As a Software Engineer at Great River Energy, your role is pivotal in shaping the technology landscape that supports the organization’s mission to provide reliable energy solutions. This position is not just about writing code; it involves designing and developing software systems that optimize energy distribution, enhance operational efficiency, and support innovative projects that impact both the company and its customers. You will work on projects that have a substantial impact on energy management, renewable energy integration, and customer engagement, making your contributions crucial for the success of the organization. In this role, you will collaborate with cross-functional teams, including product managers, data analysts, and operations staff, to develop software solutions that address complex challenges in the energy sector. The work is dynamic, requiring you to adapt to evolving technologies and industry standards. The complexity of the systems you will help build is both a challenge and an opportunity to innovate, directly impacting the efficiency of energy delivery and customer satisfaction. Expect to be at the forefront of exciting projects, leveraging modern software development practices and technologies to drive energy solutions that contribute to a sustainable future.
Phone Screen
reportedPreliminary phone screen conducted by an HR representative.
What to demonstrate
- Preliminary phone screen conducted by an HR representative
- Depth in Behavioral Interviewing (STAR method)
How to prepare
- Be able to walk your CV end to end in two minutes, and say why this company specifically.
- Have your salary expectations, notice period and location constraints ready, and ask for the rest of the loop in writing.
In-Person Interview
reportedMeet with the hiring manager and possibly other team members for a structured interview.
What to demonstrate
- Meet with the hiring manager and possibly other team members for a structured interview
- Depth in Behavioral Interviewing (STAR method)
How to prepare
- Answer aloud and timed: Describe a significant technical challenge you faced and how you overcame it.
- Answer aloud and timed: How do you ensure code quality and maintainability in your projects?
PracHub editorial advice for the preparation topics above.
Know Your Projects
Be prepared to discuss your previous projects in detail. This backs up your technical skills with real-world examples.
Practice the STAR Method
Use the STAR method to structure your responses to behavioral questions, ensuring clarity and impact.
Be Curious
Show genuine interest in Great River Energy by asking insightful questions about the team and projects during your interview.
Align with Company Values
Familiarize yourself with Great River Energy’s core values and think of ways you can exemplify them in your responses.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Track a rolling failure rate per destination for circuit decisions
The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.
Approach
- Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
- Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
- State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
- Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
Follow-up
- The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
- A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
Archive a resource graph without breaking live references or recursing
Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.
Approach
- Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
- Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
- Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
- Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.
Follow-up
- The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
- The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?
Collapse a redelivered event batch into per-aggregate high-water marks
You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.
Approach
- One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
- Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
- Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
- If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
Follow-up
- The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
- How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
Find version gaps and relay lag with window functions
outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.
Approach
- Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
- Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
- Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
- Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.
Follow-up
- Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
- Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?
Keep soft-deleted accounts from blocking re-registration
app_user holds user_id, tenant_id, email CITEXT, password_hash (NULL for SSO principals), email_verified_at, auth_version, status ('invited','active','suspended','deactivated'), created_at, updated_at, deleted_at. Two live accounts for one address inside a tenant must be impossible, but an address freed by a soft delete must be reusable, and the same tenant may delete and re-register it repeatedly. Write the uniqueness DDL for PostgreSQL 16, then the equivalent for MySQL 8 where partial indexes do not exist, and say what each permits once three deleted rows already hold that address.
Approach
- Start from what is actually unique: not (tenant_id, email), but (tenant_id, email) among live rows. PostgreSQL says that directly — CREATE UNIQUE INDEX app_user_live_email ON app_user (tenant_id, email) WHERE deleted_at IS NULL. A full constraint over the same two columns burns the address permanently the first time someone deletes an account.
- Keep case-insensitivity in the type or the index, never in the application: CITEXT as given, or UNIQUE (tenant_id, lower(email)) as an expression index where the extension is unavailable. A case-sensitive unique column is exactly how two accounts for one human appear.
- For MySQL 8 the predicate has to move inside the key: add a discriminator column that is a constant 0 while the row is live and is set to user_id on delete, with UNIQUE (tenant_id, email, deleted_marker). Live rows share the constant and still collide; deleted rows differ from each other and stop colliding.
