As a Software Engineer at Harris Computer, you are a critical link in the delivery of mission-critical software solutions. Harris Computer prides itself on acquiring and growing specialized, vertical-market software businesses, meaning your work directly impacts the operational stability and success of organizations in niche sectors. Your role is not just about writing code; it is about ensuring that the systems you build or maintain are robust, scalable, and capable of meeting the demands of Harris Computer's diverse client base.
You will find that this position offers a high degree of autonomy and technical ownership. Whether you are debugging complex systems, architecting new features, or optimizing existing infrastructure, your contributions are immediate and visible. The environment at Harris Computer is defined by a focus on sustainable growth and long-term product viability, making this an ideal role for engineers who value technical depth and the opportunity to see their work drive real-world business outcomes.
Preparation focus
editorialNo round sequence has been reported for this company, so work the categories below and confirm the format with your recruiter.
What to demonstrate
- Breadth across SQL, experimentation and product reasoning
- Ability to state assumptions before choosing a method
How to prepare
- Drill the practice exercises below and time yourself
- Prepare three quantified stories about decisions you drove
PracHub editorial advice for the preparation topics above.
Paginating a growing table with limit and offset
Two unrelated defects share the idiom. Correctness: rows inserted or deleted between page requests shift the window, so a consumer walking an export skips rows and sees others twice, which for a customer-facing sync is silent data loss rather than an error anyone notices. Cost: the database still produces and discards the skipped rows, so page N costs time proportional to N times the page size and a deep page on a large table degrades from milliseconds to seconds. Keyset pagination over a stable, unique, indexed ordering -- where (created_at, id) < ($1, $2) order by created_at desc, id desc limit $3 -- is constant-cost per page and immune to shifting, on the precondition that the cursor columns never change value for a row, which disqualifies updated_at as a cursor.
One shared connection pool for every tenant and every query class
A single tenant with a large table and a missing index can occupy every connection with slow queries, and every other tenant then waits in connection acquisition -- a queue invisible in database metrics, because the database itself looks healthy while the application starves. Containment is bulkheads: separate pools or per-tenant concurrency caps for interactive requests, background jobs and exports, a statement timeout low enough that a pathological query dies before it accumulates, and an idle-in-transaction timeout so a stuck client cannot pin a connection and its locks indefinitely. One caveat worth knowing in advance: if a transaction-pooling proxy sits in front of the database, session-scoped behaviour changes, so session-level advisory locks and settings applied outside a transaction do not survive the way they do on a direct connection.
Assuming fixed-width integer arithmetic cannot overflow
In languages with fixed-width integers, including C, C++, Java, Go and Rust, computing a midpoint as (lo + hi) / 2 overflows once the sum passes the type's maximum, so write lo + (hi - lo) / 2 instead. Say which language you are in: arbitrary-precision integers, as in Python or Ruby, remove this specific hazard and none of the others.
Issuing one query per row of a result set
Fetch related rows in a single batched query keyed by the ids you already hold, or join them into the original query. A per-row round trip multiplies network latency by the row count, and it looks perfectly fine against the ten rows in your development database.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
What criteria do you use to choose between different architectural pat…
What criteria do you use to choose between different architectural patterns for a new service?
Approach
- Walk one small example through your approach before writing the whole thing.
- Choose the data structure from the access pattern, not from familiarity.
- Name the brute-force solution and its complexity before improving on it.
Follow-up
- What is the worst case, and how likely is it on real data?
- Which test case would catch an off-by-one here?
Walk me through your process for documenting technical debt.
Walk me through your process for documenting technical debt.
Approach
- Restate the input: its shape, its size, and what is guaranteed about it.
- State the target complexity and say which constraint rules the naive version out.
- Walk one small example through your approach before writing the whole thing.
Follow-up
- What is the worst case, and how likely is it on real data?
- How does this change if the input no longer fits in memory?
How do you approach writing unit tests for legacy codebases?
How do you approach writing unit tests for legacy codebases?
Approach
- Name the brute-force solution and its complexity before improving on it.
- Choose the data structure from the access pattern, not from familiarity.
- Restate the input: its shape, its size, and what is guaranteed about it.
Follow-up
- How does this change if the input no longer fits in memory?
- Which test case would catch an off-by-one here?
