A Software Engineer at Hollister plays a vital role in bridging the gap between cutting-edge technology and life-enhancing healthcare solutions. As an independent, employee-owned company, Hollister relies on its engineering teams to build and maintain the digital infrastructure that supports its mission of making life more rewarding and dignified for patients worldwide. You will not just be writing code; you will be contributing to systems that ensure product quality, operational efficiency, and innovation in ostomy, continence, and critical care.
The role is inherently cross-functional, requiring you to collaborate with R&D, manufacturing, and Quality/Regulatory Affairs teams. Whether you are focusing on test automation, cloud infrastructure, or enterprise system development, your work directly influences how the company scales its operations and delivers value across 80 countries. Expect a high-impact environment where your technical decisions are balanced against the rigorous compliance standards required in the medical device industry.
Screening Call
reportedThe person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.
What to demonstrate
- Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
- Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
- Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural
How to prepare
- Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
- Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
- Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one
Technical Interviews
reportedMost of the time lost in this format is not lost to thinking. It goes to a standard-library call you half-remember, an off-by-one in a loop bound, and a debugging loop that mutates code at random until something passes. When output is wrong, stop re-reading the whole function: take the smallest input that reproduces it and walk the state through by hand, printing intermediates if the environment allows. Guessing at a fix without a failing case you understand is how a five-minute bug becomes twenty, and the clock does not pause while you do it.
What to demonstrate
- Whether you reach the right structure without a detour, and can write it from memory rather than only recall that one exists
- Whether overflow is considered where the language has fixed-width integers, since a signed 32-bit value stops at 2,147,483,647 and then wraps in Java, is undefined behaviour in C++, and does not arise in Python, whose integers grow instead
- Whether recursion depth is treated as a constraint on large inputs, given that CPython's default limit is 1000 frames and a deep recursion can exhaust the stack in any language where an iterative version would not
- Whether a failing case is isolated and explained before any edit is made to the code
How to prepare
- From an empty file and with no references open, implement the pieces you lean on most: a heap push and pop, an iterative DFS with an explicit stack, and a binary search whose midpoint is written lo + (hi - lo) / 2, which avoids the overflow that (lo + hi) / 2 can hit in a fixed-width integer type
- Time yourself on the ten library calls you look up most, such as sorting with a custom comparator, splitting and joining strings, and finding the next key at or above a value in an ordered map, until the lookup is gone
- Take a solution you know is broken and, before touching it, write one sentence naming the input, the expected value and the actual value. Repeat until you do it without deciding to.
Behavioral Interviews
reportedWhat you say here is written down by each interviewer and compared afterwards, so the unit of evaluation is a claim someone else could check, not a well-told narrative. Two things make a story checkable: detail only a participant would hold, and a clean line around which part was yours. Vague ownership is the usual failure and it is usually accidental, because engineers say we about the team's work and we about their own, so the thing they personally built disappears into the plural. Name the part you wrote, and name who did the rest.
What to demonstrate
- Whether your details are ones a participant would hold and an observer would not: the constraint that ruled out the obvious approach, the first attempt that failed, the person who objected and on what grounds
- Whether ownership survives a direct question, since a follow-up to we decided is routinely who decided, and an answer that stays plural at that point is read as the work belonging to someone else
- Whether the numbers you quote are ones you would say identically to a former colleague with the dashboard open
How to prepare
- Go through each story replacing every we with either I or a named role (the on-call engineer, the reviewer, the other team) and check the story still holds together. Wherever it stops making sense you have found a part you cannot actually speak to
- Open the artefacts for two of your stories, the pull request, the design doc, the incident notes, and read them for dates and figures you have been rounding in the retelling. Correct your version to match
- For each story write the single sentence you would least want repeated to a former teammate, then either make it accurate or take it out
Psychometric Assessment
reportedThe same problem is scored by two different mechanisms depending on the format, and preparing for one does not cover the other. With a person watching, partial progress is visible and a hint is a correction you can absorb; silence is the expensive failure, because nobody can read a half-written function. With an automated grader there is no partial credit for what you were about to do, nobody to ask, and the worked examples in the prompt are the entire specification. Read them as a contract, down to whether an empty result should be an empty list or no output at all.