- State the NULL variant and its dependency: leaving the marker NULL for deleted rows also works, because a unique index treats NULLs as distinct — true in MySQL, and true in PostgreSQL only under the default NULLS DISTINCT, which PostgreSQL 15 lets you reverse. Check the polarity against the three existing deleted rows: constant-on-live is what preserves the collision you want, and reversing it silently admits duplicate live accounts.
Follow-up
- A deleted account re-registers with the same address the next day. Do the old resource rows follow the new user_id, and how does the API keep the two principals apart?
- How do you honour an erasure request while resource_revision.actor_user_id still references this table?
What programming languages are you most proficient in, and how have you applied them in your past projects?
What programming languages are you most proficient in, and how have you applied them in your past projects?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Can you explain a complex technical concept to a non-technical audience?
Can you explain a complex technical concept to a non-technical audience?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Describe a significant technical challenge you faced and how you overcame it.
Describe a significant technical challenge you faced and how you overcame it.
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
How do you ensure code quality and maintainability in your projects?
How do you ensure code quality and maintainability in your projects?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
What tools or methodologies do you use for version control and project management?
What tools or methodologies do you use for version control and project management?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
How would you approach designing a new feature for our software?
How would you approach designing a new feature for our software?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Present a scenario where you need to resolve a system performance issue. How would you go about it?
Present a scenario where you need to resolve a system performance issue. How would you go about it?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
How would you handle a situation where you find a critical bug just before a release?
How would you handle a situation where you find a critical bug just before a release?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
What steps would you take to build a scalable software solution?
What steps would you take to build a scalable software solution?
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- Name the read and write paths separately; they rarely have the same bottleneck.
- Choose a partition key and say what query it makes expensive.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What breaks first when traffic grows ten times?
- How does this behave when that dependency is down for an hour?
Listing latency scales with page size, not with filters
The tenant listing endpoint reads resource filtered by tenant_id and status, ordered by updated_at DESC, and returns each row plus the owner's display name from app_user and the actor of that resource's latest resource_revision. p99 is 55 ms at 10 rows per page and 1.4 s at 200. Database telemetry shows 401 statements per request, each under 1 ms, and nothing in the slow-query log. Diagnose the cause and give the fix, stating the statement count per request and the p99 you expect afterwards.
Approach
- Read the counters before forming a theory. 401 statements for 200 rows is one driver query plus two per row, and sub-millisecond execution with an empty slow-query log rules out a bad plan. The time is round trips, which is why it is invisible in every per-query metric and scales with rows returned rather than with filter selectivity.
- Name the two per-row statements from their normalised text: a single-row app_user lookup by user_id, and a resource_revision lookup by resource_id ordered by version DESC LIMIT 1. Confirm by dropping those two response fields and watching the statement count fall to one. That locates the calls in the serialisation layer, not the repository.
- Check that the arithmetic accounts for the whole gap. Measure one round trip to the replica in isolation; 400 trips at roughly 3 ms of network plus 0.2 ms of execution is about 1.3 s on top of a 55 ms baseline, which matches. If the multiplication had fallen short, the N+1 would only be part of the story and you would keep looking.
- Batch both lookups. Collect owner_user_ids and resource_ids from the driver query, then issue WHERE tenant_id = $1 AND user_id = ANY($2) for the users, and PostgreSQL's SELECT DISTINCT ON (resource_id) ... WHERE resource_id = ANY($2) ORDER BY resource_id, version DESC for the latest revision, which the UNIQUE (resource_id, version) index serves directly. On an engine without DISTINCT ON, use a lateral join or a row_number window. Three statements per request at any page size.
Follow-up
- The page size is capped at 200 today. What breaks first if it is raised to 2,000, and is it still this bug?
- How do you stop the next N+1 from reaching production, given that no individual query is slow and the endpoint's tests pass?
Built from the rounds and topics Great River Energy candidates report.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Map the Great River Energy loop
- Write out the reported sequence: Phone Screen, In-Person Interview.
- For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.
Deliverable: A one-page map of the 2 reported rounds, with the weakest marked.
02Work Behavioral Interviewing (STAR method)
- Spend the session on Behavioral Interviewing (STAR method), which Great River Energy candidates report being tested on.
- Write one worked example in Behavioral Interviewing (STAR method) and time yourself on it.
Deliverable: One timed worked example in Behavioral Interviewing (STAR method).