Explain how you would troubleshoot a performance bottleneck in a produ…
Explain how you would troubleshoot a performance bottleneck in a production environment.
Approach
- Choose the data structure from the access pattern, not from familiarity.
- Walk one small example through your approach before writing the whole thing.
- State the target complexity and say which constraint rules the naive version out.
Follow-up
- What is the worst case, and how likely is it on real data?
- Which test case would catch an off-by-one here?
Seal an hour under late data with bounded memory
Metering ingest reads 256 partitions at 10,000 to 40,000 events/second. Events carry occurred_at and ingested_at, and during a producer replay the gap between them is hours. Seal each UTC hour once no more than 50 parts per million of that hour's eventual quantity can still arrive, using memory that does not grow with the size of the replay. Define the watermark, the lateness parameter and how you measure it, the structure holding open hours, and the write that performs the seal. State what an idle partition does to your watermark.
Approach
- Two clocks, two jobs. Bucket by
occurred_at, because that is the hour the customer is billed for, and advance the watermark oningested_at, because that is what the fold has consumed and whatsource_max_ingested_atrecords. Conflating them is what makes late data invisible. - The global watermark is the min over partitions of each partition's committed
ingested_at, not the max: the fold is trustworthy only as far as the slowest partition. The consequence is that one idle partition pins the watermark forever and nothing seals, so an idle partition must promote its watermark to wall clock after a stated idle timeout, and that timeout becomes a correctness parameter, because a partition that is slow rather than idle gets sealed past. - Choose the lateness L from the measured distribution of
ingested_at - occurred_at, weighted by quantity rather than by event count. The target is 50 ppm of the hour's quantity, and a replay is rare in events while carrying disproportionate mass, so an event-weighted quantile picks an L that is comfortably wrong at exactly the moment it matters. - Measure that quantile in bounded memory. A Greenwald-Khanna summary gives epsilon-approximate quantiles in O((1/epsilon) log(epsilon n)) space; a t-digest costs more per merge but has relative error that tightens at the tails, which is the half of the distribution you are reading at p99.99. Keep a separate summary per tenant class, because one tenant's batch importer is not the population.
- Hold open hours in a min-heap keyed by
hour_start. When the watermark advances, pop every hour withhour_end + L < Wand seal it: O(log H_open) per advance and O(1) amortised per event to touch its bucket. Memory is open hours multiplied by distinct(tenant, workspace, sku)keys, so cap the number of simultaneously open hours and spill the oldest intousage_rollup_hourlyasstatus='open'with arevisionbump. While an hour is open the row is upsertable, so the store is your overflow. - The seal itself is a conditional write:
update ... set status='sealed', sealed_at=now() where status='open' returning .... Two sealers race on every restart, and the loser must see zero rows and stop rather than write a second value. After the seal, an event for that hour is not an upsert but an adjustment, andsource_max_ingested_atis what proves it arrived afterwards.
Worked solution 40 min
- Replay a day of events with a synthetic lateness distribution: 99.9% under two minutes, plus a 0.05% tail at four to six hours that carries 3% of total quantity.
- Compute the p99.99 lateness two ways, event-weighted and quantity-weighted, and put the two numbers side by side.
- Implement the min-heap of open hours with the watermark as the min over 256 partitions, then stall one partition for 20 minutes and observe what seals.
- Set the idle-partition timeout to 60 seconds, repeat the stall, and measure how much quantity arrives after the seal.
- Attempt the seal from two workers at once and confirm the conditional update lets exactly one through.
Follow-up
- A replay starts during the sealing window for a period you are about to close. What do you do, and what is the customer-visible consequence of each option?
- Your measured quantity-weighted p99.99 lateness is six hours and the invoice must be issued at 02:00 UTC on the first. How do you reconcile those two numbers?
- How would you detect that L has drifted before it costs you an hour's quantity?
Migrate a live partitioned event table without blocking ingest
usage_event is range-partitioned daily on ingested_at, holds roughly 250M rows per day across 400 live partitions, and is written at 10-40k rows/second. Two changes are required: quantity must move from double precision to numeric(20,6), and a new environment column must become NOT NULL with a default of 'production'. Ingest cannot stop. Give the ordered plan, naming for each step the lock it takes, what that lock blocks, and roughly how long it is held. Identify the one step that cannot be rolled back cleanly once traffic depends on it.
