The Software Engineer role at McElhanney is a vital bridge between complex engineering requirements and the digital solutions that power them. As a firm deeply rooted in professional engineering and geomatics, McElhanney relies on its software talent to develop tools that enhance efficiency, automate data processing, and support large-scale infrastructure projects. You will not just be writing code; you will be solving real-world problems that directly impact the delivery of civil, environmental, and structural projects across Canada.
This position is particularly significant because it requires a balance of technical precision and domain understanding. Whether you are integrating with industry-standard software like Civil 3D or building custom applications to streamline internal workflows, your work will directly influence the productivity of multidisciplinary teams. You can expect an environment that values professional growth and long-term stability, often working alongside P.Engs and project managers who rely on your technical expertise to move the needle on complex project lifecycles.
Initial Screening
reportedThe person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.
What to demonstrate
- Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
- Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
- Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural
How to prepare
- Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
- Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
- Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one
Interview Rounds
reportedYou cannot drill a format you do not know, so put the preparation into material that travels. Three pieces of your own work, each rehearsed until you can take a follow-up you did not anticipate, will carry a conversation or a code walkthrough equally well. Specificity is what separates that from filler. A number needs its definition before it means anything: a p99 is over some window and measured at some hop, and a server-side figure excludes the queueing and network time a client would see. The number you cannot qualify is the one to leave out.
What to demonstrate
- Whether your examples carry detail only someone who did the work would hold, such as what the binding constraint actually was, which alternative you rejected and why it was worse, and what you measured on each side of the change
- Whether a number survives one follow-up, meaning you can say what it was measured over and whether it moved because of your change or merely alongside it
- Whether a failure is described with the specific change that followed it, rather than a lesson stated in general terms
- Whether your part in a team effort is stated accurately, including what other people did
How to prepare
- Write a page on each of three projects covering the constraint, the option you rejected, the measurement before and after, and what went wrong. Cut any line you cannot take a follow-up on, since you are writing the parts you will be pressed on rather than a summary.
- Recover the real figures while you still have access: request volume, data size, latency with its percentile and window, team size, timeline. Note where each came from, whether a dashboard, a design document or memory, and mark the estimates so you can say which they are out loud.
- Take your weakest project story to someone who works in a different area and have them ask why four times in succession. The point where you run out of answer is the part to go and re-read before the round.
Behavioral Discussion
reportedYour first answer is not really what is scored. It buys the follow-up questions, and those decide the round. An interviewer with fifteen minutes takes one thread and pushes on it four or five times, so a story you can only tell at a single level of detail collapses under the third why. That is an argument for fewer stories known deeply rather than one prepared per prompt. Four or five pieces of work you can still explain down to the code you changed and the argument you had about it will cover nearly anything asked in this round.
What to demonstrate
- Whether a story holds as the questioning moves from what you did to why that instead of the alternative, and then to what you would change knowing what you know now
- Whether you can re-cut a project to answer the question actually asked rather than delivering a rehearsed block that answers an adjacent one
- Whether your level of detail is chosen rather than habitual: going down to the schema when the question is about the data model, staying out of it when the question is about the person who disagreed with you
How to prepare
- Pick four projects and write the chain out four levels deep for each: what you did, why that, why not the alternative, and what would have to be true for the alternative to have won. Where you cannot reach the fourth level, you have a placeholder rather than a story
- Have someone ask why three times in a row on a single thread with nothing else added, and mark the point where you start repeating a sentence you already said. That point is where the interviewer stops learning anything
- Build a one-page index instead of an answer bank: the common prompts in this round (disagreement, a failure that was yours, thin requirements, a deadline you missed, work you inherited) mapped to which of your four projects you would use for each, so the choosing is done now rather than while an interviewer waits
Cultural Alignment
reportedAn unlabelled round is first an information problem, and the cheapest information is free. Whoever schedules it can usually tell you how long it runs, who will be in the room and what they work on, whether you will be writing code and in what environment, and whether anything is being sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.
What to demonstrate
- Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
- Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
- Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating
How to prepare
- Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
- Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
- Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes
PracHub editorial advice for the preparation topics above.
Checking a quota with a select and then writing
Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.
Treating a timed-out write as a failed write
A timeout says the response did not arrive, not that the work did not happen; the server may well have committed and then lost the connection. Retrying a non-idempotent create after a timeout is the standard way to end up with two of something, and those duplicates land precisely when the system is already degraded and least able to absorb them. The discipline is to treat a timeout as unknown: either the write carries an idempotency key so the retry is safe by construction, or the client re-reads authoritative state before deciding what to do, and the interface says unknown rather than showing a failure that invites a second click.
