LGS, une société IBM · Software Engineer
Updated · 2026-09-24

LGS, une société IBM Software Engineer
Interview Questions & Guide 2026

THE 60-SECOND BRIEF

This guide covers what a Software Engineer at LGS, une société IBM is expected to do and how to prepare for the interview.

If the seat owns a service boundary, scope your preparation toward failure behaviour rather than topology. Retrying over an at-least-once channel produces duplicates by construction, so a retry policy is only as safe as the idempotency key underneath it.

PracHub has no confirmed round sequence for LGS, une société IBM. Treat the sections below as preparation areas and confirm the format with your recruiter.

Paginate large result sets with keyset cursorsMake every write idempotent under retryChoose indexes from the query's access path

38 min read

Browse Software Engineer questions

See the practice prompts

11Practice promptsAcross five skill areas
3With worked solutionsIncluded in the practice prompts

This guide covers what a Software Engineer at LGS, une société IBM is expected to do and how to prepare for the interview.

01

Preparation focus

editorial

No round sequence has been reported for this company, so work the categories below and confirm the format with your recruiter.

What to demonstrate

  • Breadth across SQL, experimentation and product reasoning
  • Ability to state assumptions before choosing a method

How to prepare

  • Drill the practice exercises below and time yourself
  • Prepare three quantified stories about decisions you drove
PracHub interview preparation framework ↗

PracHub editorial advice for the preparation topics above.

01

Choosing an index from the columns a query mentions rather than from how it filters and orders

A composite B-tree index on (a, b, c) can be seeked only as a left prefix: equality on a, then equality on b, then a range or an ordering on c. A query that filters on b alone cannot seek into it at all and at best gets a full scan of the index; a query that filters a and ranges on b gets no benefit from c, because the index is only sorted by c within a fixed (a, b) pair. The practical consequence is that one index per column is close to useless for multi-predicate queries while a single correctly ordered composite index turns a scan into a lookup. The ordering half is what gets missed: if the index cannot satisfy the ORDER BY, the database must read every matching row and sort before the limit can apply, so a LIMIT 20 over a million matching rows still reads a million rows.

02

Shipping a migration and the code that depends on it as a single change

During any rolling deploy, and for as long as a rollback remains possible, old and new code execute against the same schema at the same time. A migration that drops or renames a column breaks every instance that has not restarted yet, and code that requires a column the migration has not applied breaks every instance that restarted early. The discipline is expand then contract: add the new column nullable, write both shapes, backfill in batches, move reads across once the backfill is verified, and only then stop writing the old shape and drop it - four deploys, usually spread over days. It feels disproportionate until the first rollback, at which point it is the only reason the previous version still runs.

03

Writing code before the input contract is pinned down

Before the first line, state the types, the size bounds, whether duplicates, negatives or an empty input are possible, whether the input is sorted, whether you may mutate it, and what the function returns when nothing matches. Every one of those answers changes the code, and discovering one at minute twenty costs a rewrite you no longer have time for.

04

Reading the constraints as preamble rather than as part of the problem

The bounds are usually there to eliminate the obvious approach: n up to 10^5 makes an O(n^2) scan roughly 10^10 operations, far outside any per-test time budget, and an input larger than memory rules out loading it at all. When a bound is not given, ask for it, then say out loud which approach it kills.

Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.

8 technical prompts3 include a worked solution

Merge partitioned event streams into one ordered feed with bounded lateness

hard
k-way mergewatermarksout-of-order streams

The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.

Approach
  1. Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
  2. Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
  3. Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
  4. Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.
  5. Choose the late-event policy from what the projection is keyed on. The projection upserts on (aggregate_id, aggregate_version) and discards a version it has already applied, so a late event is safe to apply out of order and correctness never depended on the merge at all. Apply it, recompute the affected feed page, and count lateness so the 30-second budget can be re-derived from data rather than folklore.
  6. Say what the merge does not buy: ordering is guaranteed within one aggregate by the log's partitioning, and no watermark makes the cross-aggregate order authoritative. Two events from different aggregates in the same millisecond have no true order, so the feed's order is a presentation choice that must be stable rather than correct.
Follow-up
  • The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
  • The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?
  • One partition is ten minutes behind because its producer is slow. Do you stall the feed or emit without it?

Find overlapping job attempts and peak concurrency from lease records

mediumWorked solution
sweep lineintervalsleases

A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.