What to demonstrate
- In a live session, whether your commentary tracks what your hands are doing, and whether a hint redirects you or gets defended against
- In an automated one, whether you cover the cases the examples do not show, since the hidden cases are where the score moves
- Whether you manage the clock on purpose: abandoning an approach that is not converging while there is still time to write something simpler that finishes
How to prepare
- Have someone hand you a problem and feed you one deliberately wrong hint. Practise testing it against a concrete case instead of accepting or rejecting it on authority.
- Do one timed run a week in a plain browser editor with autocomplete, linting and your own snippets switched off, which is closer to what these environments give you
- For the automated format, write the harness before the solution: a main that feeds the worked examples plus an empty and a single-element case and prints expected against actual, so a wrong submission is caught by you first
Final Interviews
reportedNobody in the room with you decides this. Interviewers typically write their rounds up separately, often before seeing anyone else's, and the outcome is settled later from those write-ups. A split panel gets resolved by whichever note carries specific evidence, so what you want out of each room is one concrete thing that person could write down: a bug you caught yourself, a trade-off you named, a decision you owned. The rest is arithmetic. The project you describe in a behavioural conversation is often the same system you sketched an hour earlier, and the two accounts have to agree.
What to demonstrate
- Whether the scale, team size and timeline you attach to a project hold steady when that project resurfaces in a different round
- Whether each interviewer leaves with a specific thing to cite rather than a general impression of competence
- Whether a trade-off you defended in one round survives a challenge in another, instead of being quietly swapped for the answer the new interviewer seemed to want
- Whether a question you have already answered earlier in the day gets the same answer at the same depth, without visible impatience
How to prepare
- Write a one-page sheet per project fixing the figures you will quote — request volume, data size, team size, elapsed time, what broke — and say them aloud from the sheet until they come out identical every time
- For each round on the schedule, decide in advance the one sentence you want in that person's notes, then check in a mock that you said it outright instead of leaving it to be inferred
- Have someone ask you the same project question twice, an hour apart, and diff the two answers for numbers that moved or a trade-off that reversed
PracHub editorial advice for the preparation topics above.
Choosing an index from the columns a query mentions rather than from how it filters and orders
A composite B-tree index on (a, b, c) can be seeked only as a left prefix: equality on a, then equality on b, then a range or an ordering on c. A query that filters on b alone cannot seek into it at all and at best gets a full scan of the index; a query that filters a and ranges on b gets no benefit from c, because the index is only sorted by c within a fixed (a, b) pair. The practical consequence is that one index per column is close to useless for multi-predicate queries while a single correctly ordered composite index turns a scan into a lookup. The ordering half is what gets missed: if the index cannot satisfy the ORDER BY, the database must read every matching row and sort before the limit can apply, so a LIMIT 20 over a million matching rows still reads a million rows.
Assuming an isolation level prevents the anomaly you actually have
Isolation levels are named by the SQL standard but implemented differently, so any claim about one is only true of a named engine. PostgreSQL defaults to READ COMMITTED, where every statement takes a fresh snapshot, so two statements inside one transaction can legitimately disagree about the same row. Its REPEATABLE READ is snapshot isolation: it removes non-repeatable and phantom reads but permits write skew, where two transactions each read a set, each conclude their own write is safe, both commit, and the combined result violates a constraint that no single row expresses. Only SERIALIZABLE closes that, and it closes it by aborting a transaction with a serialization failure (SQLSTATE 40001), which means the guarantee is theoretical unless the application has a retry loop. InnoDB's REPEATABLE READ is a different mechanism again - plain SELECTs read a consistent snapshot while locking reads and writes see the latest committed row - so a read-modify-write inside one transaction can act on a value that the transaction's own earlier SELECT never returned.
Abandoning working code to chase the optimal solution
Get the straightforward version correct, state its complexity, and only then optimise, keeping the working version until the faster one passes the same cases. A correct quadratic solution with a stated path to linear beats a half-written optimal one that never ran.
Retrying a write that is not safe to repeat
A timeout tells you nothing about whether the server applied the write, so a blind retry of a create or a charge can duplicate it. Either make the operation idempotent, with a caller-supplied key the server deduplicates on or a conditional update, or do not retry it; and use exponential backoff with jitter so the retries of many clients do not synchronise into a second outage.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Diff a projection against the primary without per-row point reads
The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.
Approach
- Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
- Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
- For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
- Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
- Pin the comparison to a point in time or it reports lag as drift: consider only rows whose updated_at is older than now minus a lag margin, and re-check each candidate mismatch individually before repairing. At 1,200 writes per second a diff without this reports thousands of false positives, and an unattended repairer would then overwrite live rows with stale values.