Not asking what the system looks like if it dies halfway through
For any multi-step write, say what state remains if the process stops between step two and step three, and what brings it back: a single transaction, a saga with compensating actions, an outbox, or a reconciliation job. Partial failure is routine at any real call volume, so 'that shouldn't happen' is an answer with nothing behind it.
Treating a network call as though it were a local function call
A remote call can be slow, fail, or return after you stopped waiting, so name the timeout, the retry policy, and what the caller sees while the dependency is down. A call with no timeout turns one slow dependency into an exhausted thread or connection pool in every service upstream of it.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Fold a deduplicated usage stream into hourly rollups
You are given one day of usage_event rows, up to 250 million, each carrying event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at and ingested_at. Produce usage_rollup_hourly cells keyed (tenant_id, workspace_id, sku, hour_start) with quantity_sum, event_count and source_max_ingested_at. An event counts once per (tenant_id, idempotency_key). The rollup grain has no environment column, so state your filter. One pass. Give your time and space bounds, and say what the deduplication actually costs in memory.
Approach
- Bucket on
occurred_at, neveringested_at:hour_start = date_trunc('hour', occurred_at at time zone 'UTC'). The two columns answer different questions.occurred_atsays which hour the customer is billed for;ingested_atsays how current the fold is. Using the second for the first makes late data invisible instead of correctable. - The fold is trivial and the deduplication is the entire cost, so price it before designing anything clever. An exact set over
(tenant_id, idempotency_key)at 250M entries, stored as a 16-byte 128-bit hash in an open-addressed table at 0.7 load factor, needs about 357M slots at 16 bytes each, roughly 5.7 GB. The fix is partitioning byhash(tenant_id) % Pso each shard holds 1/P of the set and no tenant's keys straddle shards. - Rule out a Bloom filter as a replacement, in the right direction: a false positive reports 'already seen' for an event never seen, so you drop a real event and lose revenue with no error raised. It is usable only as a negative pre-filter in front of the exact set, where a miss is conclusive and a hit must fall through to the real lookup.
- Accumulate in scaled integers, not binary floating point.
numeric(20,6)admits values below 10^14, so one event scaled to micro-units can reach 10^20, past int64's 9.22 x 10^18; use a 128-bit or arbitrary-precision accumulator unless you first bound the per-event maximum. binary64 represents integers exactly only to 2^53, about 9.01 x 10^15, and cannot represent 0.1 at all, so two runs that sum in different orders disagree. - Carry
source_max_ingested_at = max(ingested_at)over the events folded into each cell, and countevent_countover accepted, post-dedup events. Without that watermark there is no way to prove later what a number did and did not include, which is the first question any reconciliation asks. - State the environment filter explicitly, because the rollup grain cannot record it. A fold that quietly includes
stagingbills non-production traffic; one that quietly excludes it loses a cost signal. Production-only is the billing answer, and either way it belongs in the job name and the output metadata. Complexity: O(n) time, O(distinct dedup keys) space, dominated by the dedup set rather than by the cells.
Follow-up
- A producer retries at 23:59:59 and the retry lands at 00:00:01. The unique index on the daily-partitioned table must include the partition key. What gets double-counted, and what is the smallest change that fixes it?
- The consumer acknowledges its batch before committing the fold. Which failure loses revenue now, and which arrangement duplicates instead?
- What makes a re-run over the same day produce byte-identical rollups?
Hold a tenant to a trailing sixty-second request limit
The gateway must hold each tenant to R requests in any trailing 60 seconds, in aggregate across three regions and every pod, within a budget of under 10 ms added p99. Peak is 30,000 requests/second across 200,000 active tenants, and traffic is heavily skewed toward a handful of them. Give an exact single-process algorithm with its amortised per-request cost and its memory per tenant, then a bounded-memory approximation and the worst-case overshoot it actually admits. Say what the distributed version does when the counter store is unreachable.