Approach
  1. Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
  2. For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
  3. For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
  4. Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
  5. State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
  6. Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.
Worked solution 30 min
  1. Write the interval derivation with the COALESCE and state in one line which of the two end sources is observed and which is assumed.
  2. Write the concurrency sweep: the endpoint tuples, the sort key including the end-before-start tie-break, and the per-job_type counter.
  3. Hand-trace four attempts of one job, two disjoint and two overlapping by three seconds, and confirm the overlap detector fires exactly once.
  4. Add the skew filter as a minimum overlap duration, state the value you chose, and justify it from how the timestamps are written.
EXPECTED RESULTOne global sort by (job_run_id, started_at) driving a running-maximum-end check for overlaps, plus a sweep over 2n endpoints with ends ordered before starts for per-job_type peak concurrency, both O(n log n), with half-open intervals, NULL finished_at falling back to lease_expires_at, and overlaps shorter than the clock-skew bound excluded.
Follow-up
  • A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
  • Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
  • How would you compute both answers incrementally as records arrive rather than in a daily batch?

Track a rolling failure rate per destination for circuit decisions

easy
sliding windowring buffercircuit breaker

The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.

Approach
  1. Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
  2. Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
  3. State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
  4. Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
  5. Expire idle destinations, or memory grows with every destination ever seen rather than with the live set. Hold the rings in a bounded LRU keyed on destination_id and treat a miss as no history, which is the correct default for an endpoint that has been silent for a minute.
  6. Keep the half-open probe out of the window arithmetic. After the circuit opens, one probe per interval decides whether to close it, and folding that single success into a window that still holds a 100 percent failure history would reopen the destination on one data point.
Follow-up
  • The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
  • A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
  • How would you make the window survive a process restart, and is it worth the cost?

For someone who has spent the last few years shipping features and reading other people's code, and who has not solved a timed problem from a blank file in a long time. Five days rebuild the primitives and the patterns that sit on them, working from invariants rather than remembered solutions, and the last two attach that back to the rest of the loop.

Small steps. Visible outcomes.0 / 7 completed
ONE WEEK · YOUR PACE

Prepare, practise & reflect

One practical outcome each day. Spend longer where you need it.

0 / 7 done
01Rebuild the primitives by implementing them
  • Implement a dynamic array with doubling growth and an operation counter, then change the growth rule to add a fixed sixteen slots instead, and time both for n of ten thousand, a hundred thousand and a million. The fixed-increment version resizes n/16 times at O(n) each, so its total work is quadratic; doubling is what makes append amortised constant.
  • Implement a hash map with separate chaining and a load-factor resize, then insert ten thousand keys engineered to land in one bucket and record what happens to lookup time, so that average-case O(1) becomes a claim with a stated precondition rather than a reflex.
  • For dynamic-array append and hash-map insert, write down which cost is amortised rather than worst-case, which single operation pays the whole bill, and what a system with a hard per-operation deadline would have to do instead.

Deliverable: Two working implementations plus a timing table showing the input at which each structure's advertised complexity stops holding.

Practice prompt ↗Practice prompt ↗Worked solution ↗
02Arrays under an invariant: two pointers, sliding window, binary search
  • Solve longest-subarray-with-sum-at-most-K using a sliding window, then run it on an input containing negative numbers and watch it return the wrong answer: extending the window only moves the sum monotonically when every element is non-negative, and that precondition is the whole reason the technique works.
  • Write the binary search that finds the first index satisfying a predicate rather than an exact value, put the loop invariant above the loop in a comment, and verify termination on the two inputs that break careless versions: the empty range, and a range where every element satisfies the predicate.
  • Compute the midpoint as lo + (hi - lo) / 2 and write one line on why the obvious (lo + hi) / 2 is a genuine defect in a fixed-width integer type and a non-issue in a language with arbitrary-precision integers.

Deliverable: Three solved problems, each with its invariant written above the loop, plus one recorded input on which the sliding window is provably wrong.

Practice prompt ↗Practice prompt ↗
03Sorting, heaps, and the greedy argument that has to be proved
  • Solve one top-k problem three ways, by full sort, by a size-k heap, and by quickselect, then write the values of n and k at which each becomes the right choice, along with quickselect's quadratic worst case and why a randomised pivot makes that unlikely rather than impossible.
  • Implement bottom-up heapify and count sift-down steps to confirm it does linear work rather than n log n, because most nodes sit near the bottom of the tree and therefore move only a short distance.
  • Take interval scheduling by earliest finishing time and write the exchange argument out in full: given any optimal schedule, swapping in the earliest-finishing interval keeps it feasible and no smaller. Then construct the weighted variant where that same greedy fails and name what has to replace it.

Deliverable: A three-way top-k comparison with measured crossover points, one written exchange argument, and one counterexample to a greedy rule that looks almost identical.