- Make the run resumable and throttled: batch by range key, persist the last completed range, and watch a signal such as replica lag or primary CPU, pausing rather than pressing on. A reconciliation that cannot be stopped and resumed gets killed halfway and restarted from zero, which is how a repair becomes an incident.
Follow-up
- The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
- Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
- How would you run this continuously at low cost instead of only as incident response?
Archive a resource graph without breaking live references or recursing
Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.
Approach
- Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
- Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
- Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
- Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.
- Store the graph as CSR rather than a map of lists: an offsets array of V+1 8-byte entries plus E 8-byte targets is about 80 MB at this size, where boxed adjacency lists cost several times that and lose cache locality on every hop.
- Run Kahn over the condensation for the order in O(V+E). If the emitted count is short of the component count the condensation step itself is wrong, since a condensation cannot contain a cycle, which makes the check free.
Worked solution 30 min
- Write the edge-loading query with the tenant predicate on both endpoints and state what it does with a cross-tenant edge.
- Implement iterative Tarjan with an explicit stack and confirm on a three-node cycle that it emits one component of size three.
- Build the transpose restricted to the visited set and mark every node with an in-edge from outside it as refused, carrying the referrer id.
- Run Kahn over the condensation and verify the emitted order against the referrer-before-referenced rule.
- Size the CSR arrays for 2,000,000 nodes and 8,000,000 edges and compare against a boxed adjacency map.
Follow-up
- The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
- The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?
- An edge points at a resource in another tenant. Is that a refusal, an error, or an alert?
Collapse a redelivered event batch into per-aggregate high-water marks
You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.
Approach
- One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
- Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
- Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
- If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
- Reject sorting the batch by (aggregate_id, version) as the default. It is O(n log n) and buys nothing, because max is associative and commutative and needs no ordering; sorting earns its cost only when the downstream consumer must receive the events in order rather than a per-aggregate winner.
- Separate the two mechanisms out loud: in-batch deduplication does not make the consumer idempotent, because the same event redelivered tomorrow arrives in a different batch entirely. The projection write itself still has to be keyed on (aggregate_id, version).
Follow-up
- The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
- How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
- Two events for one aggregate carry the same version with different payloads. Which one is wrong, and how would you find out?
Stop tag and share joins from fanning out a page
resource_tag is (resource_id, tag_id) with PK (resource_id, tag_id); resource_share is (resource_id, shared_with_user_id, permission). The tagged-and-shared listing inner-joins resource to both, filters tenant_id, tag_id = ANY($2) and shared_with_user_id = $3, orders by updated_at DESC and takes 50. Pages come back with fewer than 50 distinct resources and the total in the header is far too high. Explain the row multiplication, rewrite both the page query and the count query so each is correct, and name the index each one needs. PostgreSQL 16.
Approach
- Do the arithmetic against the predicates that are actually there. An inner join emits one row per matching child row, and both joins are filtered: tag_id = ANY($2) admits only the requested tags, shared_with_user_id = $3 admits one user's share rows. So a resource holding three of the requested tags and shared with $3 once yields three rows, not one — the multiplier is its count of matching tags times its share rows for that single user, and that second factor is 1 unless the table admits duplicate (resource_id, shared_with_user_id) pairs. LIMIT 50 then limits rows rather than resources, and COUNT(*) counts pairs — the header is the product, not the population.
- Reject DISTINCT as the fix. It deduplicates after the product has been built, so the planner must materialise and sort the fanned-out set before the LIMIT can apply, and it leaves any SUM or AVG in the same select list wrong.
- Rewrite both filters as semi-joins, keeping resource as the only row source: AND EXISTS (SELECT 1 FROM resource_tag rt WHERE rt.resource_id = r.resource_id AND rt.tag_id = ANY($2)) and the same shape against resource_share. A semi-join stops at the first match per resource and preserves the driving index order, so ORDER BY updated_at DESC, resource_id DESC LIMIT 50 still stops after 50 rows.
- Count with the same predicates and no join at all: SELECT count(*) FROM resource r WHERE r.tenant_id = $1 AND r.status = 'active' AND EXISTS (...) AND EXISTS (...). Nothing multiplies a resource, so the number is the population.
