessing in silence. Listing clarifying questions is the generic answer; shipping a defensible default alongside them is the strong one, because the review is in two days and it will happen with or without you.
  2. Infer the decision behind the request. A question about whether onboarding works, arriving before a planning cycle, usually means whether to staff it next quarter. That points at a rate with visible headroom over several cohorts, not at a descriptive dashboard.
  3. Write the three questions so that each one changes the SQL. Which population, all signups or only self-serve from dim_user.signup_surface. What counts as working, reaching a core action or completing the onboarding flow_id. Against what bar, last quarter's cohorts or a stated target.
  4. Propose the default explicitly: seven-day activation on weekly signup cohorts. Numerator, users with is_core_action = TRUE events on at least two distinct UTC dates inside [account_created_at_utc, account_created_at_utc + 7 days). Denominator, the signup cohort with is_internal = FALSE. Publish with an eight-day lag, and state that the two-distinct-days threshold is a frozen choice rather than a discovery.
  5. Name the exclusion in the same breath as the number. The series shows whether users activate; it does not establish that onboarding caused the level, which needs a staged rollout or an experiment.
Follow-up
  • The director replies that they meant the onboarding flow specifically, not activation. What changes in the query and in the caveats?
  • Your cohort metric needs an eight-day lag and the review is in two days. What do you present, and how do you label it?
  • Two of your three questions come back unanswered. Which one do you refuse to proceed without?

Handle a request for numbers supporting a decision already made

hard
integrityframingstakeholder

A senior leader has already decided to sunset a plan tier and asks you for the analysis showing it is the right call. Accounts on that tier carry 6% of MRR at constant FX and have the highest licensed-seat utilisation in the book. The leader's support matters to your next review cycle, and the decision is being presented in four days. Deliver what you produce, what you decline to produce, and the exact sentence you will say in the meeting where the number appears on a slide.

Approach
  1. Recognise what is being probed: whether you can find the legitimate request inside an illegitimate framing instead of either complying or refusing on principle. The generic answer promises to push back; the strong one produces something genuinely useful and states its limits in the room, without ambushing anybody.
  2. Separate the decision from the justification. Sunsetting the tier may be correct for reasons the data does not hold, such as support cost, roadmap surface area or sales motion. What you decline is a one-sided document. What you produce is the case read both ways, which also happens to be more useful to the leader.
  3. Build the symmetric analysis: MRR at risk at constant FX, the share of affected accounts with a plausible migration path given seats_licensed and billing_term, the recovery rate assumed for that migration and where it came from, and the downside case in which high-utilisation accounts treat the sunset as a reason to re-evaluate the vendor entirely.
  4. Surface the inconvenient fact privately and early. The highest seat utilisation in the book is a retention signal, and the leader should hold it before the room does, so they can incorporate it rather than be caught by it.
  5. Agree the meeting sentence in advance with the leader, so that nobody is surprised. Something to the effect that the tier is 6% of MRR and its accounts are the most heavily used in the book, and that the case for sunsetting rests on cost and focus rather than on revenue. That is true, it supports the decision on its real grounds, and it stops the deck claiming the numbers endorse it.
  6. Decide your own line before you need it: what you will not put your name to, and that the route if asked anyway is your own manager rather than a confrontation in the meeting.
Follow-up
  • The deck circulates with your analysis included and the downside case removed. What do you do, and by when?
  • What changes if the honest analysis says the sunset is clearly the wrong call?
  • How do you write the same memo when the leader is your skip-level and the meeting is tomorrow?
  • 01

    How do you handle feedback and criticism of your work?

  • 02

    Two days before a planning review, a director asks whether onboarding is working. You have dim_user (account_created_at_utc, signup_surface, is_internal), fct_event (is_core_action, flow_id, flow_instance_id, event_name, occurred_at_utc, received_at_utc) and fct_session. No further meeting with the director is possible before you start work. Deliver three clarifying questions you would send in writing, the metric you will compute in the meantime with its numerator, denominator, window and exclusions, and one sentence naming the question you are deliberately not answering.

  • 03

    A senior leader has already decided to sunset a plan tier and asks you for the analysis showing it is the right call. Accounts on that tier carry 6% of MRR at constant FX and have the highest licensed-seat utilisation in the book. The leader's support matters to your next review cycle, and the decision is being presented in four days. Deliver what you produce, what you decline to produce, and the exact sentence you will say in the meeting where the number appears on a slide.

PracHub interview preparation framework ↗
Is this an official Engie Impact interview guide?

No. It is PracHub's own research and practice material for the Data Scientist role at Engie Impact. Rounds and questions reflect what candidates have reported, not a process Engie Impact has published, and they change over time. Confirm the current format and scope with your recruiter.

PracHub interview research ↗
How difficult is the interview process?

The interview process is designed to assess both technical and interpersonal skills, and candidates often describe it as rigorous but fair. Expect a mix of technical questions, problem-solving scenarios, and behavioral interviews.

PracHub interview research ↗
What differentiates successful candidates?

Successful candidates demonstrate a strong technical foundation, effective communication skills, and a clear alignment with Engie Impact’s mission. They also show a proactive approach to problem-solving and collaboration.

PracHub interview research ↗
What is the company culture like at Engie Impact?

Engie Impact fosters a collaborative and innovative environment that values sustainability and continuous improvement. Employees are encouraged to contribute ideas and work together to achieve shared goals.

PracHub interview research ↗
What is the typical timeline from the initial interview to an offer?

The timeline can vary, but candidates generally complete the interview process within 4-6 weeks. Be prepared for multiple stages, including technical assessments and behavioral interviews.

PracHub interview research ↗
Sources & methodology 3 sources ↗

No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.