Approach
- Exact, single process: a per-tenant deque of request timestamps. On arrival, pop from the front while
front <= now - 60s, then admit if the remaining length is below R and push. Each timestamp is pushed once and popped once, so the cost is O(1) amortised. The O(R) version is the one that re-filters the whole deque on every request. - Quote the memory. R = 1,000 across 200,000 active tenants is up to 2 x 10^8 timestamps at 8 bytes, about 1.6 GB, and that is the worst case rather than the mean, because the long tail of small tenants holds almost nothing. Skew helps you here and hurts you in the sharding decision.
- Bounded alternative, with its real bound stated: a fixed 60-second counter is O(1) memory but admits close to 2R across a 60-second span straddling a boundary. The weighted two-bucket estimate,
prev * (60 - elapsed)/60 + cur, is better on smooth traffic but assumes the previous window's arrivals were uniform; an adversary packing them at the end of that window is undercounted and can still approach 2R. Say that rather than calling it exact. - Token bucket is the usual gateway answer and a different contract: O(1) state per tenant (
tokens,last_refill), a sustained rate, and a deliberate burst allowance equal to the bucket size. Choose it when a burst is acceptable and the log when the limit is contractual. - Distributed: the limit is per tenant in aggregate, so a local bucket of R/N per pod is wrong in both directions under skew. A tenant landing on one pod is throttled at R/N, and a tenant spread evenly across pods exceeds R. The shared check must be a single atomic round trip, one script or one increment-and-compare, never read-then-write, and it must fit inside the 10 ms p99 budget.
- Decide the unavailable case in advance and write it down. Failing open keeps the product up and lets a tenant exceed its limit for the duration; failing closed converts a counter-store outage into a full outage. Most gateways fail open on rate limits and closed on authorisation, and those are two separate decisions made separately.
Follow-up
- One tenant sends 40% of all traffic. What does that do to a single counter key, and what do you shard on instead?
- Quotas rather than rate limits: the check is
select used; if used < limit then insert. Name the isolation level that still permits the overshoot, and the two fixes. - How do you return an accurate
Retry-Afterfrom the exact algorithm without a second scan?
Find peak concurrent sandbox usage from run intervals
Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.
Approach
- Turn each run into two sweep events,
(started_at, +1)and(end, -1), then sort the 2n events by timestamp with-1ordered before+1at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap. - Decide each null out loud before sweeping, because each choice moves the answer. A null
started_atmeans queued and contributes nothing. A nullfinished_atwith statusrunningorleasedis clipped to the window end. Statuslosthas no observed end at all, so clip it atstarted_at + wall_clock_limit_secondson the grounds that the supervisor owns the timeout, and record that you did. The table'scheck (finished_at is null or started_at is not null)guarantees you never see an end without a start. - Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update
peak_atonly on a strict increase, or you will report the last such instant instead of the earliest). Capture the firstrun_idwhose+1takes the counter to C+1 during the same sweep rather than in a second pass. - Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by
started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on(tenant_id, started_at). - If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.
Worked solution 20 min
- Write the null policy as three lines of prose first, one per case, and keep them beside the output.
- Emit 2n endpoint tuples
(timestamp, delta, run_id)and sort on the key(timestamp, delta)so-1precedes+1. - Sweep, tracking
cur,peak,peak_atupdated only on a strict increase, and the firstrun_idwhose+1takescurto C+1. - Build a fixture with two runs where one ends exactly when the next starts, three genuinely overlapping runs, one run with a null
finished_atand statusrunning, and one with statuslostand a 300-secondwall_clock_limit_seconds. - Re-run with every timestamp shifted by a constant and confirm the peak is unchanged while
peak_atshifts by the same constant.
Follow-up
- Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
- The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
- How would you answer 'peak concurrency within any 5-minute window' without re-sorting?
Migrate a live partitioned event table without blocking ingest
usage_event is range-partitioned daily on ingested_at, holds roughly 250M rows per day across 400 live partitions, and is written at 10-40k rows/second. Two changes are required: quantity must move from double precision to numeric(20,6), and a new environment column must become NOT NULL with a default of 'production'. Ingest cannot stop. Give the ordered plan, naming for each step the lock it takes, what that lock blocks, and roughly how long it is held. Identify the one step that cannot be rolled back cleanly once traffic depends on it.