- Attach the tags for display after the page has been cut — LEFT JOIN LATERAL (SELECT array_agg(rt.tag_id) FROM resource_tag rt WHERE rt.resource_id = p.resource_id) ON TRUE over the 50 returned rows. Aggregate over the page, never over the tenant.
- Index both directions and say which query each serves: PK (resource_id, tag_id) serves the lateral lookup, (tag_id, resource_id) serves the EXISTS probe by tag, and resource_share needs (shared_with_user_id, resource_id) for the same reason. An index covering one direction only leaves the other as a scan.
Follow-up
- The filter changes from 'any of these tags' to 'all of these tags'. Rewrite it and state what it costs relative to the ANY form.
- A resource can be shared with the same user twice under different permissions. Does your count change, and should it?
- Where does the correct total come from when the tenant holds 4M resources and the header must not cost 200 ms?
Denormalise tenant onto revisions and backfill it live
resource_revision (revision_id, resource_id, version, actor_user_id, change_kind, patch, request_id, created_at) has 400M rows and no tenant column; tenant_id lives only on resource. Two reads need it: a tenant-scoped audit feed ordered by created_at DESC, and an offboarding purge. Both join back to resource today. Justify adding tenant_id to resource_revision against those two reads, name the anomaly the copy introduces and the constraint that prevents it, then give the ordered migration for a live table taking 1.2k writes/second — the lock each step takes, how the backfill is batched, and where each step stops being reversible. PostgreSQL 16.
Approach
- Justify from the access path rather than from taste. Without the column, the audit feed either scans resource_revision by created_at and discards other tenants' rows, or resolves the tenant's resource_ids first and probes with them — both proportional to the tenant's whole history rather than to one page. With (tenant_id, created_at DESC, revision_id DESC) it is a seek that stops at 50 rows, and the purge becomes a ranged delete instead of a join.
- Name the cost exactly: a second copy of a fact can disagree with the first. Make the disagreement unwritable rather than documented — add UNIQUE (resource_id, tenant_id) on resource so it can serve as a foreign-key target, then FOREIGN KEY (resource_id, tenant_id) REFERENCES resource (resource_id, tenant_id) on the revision table. A revision can then only ever carry its parent's tenant.
- Step one, expand: ALTER TABLE resource_revision ADD COLUMN tenant_id BIGINT NULL, with no default, so it is a catalogue change and no rewrite. It still needs ACCESS EXCLUSIVE for an instant, and that instant queues behind the longest open transaction on the table while every later query queues behind it — set lock_timeout to 2s and retry rather than wait.
- Step two, dual-write: deploy the writer that populates tenant_id on every new revision while reads still use the join. Reversible by redeploying the previous build, because nothing reads the column yet.
- Step three, backfill: batch by primary key rather than by created_at so the cursor is dense and resumable — UPDATE resource_revision rr SET tenant_id = r.tenant_id FROM resource r WHERE r.resource_id = rr.resource_id AND rr.revision_id > $1 AND rr.revision_id <= $1 + 5000 AND rr.tenant_id IS NULL — committing per batch and persisting the cursor. Throttle on replica replay lag and on dead-tuple count, since each batch writes 5,000 new row versions. Run the backfill before the index exists so those updates can stay HOT.
- Step four, index then enforce then contract: CREATE INDEX CONCURRENTLY (cannot run inside a transaction block, scans the table twice, waits on open transactions, and leaves an INVALID index to drop concurrently if it fails); ADD CONSTRAINT ... CHECK (tenant_id IS NOT NULL) NOT VALID, then VALIDATE CONSTRAINT, which takes only SHARE UPDATE EXCLUSIVE, after which SET NOT NULL uses the validated check instead of re-scanning on PostgreSQL 12 and later. Only then move the audit reads onto the column and, in a later deploy, delete the join path.
Worked solution 40 min
- Write the five steps as separate scripts and state, for each, the lock mode it acquires and the deploy it pairs with.
- On a 20M-row copy, run the ADD COLUMN while a 30-second transaction holds a lock on the table, and record how long unrelated queries queue behind it.
- Run the batched backfill at 5,000 rows, kill it mid-run, restart from the persisted cursor, and confirm no row is processed twice and none is skipped.
- Build the index concurrently under concurrent write load, then add the CHECK ... NOT VALID, VALIDATE it and SET NOT NULL, timing each.
- Compare the audit-feed plan before and after: join-and-filter versus an index seek with no Sort.
Follow-up
- The backfill is half finished and a rollback is required. What state is the table in, and what does the previous build do with a half-populated column?