Approach
- Classify the two changes before planning anything. Adding a column with a non-volatile default has been metadata-only since PostgreSQL 11, so it is cheap. Changing double precision to numeric is not binary-coercible, so
alter column ... typerewrites every partition under ACCESS EXCLUSIVE and rebuilds its indexes; on this volume that is hours of blocked ingest and is simply not an option, which is why the plan is expand-and-contract rather than one statement. - Expand: add
quantity_numeric numeric(20,6)andenvironmentwith its default on the parent. Both are catalogue-only but both take a brief ACCESS EXCLUSIVE that cascades to partitions, so run each withlock_timeoutset to a second or two and retry on failure. A queued ACCESS EXCLUSIVE request blocks every reader behind it, which is how a metadata-only change turns into an outage. - Dual-write: deploy producer code that populates both columns on every insert, and leave it running before anything reads the new column. This is the step that cannot be reverted cleanly. Once readers depend on quantity_numeric, reverting the writer leaves rows with a null there, and the gap is only discoverable by re-reading the old column, which the readers have stopped doing.
- Backfill older partitions in batches keyed on the primary key, oldest first, committing every few thousand rows with a pause between batches, and skipping the partition still receiving writes until it rotates. Each batch is an ordinary UPDATE taking row locks only. The cost is bloat and WAL rather than blocking, so watch dead tuples and let autovacuum keep pace instead of wrapping 400 partitions in one transaction.
- Make NOT NULL cheap with the three-step form:
add constraint ... check (environment is not null) not valid(brief ACCESS EXCLUSIVE, no scan), thenvalidate constraint(SHARE UPDATE EXCLUSIVE, scans while reads and writes continue), thenset not null, which from PostgreSQL 12 uses the validated check and skips its own full scan. Do this per partition, then on the parent. - Switch and contract: move reads to the new column behind a flag, verify over a full period that both columns agree on freshly written rows, drop the old column (metadata-only), and only then remove the dual-write. Any index on the new column goes on with CREATE INDEX CONCURRENTLY per partition, since CIC is not supported on a partitioned parent: create the parent index with ONLY, build each child concurrently, then ALTER INDEX ... ATTACH PARTITION until the parent index becomes valid.
Follow-up
- A CREATE INDEX CONCURRENTLY fails halfway through the partition list. What state is the table in, how do you detect it, and what do you run?
- The producer computes quantity itself. What happens to a request already in flight when the dual-write deploy lands, and does it matter?
- Give two queries that prove the backfill is complete: one cheap enough to run every minute, one authoritative.
Explain why the metering dashboard scans every daily partition
usage_event is range-partitioned daily on ingested_at and holds tenant_id, workspace_id, environment, sku, quantity numeric(20,6), occurred_at and ingested_at. The only relevant index is on (occurred_at). A dashboard runs select sku, sum(quantity) from usage_event where tenant_id = $1 and date_trunc('hour', occurred_at) >= $2 and environment = 'production' group by sku, and EXPLAIN shows a sequential scan of every partition. Give each distinct reason, rewrite the predicate so an index can serve it, propose the index, and state the write cost its column order adds.
Approach
- Separate the three causes rather than blaming one. First,
date_trunc('hour', occurred_at)wraps the column, so the predicate is not sargable against a btree on the bare column. Second, pruning keys off ingested_at while the query constrains occurred_at, so no partition can be excluded. Third, even made sargable, (occurred_at) is not tenant-leading, so for one tenant among thousands the scan reads the whole time range and discards nearly all of it. - Rewrite the bound carefully, because the obvious rewrite is only conditionally equivalent.
date_trunc('hour', x) >= $2equalsx >= $2only when $2 is already hour-aligned; for an arbitrary $2 it meansx >= date_trunc('hour', $2) + interval '1 hour'. Normalise the parameter in the caller and leave the column bare. - Restore pruning with a second, redundant predicate on the partition key:
ingested_at >= $2 - interval '<late-data horizon>'. State both sides of it. It prunes to a handful of partitions, and it silently omits any event whose ingest lagged past that horizon, which is precisely what a producer replay produces. Either document the horizon as a stated bound, or partition on occurred_at and move the problem into the dedup window instead. - Propose
(tenant_id, occurred_at) include (sku, quantity)per partition. A partial indexwhere environment = 'production'mostly saves size rather than selectivity, since production dominates the three environments; take it if non-production is a meaningful share and skip it otherwise. - Price the write path honestly. At roughly 250M rows/day each extra index is another insert plus WAL per row, and a tenant-leading key scatters inserts across one hot leaf per active tenant instead of appending to a single rightmost leaf, so page dirtying and random I/O both rise. An INCLUDE payload widens every leaf entry and enlarges the index accordingly.