Approach
- Classify the two changes before planning anything. Adding a column with a non-volatile default has been metadata-only since PostgreSQL 11, so it is cheap. Changing double precision to numeric is not binary-coercible, so
alter column ... typerewrites every partition under ACCESS EXCLUSIVE and rebuilds its indexes; on this volume that is hours of blocked ingest and is simply not an option, which is why the plan is expand-and-contract rather than one statement. - Expand: add
quantity_numeric numeric(20,6)andenvironmentwith its default on the parent. Both are catalogue-only but both take a brief ACCESS EXCLUSIVE that cascades to partitions, so run each withlock_timeoutset to a second or two and retry on failure. A queued ACCESS EXCLUSIVE request blocks every reader behind it, which is how a metadata-only change turns into an outage. - Dual-write: deploy producer code that populates both columns on every insert, and leave it running before anything reads the new column. This is the step that cannot be reverted cleanly. Once readers depend on quantity_numeric, reverting the writer leaves rows with a null there, and the gap is only discoverable by re-reading the old column, which the readers have stopped doing.
- Backfill older partitions in batches keyed on the primary key, oldest first, committing every few thousand rows with a pause between batches, and skipping the partition still receiving writes until it rotates. Each batch is an ordinary UPDATE taking row locks only. The cost is bloat and WAL rather than blocking, so watch dead tuples and let autovacuum keep pace instead of wrapping 400 partitions in one transaction.
- Make NOT NULL cheap with the three-step form:
add constraint ... check (environment is not null) not valid(brief ACCESS EXCLUSIVE, no scan), thenvalidate constraint(SHARE UPDATE EXCLUSIVE, scans while reads and writes continue), thenset not null, which from PostgreSQL 12 uses the validated check and skips its own full scan. Do this per partition, then on the parent. - Switch and contract: move reads to the new column behind a flag, verify over a full period that both columns agree on freshly written rows, drop the old column (metadata-only), and only then remove the dual-write. Any index on the new column goes on with CREATE INDEX CONCURRENTLY per partition, since CIC is not supported on a partitioned parent: create the parent index with ONLY, build each child concurrently, then ALTER INDEX ... ATTACH PARTITION until the parent index becomes valid.
Follow-up
- A CREATE INDEX CONCURRENTLY fails halfway through the partition list. What state is the table in, how do you detect it, and what do you run?
- The producer computes quantity itself. What happens to a request already in flight when the dual-write deploy lands, and does it matter?
- Give two queries that prove the backfill is complete: one cheap enough to run every minute, one authoritative.
Find the join that inflates every invoice total
invoice_line_item holds line_id, invoice_id, tenant_id, sku, rate_tier, quantity, unit_price_micros, amount_minor (bigint), currency, kind, voided_at. invoice_payment_attempt holds attempt_id, invoice_id, tenant_id, amount_minor, status (succeeded, failed, pending), created_at, and an invoice has many attempts. A finance report runs select i.invoice_id, sum(l.amount_minor), count(p.attempt_id) from invoice i join invoice_line_item l using (invoice_id) join invoice_payment_attempt p using (invoice_id) group by 1 and the totals are wrong. Say precisely what the sum now equals, and write a version that is also correct for invoices with zero attempts.
Approach
- Compute what the query actually returns before fixing it. The two joins form a Cartesian product per invoice, so each line row repeats once per attempt row:
sum(l.amount_minor)is the true total multiplied by the attempt count, andcount(p.attempt_id)is attempts times lines. Three lines and two attempts report double the money and six attempts. - Reject the reflex repair.
count(distinct p.attempt_id)does fix the count, because attempt_id is unique.sum(distinct l.amount_minor)does not fix the sum, because two legitimate lines with equal amounts collapse into one. DISTINCT inside an aggregate deduplicates values, not rows, and the difference stays invisible until two lines happen to match. - Aggregate each branch to invoice grain before joining: one CTE summing lines by invoice_id, one counting attempts by invoice_id, then join the two results. A LATERAL subquery per invoice is equivalent and sometimes plans better when the outer set is small. Either way every aggregate stays at the grain it was defined at.
- Keep invoices with no attempts by making the attempt branch a LEFT JOIN with
coalesce(attempt_count, 0). An inner join here silently drops every unpaid invoice, which is usually the exact population finance is asking about. - Push each filter to its own grain:
where l.voided_at is nullbelongs inside the line CTE, not the outer query, or it would also filter the attempt branch through the join. Put the tenant predicate on both branches, since the denormalised tenant_id is what stops a wrong join crossing tenants. - Leave yourself a standing check: an invoice total is a function of its non-voided lines and of nothing about payments, so if changing the payment filter moves the money figure, the fan-out is back.