- How do you verify the backfill actually finished, given rows are still being inserted while it runs?
- A resource must now be movable between tenants. What does that do to the composite foreign key and to the revisions already written?
How do you approach test automation or process validation in your curr…
How do you approach test automation or process validation in your current projects?
Approach
- Work from the requirement backwards to the design.
- Say what you would check first and why it is the highest-information step.
- State your assumptions explicitly before working the problem.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
Cache the tenant listing feed with a bounded staleness window
GET /v1/resources returns one tenant's resources ordered by updated_at DESC, 20 per page, at 14k requests/second peak against a 120 ms p99. The table carries the index (tenant_id, status, updated_at DESC, resource_id DESC) and writes land on the primary at 1.2k/second. Design the read path: the pagination contract, the cache key and value, what a write invalidates, and the staleness a user can observe. State the request rate that actually reaches the database, and the one repopulation race that deleting on write does not close.
Approach
- Settle the pagination contract first, because it decides what is cacheable. OFFSET makes the database produce and discard the skipped rows, so page 500 costs five hundred pages of work, and rows inserted between two fetches shift across the boundary and are skipped or repeated with nothing in the response to reveal it. The cursor is the row value of the last row returned: WHERE tenant_id = $1 AND status = $2 AND (updated_at, resource_id) < ($3, $4) ORDER BY updated_at DESC, resource_id DESC LIMIT 21. That is a row-value comparison, not updated_at < $3 AND resource_id < $4, which is a different and wrong predicate.
- Confirm the index actually serves it: equality on the two leading columns, then a range on the pair that follows in exactly the index's sort order, so the plan is an index scan that touches 21 entries with no sort node. Requesting 21 to return 20 is how has_more is answered without a count. resource_id is not decoration - updated_at is not unique, and without the tie-break two rows sharing a timestamp at a page boundary are the skip that keyset pagination was adopted to remove.
- Key the cache on every value the predicate reads: tenant_id, status, cursor and page size. A key that omits tenant_id is a cross-tenant disclosure, and no test running against a single tenant's data will show it.
- Be honest that a write does not invalidate one key. An update moves its row to the head of the ordering, so it invalidates the first page and every cursor page whose range spans the row's old and new position, which is not enumerable. Cache the first page per (tenant_id, status) - that is where the traffic is - with a short TTL, invalidate it on write, and serve deep cursor pages uncached from a replica, since each is already a 21-row index scan and they are rare.
- Name the residual race and the real bound. A reader that loaded rows before the write can populate the cache after the invalidation deleted the key, so the delete is not a staleness bound; the TTL is. Choose the TTL as the staleness a listing can tolerate, and jitter expiries so a busy tenant's keys do not all expire together and stampede the replica. Then do the arithmetic: at an 85% hit rate, 14k requests/second is about 2.1k database reads/second across two replicas, and that is the number capacity planning uses.
Worked solution 20 min
- Write the keyset predicate and match it column by column against the index, marking which columns are equality, which is the range, and which satisfies the ORDER BY.
- Compare rows examined for page 1 and page 500 under OFFSET and under keyset, and state both numbers.
- Write the cache key template and the first-page invalidation the write path performs.
- Write the interleaving in which a stale value is written into the cache after the invalidation, and identify what bounds it.
Follow-up
- The tenant writes and immediately lists. What does it see, and what is the smallest change that makes its own write visible without sending all 14k requests/second to the primary?
- A tenant has 4 million resources and a client walks every page nightly. What does that do to the cache hit rate, and should that traffic share this path at all?
- Sort order becomes configurable - by title, by created_at. What happens to the index set and to the cache key space?
Exports duplicate a row range about once a week
Roughly once a week an export writes a file containing a duplicated range of rows. The affected job_run rows show attempt = 1, status = succeeded, one started_at, and a lease_owner naming a different host from the one whose logs show the job starting. Leases last 30 seconds and are heartbeated every 10 from inside the handler; lease_expires_at is computed on the worker and compared against the database's now(). Find the mechanism, and give a fix that holds even if you cannot fix the clocks.
Approach
- Start from the fact that eliminates the obvious answer. attempt = 1 means no retry was recorded, so this is not a re-run after failure; two workers ran the same row concurrently and the takeover path never touched the counter. lease_owner naming a host other than the one that started the job is the same statement from the other side.