- Add the index-only-scan caveat before someone reports it as a regression: on a freshly appended table the visibility map is not yet set for recent pages, so the INCLUDE columns still cost heap fetches until autovacuum has been through, and the newest hour is exactly the data the dashboard reads.
Worked solution 30 min
- Build 30 daily partitions with skewed tenants, one holding about 40% of the rows, then ANALYZE.
- Run
explain (analyze, buffers)on the original query and record how many partitions were scanned and the rows removed by filter. - Apply the rewritten predicate and the index, re-run, and confirm the plan lists only the partitions inside the ingested_at bound.
- Re-run with $2 set to a non-hour-aligned timestamp and confirm the rewritten and original predicates return identical rows.
- Insert an event with ingested_at six hours past occurred_at and check whether the pruning predicate excludes it.
Follow-up
- CREATE INDEX CONCURRENTLY is not supported on a partitioned parent. Give the sequence that gets this index onto 400 existing partitions without blocking ingest.
- One tenant holds 200 times the median row count and the dashboard still times out for them with the index in place. What changes?
- Should this read hit
usage_rollup_hourlyinstead? State what that costs in freshness and what the watermark lets you promise.
Design the batch ingest endpoint metering agents retry into
A customer-run agent posts usage events in batches of up to 1,000 to metering-ingest with a 30-second timeout and at-least-once retry of the whole batch. Each event carries event_id, idempotency_key, sku, quantity and occurred_at; the server adds ingested_at, and usage_event is partitioned daily on ingested_at with unique (ingested_day, tenant_id, idempotency_key). Design the endpoint: the request shape, what the response says when 900 events are new, 90 are duplicates and 10 are malformed, the status code, and the agent's algorithm on timeout. Then state the deduplication horizon and justify it against that unique constraint.
Approach
- Fix the per-item outcome taxonomy first, because the status code follows from it: accepted, duplicate, and rejected with a permanent code. A duplicate is a success; reporting it as an error makes the agent either re-send revenue it already delivered or drop it.
- Allow only permanent failures per item. A transient per-item failure inside a 200 invites the agent to discard that event, so anything transient escalates to a 5xx for the entire batch. A 200 is then a promise that every event not marked rejected is committed and durable.
- Return 200 with a results array aligned by index and carrying the event id, so the agent can retry precisely the subset that needs it and quarantine the ten malformed events instead of hard-looping a poison batch forever. Cap the batch at 1,000 items and a byte size, with 413 beyond it and 429 with Retry-After for backpressure.
- Deduplicate per event, never per batch: the agent may split, merge or reorder a retried batch, so a batch-level key matches nothing on the second attempt. The key is (tenant_id, idempotency_key), and the tenant comes from the resolved credential; a tenant id present in the body is compared against it, never trusted.
- Size the horizon as a correctness parameter. The unique index includes the partition key, so it deduplicates only within one day: a retry that crosses midnight, or a replay run a week later, passes straight through it. A separate dedup store keyed (tenant_id, idempotency_key) with a TTL exceeding the agent's maximum retry window plus the longest replay you intend to support is what actually enforces the invariant, which makes its retention a correctness setting rather than a cost knob.
- Order the commit against the response and the acknowledgement: commit then respond at the endpoint, and downstream commit the fold then acknowledge the message. Acknowledging first turns a crash into silently lost revenue with no error raised anywhere.
Follow-up
- The agent times out at 30 seconds having received nothing. What exactly does it do next, and what in your design makes that safe?
- Ten events are rejected every hour for a week and nobody notices. What does the endpoint owe the customer beyond a per-item 4xx code?