03Work Situational / Scenario-Based Problem Solving
- Spend the session on Situational / Scenario-Based Problem Solving, which Great River Energy candidates report being tested on.
- Write one worked example in Situational / Scenario-Based Problem Solving and time yourself on it.
Deliverable: One timed worked example in Situational / Scenario-Based Problem Solving.
04Work Experience Narration (Tell me about a time when...)
- Spend the session on Experience Narration (Tell me about a time when...), which Great River Energy candidates report being tested on.
- Write one worked example in Experience Narration (Tell me about a time when...) and time yourself on it.
Deliverable: One timed worked example in Experience Narration (Tell me about a time when...).
05Answer out loud: Technical / Domain Questions
- Answer aloud, timed: What programming languages are you most proficient in, and how have you applied them in your past projects?
- Answer aloud, timed: Can you explain a complex technical concept to a non-technical audience?
Deliverable: Spoken answers to 2 reported Technical / Domain Questions question(s), under time.
06Answer out loud: Behavioral / Leadership
- Answer aloud, timed: Tell me about a time when you had to work with a difficult team member. How did you handle the situation?
- Answer aloud, timed: Describe a project where you took the lead. What was the outcome?
Deliverable: Spoken answers to 2 reported Behavioral / Leadership question(s), under time.
07Answer out loud: Problem-Solving / Case Studies
- Answer aloud, timed: How would you approach designing a new feature for our software?
- Answer aloud, timed: Present a scenario where you need to resolve a system performance issue. How would you go about it?
Deliverable: Spoken answers to 2 reported Problem-Solving / Case Studies question(s), under time.
Expand any day for tasks and deliverables. Your progress is saved on this device.
Behavioural rounds judge the decision you made and what it cost.
Tell me about a time when you had to work with a difficult team member. How did you handle the situation?
Tell me about a time when you had to work with a difficult team member. How did you handle the situation?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a project where you took the lead. What was the outcome?
Describe a project where you took the lead. What was the outcome?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
How do you prioritize tasks when you have multiple deadlines?
How do you prioritize tasks when you have multiple deadlines?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Give an example of how you managed a conflict within your team.
Give an example of how you managed a conflict within your team.
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
What is your approach to receiving and implementing feedback?
What is your approach to receiving and implementing feedback?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a time when you had to learn a new technology quickly to complete a project.
Describe a time when you had to learn a new technology quickly to complete a project.
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
- 01
Tell me about a time when you had to work with a difficult team member. How did you handle the situation?
- 02
Describe a project where you took the lead. What was the outcome?
- 03
How do you prioritize tasks when you have multiple deadlines?
- 04
Give an example of how you managed a conflict within your team.
How difficult is the interview process for this role?
The interview process can be challenging, particularly regarding technical questions, so candidates should prepare thoroughly. It's typical to spend several weeks preparing, focusing on both technical skills and behavioral competencies.
Great River Energy Software Engineer candidate reports ↗What differentiates successful candidates?
Successful candidates exhibit a strong technical foundation and the ability to communicate effectively. They demonstrate a collaborative spirit and align well with Great River Energy’s values.
Great River Energy Software Engineer candidate reports ↗What is the company culture like?
Great River Energy fosters a culture of innovation and collaboration, where team members are encouraged to share ideas and work together towards common goals.
Great River Energy Software Engineer candidate reports ↗What is the typical timeline from interview to offer?
The timeline can vary, but candidates can expect a response within a few weeks after the final interview.
Great River Energy Software Engineer candidate reports ↗Are there remote work options available?
While the company encourages a collaborative environment, hybrid work options may be available depending on the role and team dynamics.
Great River Energy Software Engineer candidate reports ↗What topics does Great River Energy test in interviews?
Great River Energy interviews most often cover Business Analysis, Behavioral Interviewing (STAR method), IT Business Analysis, Situational / Scenario-Based Problem Solving, and Requirements Gathering. The exact emphasis depends on the specific role you apply for.
Great River Energy Software Engineer candidate reports ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01Great River Energy Software Engineer candidate reports ↗
Company-reported rounds, questions and FAQ.
Candidate reports · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
PracHub practice material, not company-reported.
PracHub page · Accessed 2026-09-22 - 03PracHub preparation framework ↗
PracHub preparation guidance.
PracHub page · Accessed 2026-09-22