- Enumerate the mechanisms that cause a premature takeover, then find the signal that separates them. Either the lease genuinely expired because the heartbeat did not fire, which is what happens when the heartbeat runs on the handler's own thread and the handler makes a long blocking call, or it only appeared expired because two clocks disagree, since lease_expires_at is written from the worker's clock and evaluated against the database's. The discriminator is the distribution: incidents clustered on the longest exports indict the heartbeat, incidents clustered on one host indict skew. Measure both, and measure each host's offset against the database directly.
- Read the reclaim query precisely. In PostgreSQL now() is transaction start time, not statement time, so a reclaimer holding a long transaction compares against an older timestamp than expected; clock_timestamp() is the statement-time function. This is worth ruling in or out before you redesign anything, because it changes which rows look expired.
- Remove the second clock rather than trying to synchronise it. Issue and extend the lease in the database, with lease_expires_at = now() + interval '30 seconds' in both the claim and the heartbeat, so exactly one clock is ever compared and worker skew stops mattering to this predicate.
- Accept that a lease can still expire under a slow worker, because a lease cannot distinguish slow from dead, and fence the work. Carry a monotonically increasing lease generation and make every write the handler performs conditional on still holding it, as UPDATE ... WHERE job_run_id = $1 AND lease_owner = $2 AND lease_generation = $3, so a displaced worker's writes affect zero rows and it aborts instead of duplicating.
- Make the handler's writes idempotent independently of all that: give each exported chunk a natural key of (job_run_id, batch_start) with a unique constraint so a second copy conflicts rather than appends, move the heartbeat off the handler's thread, and increment attempt on takeover so the event is visible in a metric.
Follow-up
- The displaced worker has already streamed half the file to object storage. What makes that side effect safe to repeat?
- You now count takeovers. What alert fires on that counter, and at what threshold?
- What breaks if you simply raise the lease to five minutes?
Four days sample coding, design, fundamentals and the practical rounds at deliberately shallow depth, which is enough to surface the topics you did not know were in scope. That map, rather than a guess made on day one, decides where the last three days go.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Coding, one pass at shallow depth
- Solve one problem from each of six families, an array with two pointers, hash counting, binary search, a tree traversal, a graph traversal and one dynamic program, under a hard twenty-minute cap with no extensions, marking each finished, late, or stalled.
- For every stall, write the exact move you could not make rather than the subject, so the note reads could not turn the recurrence into a loop rather than bad at dynamic programming.
- Fix nothing today. The value of the pass is the unfixed record.
Deliverable: Six timed attempts marked finished, late or stalled, each stall carrying a named blocking move.
Practice prompt ↗Practice prompt ↗Worked solution ↗02Design, one pass at shallow depth
- Spend twenty minutes each on three different shapes, a read-heavy feed, a write-heavy ingest path, and something needing a transaction across two entities, stopping each at requirements, interface and data model.
- After each, write the first question you could not answer, which is usually a number you could not estimate or a failure mode you had no vocabulary for.
- Mark which of the three you would be most relieved not to be asked, and treat that as data rather than as a preference.
Deliverable: Three shallow designs, each with the first unanswerable question written at the bottom.
Practice prompt ↗Practice prompt ↗03Fundamentals and the practical rounds
- Answer eight short questions in writing at four minutes each, covering the material that fills the gaps between the big rounds: what happens between a URL and a rendered page, what an index costs on write, when a process is preferable to a thread, and what conditions a deadlock requires.
- Do one thirty-minute practical task of the kind a take-home compresses: read an unfamiliar two-hundred-line file and write what it does, what you would change, and the one thing you remain unsure of.
- Score every answer fluent, correct but slow, or absent, and keep the absent ones visible.
Deliverable: Eight scored short answers and one written reading of unfamiliar code.
Practice prompt ↗Practice prompt ↗04The rounds that are about you, and the map
- Deliver three behavioural answers aloud against a timer, a conflict, a failure you owned, and a decision made without enough information, marking any that ran past three minutes or contained no number.
- Assemble the map: every marked item from days one to three on a single page, sorted by how likely it is to appear in your loop rather than by how uncomfortable it felt.
- Choose exactly two areas for the remaining three days and write down what you are deliberately abandoning.
Deliverable: A one-page scored map of the whole surface area with two areas chosen and the rest explicitly abandoned.