- A replay pushes 40 million events through this endpoint in an hour. Which part of your design degrades first?
Webhook fan-out with per-endpoint isolation and backoff
One domain event fans out to every matching subscription, producing a webhook_delivery row per (subscription_id, event_id, redelivery_seq). Peak unique event rate is 20k/second; attempts run five to ten times that once fan-out and retries are counted. One customer endpoint has returned 503 for six hours and its backlog holds days of events; every other customer must be unaffected. Design the delivery system: how a worker claims work, the backoff schedule, the per-endpoint circuit breaker, the queue partitioning, and whether you offer ordering per subscription. State the delivery guarantee in one sentence.
Approach
- State the guarantee first, because it determines the rest: at-least-once with a stable event_id, and the consumer documented as responsible for idempotency. Exactly-once over HTTP is not deliverable - the 200 can be lost after the customer has already committed - so any design that promises it is either lying or is really offering at-most-once.
- Partition work per subscription rather than into one global pool, with a concurrency cap per subscription. With a shared pool, the endpoint that has been dead for six hours consumes workers on retries that will fail, and every other customer's delivery latency rises: head-of-line blocking across tenants is the exact failure being designed against here.
- Claim by compare-and-set with a fencing token: UPDATE webhook_delivery SET status = 'in_flight', lease_token = $new, leased_until = now() + interval '60 seconds' WHERE delivery_id = $1 AND status IN ('pending','failed_retryable') AND (leased_until IS NULL OR leased_until < now()), and make the terminal write carry AND lease_token = $new so a paused worker's late write is rejected rather than overwriting a newer attempt. Find due work through the partial index on next_attempt_at WHERE status IN ('pending','failed_retryable'), so the scan is proportional to live rows rather than to the terminal rows that outnumber them by orders of magnitude.
- Use full jitter: sleep uniformly in [0, min(cap, base x 2^(attempt-1))]. Plain exponential backoff hands a recovering endpoint its entire backlog as one synchronised herd and knocks it over again; full jitter de-correlates it. Then check the schedule actually spans the retention you promise - with base 1 s and a 3,600 s cap, twenty attempts have an expected total elapsed time of only about 4.6 hours, so a twenty-four-hour promise needs roughly fifty-nine attempts or a larger cap.
- Trip a circuit per endpoint on consecutive failures or a failure ratio over a rolling window: stop dispatching, push next_attempt_at out or mark new deliveries dropped_circuit_open, and half-open with exactly one probe rather than a batch. Bound the backlog explicitly with a per-subscription cap or retention, and decide in advance whether a recovered endpoint receives six hours of events at full rate or a pointer telling it to fetch what it missed.
- Offer ordering only as an opt-in mode of one in-flight attempt per subscription, and price it honestly: with parallel attempts a retried event overtakes a newer one, so ordering requires serialisation, and serialisation means one slow endpoint blocks its own queue entirely. That converts a shared problem into that customer's own problem, which is the right place for it, but it is still a real cost.
Worked solution 35 min
- Compute the attempt rate: 20k unique events/second x mean fan-out x retry multiplier, and size worker pools and the per-subscription concurrency cap from it.
- Write the claim statement and the terminal write, and point at the clause that rejects a resumed worker's stale write.
- Tabulate the backoff for attempts 1 to 20 with base 1 s and cap 3,600 s, take the expected value of each full-jitter sleep as half its ceiling, and sum to get total expected elapsed coverage.
- Decide the policy for a subscription down six hours: events buffered, bytes held, and what the customer actually receives when it returns.
Follow-up
- The endpoint recovers. Does it receive six hours of events at full rate, and what does that do to it?
- Trace the exact code path by which an event belonging to one tenant could be signed and sent to another tenant's endpoint.
- A customer insists they never received an event your row marks delivered. What evidence do you have, and what does payload_digest let you prove?
Invoice detail latency triples after an ORM relationship refactor
An invoice detail endpoint returned in 40 ms at p99 last week. After a refactor replaced a hand-written join with ORM relationship access it returns in 1.4 s, and the regression grows with the number of invoice_line_item rows on the invoice. Database CPU rose, but no statement in the slow-query log exceeds 3 ms. You have request traces with per-span SQL, the ORM statement log, and a staging copy of the data. Produce an ordered diagnostic checklist, the measurement that confirms the cause before any code change, and the fix.