Practice prompt ↗Practice prompt ↗
04Recursion, memoisation, and the step to a table
  • Take one problem with overlapping subproblems, such as edit distance or coin change, instrument the plain recursion with a call counter to show the blow-up, then add memoisation and re-count.
  • Convert the memoised version to a bottom-up table and state the two properties you relied on: each subproblem's result depends only on its arguments, and the dependencies form a DAG you can enumerate in order.
  • Rewrite one deep recursion with an explicit stack, then find the input length at which the original hits the interpreter's frame limit, which defaults to about a thousand frames in CPython, so you know when the rewrite is required rather than decorative.

Deliverable: One problem in three forms, naive, memoised and tabulated, with call counts for each and the input length at which recursion depth becomes the binding constraint.

Practice prompt ↗Practice prompt ↗Worked solution ↗
05Graphs, where most of the work is choosing the traversal
  • Implement BFS and DFS over one adjacency list, then answer for each which finds a shortest path in an unweighted graph and which you would use to detect a cycle in a directed graph, including why the in-progress versus finished distinction matters for the second.
  • Implement topological sort by in-degree, feed it a graph containing a cycle, and confirm the failure signature is that fewer than V nodes come out rather than an exception, then note that the order it produces is one of several valid ones.
  • Run a shortest-path search on a graph with a single negative edge weight and show the wrong answer, then write the precondition Dijkstra actually needs, non-negative weights, because it finalises a node's distance the first time that node is popped, and name the algorithm you would switch to and its own limit.

Deliverable: A small graph library with BFS, DFS and topological sort, plus two inputs that produce documented wrong answers under the wrong algorithm choice.

Practice prompt ↗
06One day for everything that is not an algorithm
  • Sketch one system only to the depth a coding-heavy loop tends to reach: the endpoints, what the service stores, and the single query pattern that decides the schema. Stop at twenty-five minutes.
  • Prepare the project answer for an interviewer who codes, which means rehearsing the two levels they push to: the specific thing you built, and why you chose that approach over the alternative they will name. Open with a number and be ready to say what it excludes.
  • Prepare the answer to what you would do differently, choosing a real technical mistake with a specific fix rather than a complaint about process or staffing.

Deliverable: One design sketch at endpoint-and-schema depth, plus a project answer rehearsed to two levels of follow-up.

Practice prompt ↗
07Solve out loud, under time
  • Do three timed problems at twenty-five minutes each in a plain editor with no autocomplete and no execution until the end, then tally separately the failures that were syntax and the ones that were approach, because those two numbers call for different fixes.
  • Narrate one solution from the first sentence, stating the approach and its complexity before writing any code, and rehearse the sentence you will use when you realise mid-solution that the approach is wrong.
  • Re-solve from blank the two problems you were slowest on this week and compare the times against the day they first appeared.

Deliverable: A recording of one fully narrated solution and a tally that separates syntax failures from approach failures.

Practice prompt ↗Worked solution ↗

Expand any day for tasks and deliverables. Your progress is saved on this device.

Bring the two or three numbers the story rests on and know how they were collected. A p99 whose timer starts inside your handler excludes the time a request spent queued, so it can sit flat while users wait longer. Give the window, the percentile and what the measurement left out, or drop the number.

Turn a code review disagreement into a decision

easy
code reviewoptimistic concurrencycommunication

A colleague's change updates a row with UPDATE resource SET version = version + 1 WHERE resource_id = $1 AND version = $2 and treats an affected-row count of zero as a successful no-op. You read that as a silently lost update; they think returning 200 is friendlier to clients than returning a conflict. Describe how you have handled a review disagreement of this shape: what goes in the comment, when you leave the thread, and who decides. Then write the comment you would leave here, in under 80 words.

Approach
  1. Sort the disagreement before writing anything. A silently discarded write is a correctness claim about data; the choice between 409 and 412 is taste. Only the first justifies blocking a merge, and saying which one you are doing is most of the value of the comment.
  2. Make the claim reproducible in the comment itself with an interleaving rather than a principle: A reads version 7, B reads version 7, B commits version 8, A's predicate matches zero rows, A is told it succeeded and A's edit is gone.
  3. Offer the alternative with its cost attached: return 409 carrying the current version and the revision that won, so the client can re-read and re-apply. Note that automatic retry is not the fix, because a retry re-reads the winner's state and reapplies an intent formed against data that no longer exists.
  4. Apply an escalation rule you can state: two round trips on the thread, then a call, and the service's owner decides rather than the reviewer. A reviewer who cannot be overruled is a bottleneck with extra steps.
  5. Close in writing wherever the decision lands, so the next reader finds the reasoning in the code or the ticket instead of in a collapsed review thread.
Follow-up
  • Where would you put the test that fails if someone reintroduces the swallowed zero rowcount?
  • The author says clients cannot handle a 409. How do you check whether that is true?
  • How do you handle the same review comment when the author is more senior than you and in a hurry?