Worked solution 25 min
- Create one invoice with three lines of 1000, 1000 and 500 minor units and two payment attempts, then run the original query.
- Confirm it reports 5000 and 6 rather than 2500 and 2.
- Apply
sum(distinct l.amount_minor)and confirm the total becomes 1500, which is worse rather than better. - Write the two-CTE version with a LEFT JOIN and coalesce, and confirm 2500 and 2.
- Add a second invoice with lines and no attempts and confirm it still appears.
Follow-up
- Add a third branch for credit notes applied to the invoice. Does the CTE shape still hold, and when would a single pass with
filter (where ...)be better? - Over 500k invoices this report takes minutes. Which grain would you materialise, and how do you keep it correct when a line is voided?
- The same report is needed per tenant per month. What index makes the line CTE cheap?
Generally, tell us about your technical background and work experience…
Generally, tell us about your technical background and work experience.
Approach
- Say what you would check first and why it is the highest-information step.
- State your assumptions explicitly before working the problem.
- Clarify what is being asked and what a complete answer contains.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Tell us about a difficult or stressful situation and how you dealt wit…
Tell us about a difficult or stressful situation and how you dealt with it.
Approach
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Clarify what is being asked and what a complete answer contains.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
Write the delivery guarantee and replay API for outbound events
The webhook-delivery service fans events to customer endpoints, tracked in webhook_delivery (subscription_id, tenant_id, event_id, redelivery_seq, status, attempt_count, next_attempt_at, lease_token, last_response_code, payload_digest). Customers are asking for exactly-once and in-order delivery. Write the contract you can actually honour: the guarantee, the headers that make it usable, which customer response codes are retryable, the retry schedule and terminal condition, what happens to an endpoint that has been down for a day, and the shape of the redelivery endpoint. State plainly what you are not promising and what the customer must do instead.
Approach
- Refuse exactly-once with the mechanism rather than with policy: the customer's acknowledgement can be lost after they have already committed, so the sender cannot distinguish unprocessed from processed-but-unacknowledged and must retry. The deliverable is at-least-once with a stable event identifier and the customer documented as the deduplicating party.
- Price ordering instead of promising it. With parallel attempts per subscription, a retried event overtakes a newer one, so in-order delivery requires a single in-flight attempt per subscription, which turns any slow endpoint into head-of-line blocking for that subscription's whole queue. Offer it per subscription with that cost written down.
- Define the response contract from the customer's side: 2xx is accepted, 408, 429 and 5xx are retryable, 410 disables the subscription, and every other 4xx is permanent and terminal. Publish the read timeout and tell the customer to acknowledge first and process asynchronously, since their processing time otherwise consumes your worker occupancy.
- Publish the schedule and its end: capped exponential backoff with full jitter, sleeping uniformly in [0, min(cap, base * 2^attempt)] so a mass failure does not re-synchronise the herd, terminal after a stated attempt count or age, plus a per-endpoint circuit breaker that records further deliveries as dropped_circuit_open and notifies the owner rather than burning shared worker capacity.
- Shape redelivery as an insert, not a reset: POST to a redeliveries collection with event ids or a time window creates rows at redelivery_seq + 1 carrying the same bytes, which payload_digest lets you prove, leaving the original terminal rows intact as the record of what happened.
- Compare the event's tenant against the subscription's tenant at enqueue and again immediately before signing, because cross-tenant delivery originates in an enqueue path that took the subscription from one lookup and the payload from another, not in the worker.
Worked solution 30 min
- Write the guarantee sentence and the one-sentence reason exactly-once is not available over HTTP.
- List the headers a customer needs to build their own dedup table: event id, delivery id, attempt number, subscription id, signature and timestamp.
- Write the response-code table with four classes and the action for each, including the 410 case.
- Write the retry schedule with concrete numbers, the terminal condition, and the breaker's threshold and its effect on the delivery row's status.
- Specify the redelivery request and response, and say which columns change and which do not.
Follow-up
- A customer wants everything they missed during their six-hour outage. Do the dropped_circuit_open rows let you answer that, and what retention bound does the answer depend on?
- You offer the ordered mode and one customer's endpoint slows to two seconds per request. What do their delivery metrics look like, and what do you owe them in the docs?