Approach
- Count statements per request before reading any statement duration. A slow-query log hides this class by construction, because every individual query is fast and only their number is wrong; take one trace and count SQL spans.
- Establish proportionality rather than asserting it: sample invoices with 5, 20, 60 and 200 line items and plot statements per request against line count. A straight line of slope 1 through an intercept of one or two identifies a lazy relationship load, and no index or cache would move that line.
- Locate the emitting attribute access in the refactored code and check whether the same shape repeats one level deeper, for instance a tax or adjustment collection hanging off each line, which turns the cost quadratic.
- Fix with a bounded statement count: either one join that fetches invoice and lines together, or two statements where the second is WHERE invoice_id = $1 AND tenant_id = $2. Keep tenant_id in the predicate so the read stays tenant-scoped even though invoice_id already implies it.
- Choose between the two deliberately: the join duplicates the wide parent row across N children on the wire, the two-statement form avoids that for one extra round trip. Prefer the join for narrow parents and the split for wide ones.
- Pin it with a per-request statement-count assertion in a test that varies line count, because a latency assertion passes on a small fixture and would not have caught this.
Follow-up
- The endpoint now also needs per-line tax rows. Show the shape that keeps statement count constant instead of reintroducing the same defect one level down.
- How does this change if a transaction-pooling proxy sits between the service and the database, so each statement may land on a different backend session?
- The same page paginates invoices with LIMIT and OFFSET. Why is that a second, independent defect, and what replaces it?
Roughly ninety minutes on weeknights with one longer weekend block. The plan cuts scope rather than compressing everything, on the assumption that one thing finished per night beats four half-started.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Fix the scope and take a cold baseline
- Read the role description and write the three things the loop will almost certainly test, then write an explicit not-doing list and keep it visible all week.
- Take one twenty-five-minute coding problem and one fifteen-minute design prompt cold, and write the single sentence naming what blocked each, because those two sentences decide where the remaining evenings go.
- Set the week's rule: one thing finished every night, including the night you only have forty minutes.
Deliverable: A one-page scope with a not-doing list and two cold attempts, each carrying one sentence on what blocked it.
Practice prompt ↗Practice prompt ↗Worked solution ↗02One pattern, written three times from blank
- Choose the single pattern most likely to appear in your loop and write it three times from an empty file rather than editing the previous attempt.
- On the third pass, write the invariant as a comment before the loop body and the complexity before the first line of code.
- Stop at ninety minutes even if the third version is imperfect, and write the one thing you would fix given another hour.
Deliverable: Three independent implementations of the same pattern plus a note on what changed between them.
Practice prompt ↗Practice prompt ↗03One design, only to the depth you can defend
- Take one system shape and go only as far as requirements, interface and data model, refusing to draw a box you could not survive a follow-up about.
- Attach one number to each non-functional requirement, deriving it rather than asserting it, and write the assumption the number rests on.
- Write the one tradeoff you are choosing against and the observation that would make you reverse it.
Deliverable: One design at interface-and-schema depth with derived numbers and one written reversible tradeoff.
Practice prompt ↗Practice prompt ↗04Only the fundamentals you will have to defend
- Write, in under two hundred words each, the answers to the two questions that follow almost any implementation: why this structure and not the obvious alternative, and what happens to this code at a hundred times the input.
- Write what an index actually costs: faster lookups on the indexed columns against a write that now maintains a second structure, plus the cases where the planner declines to use it anyway, low selectivity, or a predicate wrapping the column in a function.
- Delete any answer you cannot deliver aloud in under a minute, since an answer that needs reading is not an answer you have.
Deliverable: Three written answers, each under two hundred words and each timed aloud.
Practice prompt ↗Practice prompt ↗Worked solution ↗05Your own work, timed
- Write a ninety-second and a four-minute version of your main project and time both aloud rather than reading them.
- Prepare the two follow-ups that always come: what you would do differently, and how you knew it worked.
- Put one number in the first sentence and be ready to say exactly where it came from and what it excludes.
Deliverable: Two timed narratives with one defensible number in the opening line.