Reverse your own decision and price the reversal

medium
reversibilitymeasurementmigrations

Describe a technical decision you made and later reversed. Pick one that cost something: a service you split and merged back, a cache you added and removed, an index you created that pushed the planner onto a worse plan, a projection you rebuilt from scratch. State what you believed when you decided, the measurement that changed your mind, how long the wrong version ran in production, and what the reversal cost in migrations, dual writes, and a deprecation window for callers you did not own.

Approach
  1. State the original rationale without irony, in the version you would still defend given what was known then. If it is not defensible, the story is about carelessness rather than judgement, and a different example serves you better.
  2. Give the measurement that moved with a before and after: the p99 that did not improve, the cache hit rate that sat at 40%, the plan that flipped to a sequential scan once the table passed a size you can name.
  3. Cost the reversal in steps, not adjectives: expand-and-contract deploys, the dual-write window, the callers who had to be notified, the rows already written in the wrong shape that had to be backfilled or abandoned.
  4. Distinguish reversal from rewrite by naming what you kept. Most good reversals preserve the schema or the interface and undo one decision inside it, which is also why they were affordable.
  5. Finish on the process change: the smallest experiment that would have produced the same measurement in a day, and why you did not run it the first time.
Follow-up
  • What in that decision was irreversible, and did you know it was irreversible when you made it?
  • How did you tell the people who had already built on top of the original decision?
  • What do you now measure before committing to a change of this size?

Argue against a design, lose, and commit anyway

medium
disagreementservice boundariesdecision records

Describe a design you argued against and lost. State the failure you predicted as a named mechanism, not a feeling about complexity: two services that would need one transaction, a projection with no rebuild path, a write path with no idempotency key. Say what evidence you brought, what the decision maker weighed instead, and what you did after the decision was made: what you instrumented, what you wrote down, and whether the prediction came true. Five minutes.

Approach
  1. State the prediction in falsifiable form up front: the mechanism, the condition that triggers it, and the observable outcome. A prediction that cannot be checked also cannot be credited to you later.
  2. Show the evidence you had at the time and label each piece honestly as measured, analogous, or intuition. Keeping the intuition is fine; disguising it as data is the thing that erodes your standing in the next argument.
  3. Represent the opposing case at full strength, including the constraint you did not control: a fixed date, a team boundary, or the fact that the decision was cheap to reverse and yours was not.
  4. Make disagree-and-commit concrete. Name the artefact you left behind so the prediction could be settled without you: the alert and its threshold, the counter on the dashboard, the decision note that recorded the trade-off and the condition that would revisit it.
  5. Report the outcome without editing it. If the design held and your predicted mechanism never fired, say so and say what you had mis-weighted, which is more persuasive than a vindication story.
Follow-up
  • What threshold on that alert would have proved you right, and did anyone ever look at it?
  • If the same proposal arrived tomorrow with the same deadline, would you argue it the same way?
  • How did you behave toward the design once it shipped and started failing in a different way than you predicted?
  • 01

    A colleague's change updates a row with UPDATE resource SET version = version + 1 WHERE resource_id = $1 AND version = $2 and treats an affected-row count of zero as a successful no-op. You read that as a silently lost update; they think returning 200 is friendlier to clients than returning a conflict. Describe how you have handled a review disagreement of this shape: what goes in the comment, when you leave the thread, and who decides. Then write the comment you would leave here, in under 80 words.

  • 02

    Describe a technical decision you made and later reversed. Pick one that cost something: a service you split and merged back, a cache you added and removed, an index you created that pushed the planner onto a worse plan, a projection you rebuilt from scratch. State what you believed when you decided, the measurement that changed your mind, how long the wrong version ran in production, and what the reversal cost in migrations, dual writes, and a deprecation window for callers you did not own.

  • 03

    Describe a design you argued against and lost. State the failure you predicted as a named mechanism, not a feeling about complexity: two services that would need one transaction, a projection with no rebuild path, a write path with no idempotency key. Say what evidence you brought, what the decision maker weighed instead, and what you did after the decision was made: what you instrumented, what you wrote down, and whether the prediction came true. Five minutes.

PracHub interview preparation framework ↗
Is this an official LGS, une société IBM interview guide?

No. It is PracHub's own research and practice material for the Software Engineer role at LGS, une société IBM. Rounds and questions reflect what candidates have reported, not a process LGS, une société IBM has published, and they change over time. Confirm the current format and scope with your recruiter.

PracHub interview research ↗
What topics does LGS, une société IBM test in interviews?

LGS, une société IBM interviews most often cover Full-Stack Development,.NET Core /.NET, Angular, Azure Cloud Architecture, and NgRx (Redux for Angular). The exact emphasis depends on the specific role you apply for.

PracHub interview research ↗
Sources & methodology 3 sources ↗

No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.