Webhook workers leak until OOM and drop in-flight deliveries
webhook-delivery workers grow from 400 MB to a 2 GB limit over about 36 hours, are OOM-killed, restart, and repeat. Each restart abandons in-flight attempts, so webhook_delivery rows sit in in_flight until their leases expire and the backlog spikes. The live set measured after a forced full collection also grows. The fleet serves tens of thousands of subscriptions, several thousand of which have been failing for weeks. Give an ordered checklist, the measurement separating retention from fragmentation, and the fix.
Approach
- Separate the two failure shapes with one measurement: track resident set size against the live set after a forced full collection. A live set that climbs monotonically is retention; a flat live set under a rising RSS is fragmentation, off-heap or native allocation, or an allocator that never returns pages. The stated symptom puts this in the first category, which rules out allocator tuning as a fix.
- Characterise the curve rather than the total. Growth linear in uptime implies an unbounded structure keyed by something that keeps arriving; step growth implies buffering a large object. Correlate the slope against event rate and separately against the count of distinct subscriptions seen, because those two diverge and only one of them will fit.
- Diff two heap snapshots an hour apart by retained size grouped by dominant root, not by allocation count, which is dominated by short-lived objects and will point at the wrong thing.
- Expect a per-subscription map with no eviction: circuit-breaker or backoff state created on first failure and never removed, so the retained set grows with endpoints that have ever failed, and the several thousand permanently dead endpoints hold theirs forever.
- Fix in two places. Bound the in-memory structure with a size-capped LRU or a TTL keyed on last use, and move state that must survive a restart onto the subscription or webhook_delivery row, since the worker holding it in memory is exactly why a restart loses it.
- Repair the second-order damage separately, because it will outlive the leak: workers claim by compare-and-set with leased_until, so a bounded lease returns in_flight rows to pending on a known schedule, and a graceful shutdown releases leases instead of waiting them out.
Follow-up
- The backlog spike after a restart is itself a thundering herd against customer endpoints. What stops the recovery from becoming a second incident?
- Suppose the live set had been flat while RSS still climbed. Name two causes and the measurement that separates them.
- How would you size the LRU, and what does a miss on an evicted circuit-breaker entry cost a customer whose endpoint is down?
Day one measures instead of guessing, under a fixed rubric, and the remaining hours are allocated in proportion to the gaps before any studying begins. The allocation is deliberately not renegotiated midweek, because the area that feels worst on day three is usually the one that is moving.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Diagnostic, scored before you study anything
- Sit a 110-minute diagnostic in four blocks: forty-five minutes on two coding problems, twenty-five on one design prompt taken to interface and data model, twenty of short-answer fundamentals, and twenty delivering two behavioural answers aloud.
- Score each block from 0 to 3 on a fixed rubric where 3 is correct and fluent, 2 is correct but slow or prompted, 1 is partially correct and 0 is stuck, grading the artifact rather than how the attempt felt.
- Allocate days two to five in proportion to 3 minus each block's score, write the allocation down, and commit to leaving it alone.
Deliverable: A scored rubric and a fixed hour allocation for the rest of the week.
Practice prompt ↗Practice prompt ↗Worked solution ↗02Largest gap: find the boundary rather than the subject
- Split the weakest area into named sub-skills and rate each separately. For coding those are restating the problem, choosing the structure, stating the invariant, turning the invariant into loop bounds, handling empty and single-element input, and accounting for complexity out loud.
- Attempt three items positioned just above where the rating drops off, and for each write the first move you failed to make.
- Re-attempt one of them from blank four hours later with nothing open.
Deliverable: A sub-skill map with the two blocking sub-skills circled.
Practice prompt ↗Practice prompt ↗03Drill the blocking sub-skill by repeating the shape
- Do eight short repetitions of the same shape rather than eight different problems, so what gets practised is the pattern and not the puzzle.
- State the rule you now hold in one sentence, then test it against a case built to break it, a sliding window over an array containing negative values, or a cache-aside read path whose invalidation message is dropped.
- Have someone else read your one-sentence rule and find the precondition you left out.
Deliverable: One rule statement with its preconditions attached and one counterexample that would have caught the incomplete version.
Practice prompt ↗Practice prompt ↗04Second gap, plus maintenance on the strongest area
- Run the same sub-skill decomposition on the second-largest gap in half the time.
- Spend twenty-five timed minutes on the block you scored highest, choosing the hardest item you can still finish rather than a warm-up.
- Write whether each area fails you on recall, on setup, or on execution, and set the fix accordingly: repetition for recall, a written checklist for setup, timed work for execution.