Practice prompt ↗Practice prompt ↗06The one full rehearsal, in the weekend block
- Run a sixty-minute mock covering a coding round and a design round in one sitting with no break, because sustained attention is the thing evenings have not trained.
- Immediately afterwards, and before hearing any feedback, write the three moments you lost the thread.
- Spend the rest of the block only on those three moments, and on nothing you merely feel shaky about.
Deliverable: Mock notes naming three failure moments with a specific fix written under each.
Practice prompt ↗Practice prompt ↗07Taper
- Write the twenty-minute warm-up you will actually do on the morning: one problem you can already solve from a blank file, one design you can narrate, and nothing you have never seen.
- Re-read only your own notes from this week and open no new material.
- Write the logistics down: the editor or shared document you will be working in, whether execution and lookups are permitted, and the sentence you will use when you do not know something.
Deliverable: A one-page card holding the design structure, the project numbers, and the logistics.
Practice prompt ↗Worked solution ↗Expand any day for tasks and deliverables. Your progress is saved on this device.
Keep one story where the bad call was yours rather than a dependency's or a manager's. Name the check that would have caught it, whether you added that check afterwards, and whether it has fired since. Answers that route blame outward end the conversation early; answers that end in a guardrail someone still relies on tend to open it up.
Describe a time you had to learn a new technology or framework under a…
Describe a time you had to learn a new technology or framework under a tight deadline.
Approach
- State the situation in two sentences and spend the rest on the reasoning.
- Close with what you would do differently, concretely.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
Own the incident where invoices undercounted metered usage
A metering consumer acknowledged each batch before committing the fold into usage_rollup_hourly. A rolling deploy restarted consumers mid-batch for two hours; roughly 1.4M usage_event rows were acknowledged and never folded, and 61 invoices sealed against the resulting rollups before anyone noticed. Take the owner's role. Describe an incident of comparable blast radius you owned: how it surfaced, the query that sized the loss, what you stopped first, and how the money was corrected. Give a wall-clock timeline and one thing you got wrong while it was still live.
Approach
- Open with the invariant that broke and the direction of the error, because they determine everything else: acknowledging before committing makes the consumer at-most-once, so this loses events rather than duplicating them, and loss raises no error anywhere. A listener who hears 'we lost revenue silently' knows immediately why detection took two hours.
- Size it with a stated reconciliation rather than an adjective: sum(quantity) from usage_event grouped by (tenant_id, sku, hour of occurred_at) over the window, against usage_rollup_hourly.quantity_sum on the same keys, filtered to environment='production' because staging and sandbox are metered but not billed. Then bisect by hour and tenant until single cells explain the gap. Say how long that ran and whether a replica could serve it while the incident was live.
- Separate mitigation from fix and say which came first. Mitigation is holding the sealing job, because a sealed row is frozen by design and every minute of sealing converts a recoverable rollup into an invoice correction. The fix is moving the acknowledgement after the commit, which re-introduces duplicates that the dedup check on (tenant_id, idempotency_key) must now absorb.
- State the correction path in the domain's own terms: sealed periods are never edited, so each affected tenant gets an adjustment line on the next invoice with kind='adjustment' and voided_by_line_id pointing at the line it reverses, priced against the same rate tier and carrying the watermark it priced against. That is four separate numbers — tenants affected, minor units, the cycle the adjustment lands in, and when customers were told.
- Close on one prevention control with its cost, not five: a per-hour reconciliation comparing raw sum to rollup sum that pages above a threshold. Name the threshold and the false-page rate you accepted, because a detector nobody will keep staffed is not prevention.
- Name a mistake you made inside the response window — the wrong first hypothesis, a mitigation that made it worse — rather than a design mistake from six months earlier. That is the part candidates rehearse away and interviewers weight heavily.
Follow-up
- Your fix moves the acknowledgement after the commit. What breaks now, and what absorbs it?
- One undercharged tenant has since churned. Do you bill them, and who decides?
- How would you have caught this in ten minutes instead of two hours, and what would that detector cost you in pages per week?
Argue against failing open when the control plane is unreachable
The gateway caches credential-to-context decisions with a sixty-second TTL. A design proposal says that when control-plane reads fail, pods should keep serving from expired entries indefinitely so a control-plane outage never becomes a product outage. You believe that converts every revocation into an unbounded one. Describe a design you argued against while it was still a live proposal: what you measured or modelled to make the case, what you conceded, who decided, and what happened afterwards. Say what would have changed your mind before the decision, not after it.