Practice prompt ↗Practice prompt ↗Worked solution ↗05First chosen area, to the depth you skipped
- Work the higher-ranked area in four focused blocks, choosing items one level above where you stalled rather than repeating what already works.
- After each block write the rule you extracted in one sentence with its precondition attached, since a rule carrying no precondition is exactly what fails under a variation.
- Re-attempt the day-one or day-two item that exposed this area and compare against the original timing.
Deliverable: Four worked blocks, a timed re-attempt against the original, and three one-sentence rules with preconditions.
Practice prompt ↗Practice prompt ↗06Second chosen area, where the gap is coverage rather than speed
- Treat the second area differently from the first. Day five drilled something you could already half-do; this one is usually a topic you had simply never met, so build one worked reference example end to end and keep it, rather than attempting six problems badly.
- Write down the vocabulary you were missing on day two or three, five terms at most, each with the one sentence that makes it usable in an answer rather than the textbook definition.
- Redo the shallow attempt that exposed this area and note whether you now fail later in the problem, because moving the failure point is the realistic gain from a single day and is worth more than a score that did not change.
Deliverable: One worked reference example for the newly covered area, a five-term vocabulary list, and a note on where the failure point moved.
Practice prompt ↗07Reassemble the loop
- Sit two rounds back to back with no gap, ordering them so the area you chose second comes last, because the map was built from rested, isolated attempts and the loop will reach your weaker area when you are already spent.
- Write where the second round suffered from the first, which is normally the point at which structure collapses into narration.
- Reduce the week to one page holding only the rules you can state without reading them.
Deliverable: Mock notes on cross-round carryover plus a one-page card of rules you can recite from memory.
Practice prompt ↗Worked solution ↗Expand any day for tasks and deliverables. Your progress is saved on this device.
Team size, service count and tickets closed say very little. Seniority shows in the decision you owned: what you chose not to build, which constraint you traded away, whose objection you had to resolve before anything could move. A large project where you executed someone else's plan is a small story.
Describe a time you had to implement a process change; what was the te…
Describe a time you had to implement a process change; what was the technical rationale?
Approach
- Name the disagreement and how you resolved it with evidence.
- Pick a story where you made the decision, not one where you watched it.
- Close with what you would do differently, concretely.
Follow-up
- What did you decide not to do, and why?
- How did you know your change caused the improvement?
Explain your experience with design control procedures and regulatory …
Explain your experience with design control procedures and regulatory compliance.
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- What did you decide not to do, and why?
- How did you know your change caused the improvement?
What is your experience with quality management systems or medical dev…
What is your experience with quality management systems or medical device manufacturing standards?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
How do you gather and incorporate customer feedback into your technica…
How do you gather and incorporate customer feedback into your technical designs?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
- 01
Describe a time you had to implement a process change; what was the technical rationale?
- 02
Explain your experience with design control procedures and regulatory compliance.
- 03
What is your experience with quality management systems or medical device manufacturing standards?
- 04
How do you gather and incorporate customer feedback into your technical designs?
Is this an official Hollister interview guide?
No. It is PracHub's own research and practice material for the Software Engineer role at Hollister. Rounds and questions reflect what candidates have reported, not a process Hollister has published, and they change over time. Confirm the current format and scope with your recruiter.
PracHub interview research ↗How long does the interview process typically take?
The process can vary, but it often spans several weeks due to the multiple rounds of interviews required. Stay in contact with your recruiter to manage your expectations throughout the timeline.
PracHub interview research ↗What is the most important thing to emphasize during my interviews?
Emphasize your ability to work cross-functionally and your commitment to quality. Hollister is a mission-driven company, so showing that you care about the impact your work has on patients is a major differentiator.
PracHub interview research ↗Is the technical interview very difficult?
Expect a rigorous technical discussion, but focus on the "why" and "how" of your past work. The interviewers want to see your problem-solving process, not just your ability to memorize facts.
PracHub interview research ↗What is the work environment like?
Hollister operates in a hybrid environment, with a strong emphasis on collaboration. You should be prepared to work effectively both independently and within diverse, cross-functional teams.
PracHub interview research ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01PracHub interview research ↗
PracHub editorial research into this company and role, maintained with this guide. Candidate-reported, not an employer publication.
PracHub page · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
Cross-company practice questions for this role.
PracHub page · Accessed 2026-09-22 - 03PracHub interview preparation framework ↗
The framework the preparation plan follows.
PracHub page · Accessed 2026-09-22