Deliverable: A second sub-skill map plus a one-line failure diagnosis for each area.
Practice prompt ↗Practice prompt ↗Worked solution ↗05The gap that is not a skill
- Record one technical and one behavioural answer, then count two things in the playback: seconds before your first clarifying question, and sentences you began without knowing where they would end.
- Practise saying that you do not know, followed by how you would find out, without letting it soften into a guess, and practise stating a complexity or an estimate before being asked for it.
- Redeliver one answer under a hard ninety-second cap, which forces structure ahead of detail.
Deliverable: Two recordings with a counted reduction in time-to-first-question.
Practice prompt ↗Practice prompt ↗06Retest under day-one conditions
- Sit the same 110-minute structure with new prompts of comparable difficulty and score it on the identical rubric.
- For any block that did not move, change the method rather than adding hours: a block stuck at 1 usually means the practice was too varied, not too short.
- Write down which single block you would still lose the offer on.
Deliverable: A second scored rubric placed beside the first, with one named remaining risk.
Practice prompt ↗Practice prompt ↗07Full loop under interview conditions
- Run a sixty-minute mock over the two blocks that moved least, with an interviewer briefed to interrupt and change direction mid-answer.
- Write the recovery script for going blank: restate the question, state your assumption, name the first thing you would check.
- Say every rule from the week aloud without reading it, and cut any you cannot state in a single sentence, since a rule you have to reconstruct mid-answer will not survive an interruption.
Deliverable: A one-page card holding the recovery script and only the rules you could state from memory.
Practice prompt ↗Worked solution ↗Expand any day for tasks and deliverables. Your progress is saved on this device.
Conflict answers where you were right and everyone came round are the weakest ones. Stronger: the evidence you went and collected, what would have changed your mind, and what you did in the weeks after the call went against you. Implementing a design you argued against, properly, is a specific and checkable behaviour.
Where do you see yourself in five years?
Where do you see yourself in five years?
Approach
- Give the blast radius: what could have broken, and what you measured.
- Close with what you would do differently, concretely.
- Pick a story where you made the decision, not one where you watched it.
Follow-up
- What would you do differently if you ran that again?
- What did you decide not to do, and why?
What was your experience with Civil 3D?
What was your experience with Civil 3D?
Approach
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What did you decide not to do, and why?
- What would you do differently if you ran that again?
What are your expectations for an employer?
What are your expectations for an employer?
Approach
- Give the blast radius: what could have broken, and what you measured.
- Pick a story where you made the decision, not one where you watched it.
- Close with what you would do differently, concretely.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
What is your experience in your current job?
What is your experience in your current job?
Approach
- Pick a story where you made the decision, not one where you watched it.
- Name the disagreement and how you resolved it with evidence.
- Close with what you would do differently, concretely.
Follow-up
- How did you know your change caused the improvement?
- What did you decide not to do, and why?
- 01
Where do you see yourself in five years?
- 02
What was your experience with Civil 3D?
- 03
What are your expectations for an employer?
- 04
What is your experience in your current job?
Is this an official McElhanney interview guide?
No. It is PracHub's own research and practice material for the Software Engineer role at McElhanney. Rounds and questions reflect what candidates have reported, not a process McElhanney has published, and they change over time. Confirm the current format and scope with your recruiter.
PracHub interview research ↗How technical are the interviews?
The interviews are generally more behavioral and experience-focused than strictly academic or algorithmic. Expect to discuss your past projects in depth rather than solving abstract coding puzzles.
PracHub interview research ↗What is the company culture like?
McElhanney is known for a professional and collaborative atmosphere. They value stability and long-term professional development for their employees.
PracHub interview research ↗How long does the process take?
While it varies, the process typically moves from an initial screen to 1–2 rounds of interviews. It is generally described as efficient and well-coordinated.
PracHub interview research ↗Is there any remote work flexibility?
Many roles, especially for senior positions, are listed as remote-friendly, but confirm this during your initial HR screen as it may depend on the specific branch or team.
PracHub interview research ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01PracHub interview research ↗
PracHub editorial research into this company and role, maintained with this guide. Candidate-reported, not an employer publication.
PracHub page · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
Cross-company practice questions for this role.
PracHub page · Accessed 2026-09-22 - 03PracHub interview preparation framework ↗
The framework the preparation plan follows.
PracHub page · Accessed 2026-09-22