Approach
- Reframe it from a values argument into a bounded-staleness argument. Both sides already accept the cache; the disagreement is only about the ceiling on how long a revoked credential keeps authorising. Put a number on the table — serve stale for up to fifteen minutes, then fail closed — and make the other side argue against a number rather than against a principle.
- Bring arithmetic rather than adjectives: the rate of revocations with revoked_reason in ('suspected_leak','auth_version_bump'), the observed distribution of control-plane unavailability, and the product of the two, which is expected requests served by revoked credentials per outage-hour. At 30k requests/second the unbounded version is not a subtle exposure and the number says so.
- Concede the strong half of the opposing case first, because that is what buys you the room: failing closed turns one service's outage into a total outage across three regions, and a control plane doing tens of writes per second is not engineered to the gateway's availability target. A proposal you have not steelmanned reads as reflex.
- Propose the asymmetry that usually resolves this: stale entitlements cost bounded money (a quota fifteen minutes out of date over-serves by a computable amount), while a stale revocation costs unbounded access. Split the cached decision by what it authorises, give the two halves different staleness ceilings, and let the entitlement half fail open while the revocation half fails closed.
- State the propagation dependency plainly, since it is the part that is missed: validity is also derived from the principal's auth_version, so password reset and sign-out-everywhere flow through this same cache. A design that bounds staleness for explicit revocation and not for auth_version bumps has only fixed half of it.
- Say who decided, and what you did afterwards in either outcome: write the decision down with its number and a review date, and instrument the exposure you were worried about so the next round of the argument is settled by data instead of by seniority.
Follow-up
- Publish-subscribe invalidation is lossy under a partition, and a TTL is the only hard bound. What TTL do you pick, and what does it cost you at 30k requests/second?
- The key was revoked because it was found in a public repository. Does your answer change, and where does that urgency live in the design?
- You lost the argument and six weeks later the failure you predicted happens. What do you say in the review, and what do you not say?
- 01
Describe a time you had to learn a new technology or framework under a tight deadline.
- 02
A metering consumer acknowledged each batch before committing the fold into usage_rollup_hourly. A rolling deploy restarted consumers mid-batch for two hours; roughly 1.4M usage_event rows were acknowledged and never folded, and 61 invoices sealed against the resulting rollups before anyone noticed. Take the owner's role. Describe an incident of comparable blast radius you owned: how it surfaced, the query that sized the loss, what you stopped first, and how the money was corrected. Give a wall-clock timeline and one thing you got wrong while it was still live.
- 03
The gateway caches credential-to-context decisions with a sixty-second TTL. A design proposal says that when control-plane reads fail, pods should keep serving from expired entries indefinitely so a control-plane outage never becomes a product outage. You believe that converts every revocation into an unbounded one. Describe a design you argued against while it was still a live proposal: what you measured or modelled to make the case, what you conceded, who decided, and what happened afterwards. Say what would have changed your mind before the decision, not after it.
Is this an official Harris Computer interview guide?
No. It is PracHub's own research and practice material for the Software Engineer role at Harris Computer. Rounds and questions reflect what candidates have reported, not a process Harris Computer has published, and they change over time. Confirm the current format and scope with your recruiter.
PracHub interview research ↗How should I prepare for the technical portion of the interview?
Focus on your past projects. Be ready to discuss the specific technologies you used, the challenges you faced, and the decisions that led to your final implementation.
PracHub interview research ↗What is the company culture like?
Harris Computer values autonomy, stability, and long-term thinking. Candidates report that the interviews favor engineers who are self-starters and take pride in the quality of their craft.
PracHub interview research ↗How long does the process take?
Timelines vary by team. You will receive clear communication from your recruiter regarding the next steps.
PracHub interview research ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01PracHub interview research ↗
PracHub editorial research into this company and role, maintained with this guide. Candidate-reported, not an employer publication.
PracHub page · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
Cross-company practice questions for this role.
PracHub page · Accessed 2026-09-22 - 03PracHub interview preparation framework ↗
The framework the preparation plan follows.
PracHub page · Accessed 2026-09-22
