As a Software Engineer at Merak, you are at the intersection of high-precision engineering and mission-critical rail infrastructure. Merak is the global market leader in Rail HVAC, and your work ensures that millions of passengers experience comfort, health, and safety while traveling. This role is not just about writing code; it is about managing the entire lifecycle of software projects within complex HVAC systems, from requirement definition to final system validation. You will contribute to a sophisticated technical ecosystem, working on everything from low-level drivers and microcontrollers to high-level system monitoring using LabVIEW and C#. Whether you are optimizing inverter control software or implementing cybersecurity measures for rail hardware, your impact is tangible. You will serve as a technical bridge, collaborating with internal teams and acting as a direct liaison for customer demands, ensuring that our solutions meet both performance standards and rigorous energy-efficiency goals. 02 · Compensation
Preparation focus
editorialNo round sequence has been reported for this company, so confirm the format with your recruiter and work the reported questions below.
What to demonstrate
- Breadth across the topics this company reports testing
- Whether you confirm the format before preparing for it
How to prepare
- Ask the recruiter for the sequence, the duration of each stage and whether you will be writing code
- Work the reported questions below and time yourself
PracHub editorial advice for the preparation topics above.
Focus on the "Why
When describing your experience, explain why you chose a specific architecture or language, not just what you did.
Prepare for Ambiguity
Many of our projects involve evolving requirements; show us how you stay flexible and organized when project scopes shift.
Highlight Safety
In the rail industry, safety is paramount. Always mention how your design choices contribute to the reliability and safety of the final product.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Archive a resource graph without breaking live references or recursing
Resources reference other resources within a tenant; for the largest tenant the reference table holds up to 2,000,000 nodes and 8,000,000 edges. Archiving a resource must archive everything reachable from it that nothing outside the set still references, refuse when a live external referrer exists, and terminate when references form cycles, which they legitimately do. Produce the archive order and the refusal list, targeting O(V+E). Say what stops the traversal crossing a tenant boundary, and why recursion is the wrong control structure at this size.
Approach
- Load the subgraph with the tenant predicate on both endpoints of the edge, not only on the side you started from. Scoping the left table alone is the classic cross-tenant leak: one mis-entered edge then pulls another tenant's resources into the traversal and, worse, into the archive.
- Traverse iteratively with an explicit stack. A 2,000,000-node graph can hold a chain deep enough to exhaust a native stack in the low tens of thousands of frames, and that failure is a process crash rather than an error you can return.
- Treat cycles as data rather than corruption: compute strongly connected components with Tarjan in O(V+E) using its own explicit stack, then condense. The condensation is a DAG, so a topological order over it gives the archive order, and every member of a component archives in one transaction because no order within a cycle is valid.
- Decide refusals with reverse edges. A candidate is archivable only if every in-edge originates inside the candidate set, so build the transpose or count in-degrees restricted to the visited set, and emit each blocked resource with the id of the external referrer, which is the only part of the answer an operator can act on.
Follow-up
- The graph is read in one query and the archive writes a minute later. What can change in between, and how do you make the write safe?
- The candidate set is 400,000 resources. Is that one transaction, and if not, what does a half-finished archive look like to a reader?
Find overlapping job attempts and peak concurrency from lease records
A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.
Approach
- Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
- For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
- For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
- Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
Follow-up
- A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
- Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
Identify the heaviest tenants in a five-minute window under memory pressure
The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.
Approach
- Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
- Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
- State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
- Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
Follow-up
- The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
- Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
Denormalise tenant onto revisions and backfill it live
resource_revision (revision_id, resource_id, version, actor_user_id, change_kind, patch, request_id, created_at) has 400M rows and no tenant column; tenant_id lives only on resource. Two reads need it: a tenant-scoped audit feed ordered by created_at DESC, and an offboarding purge. Both join back to resource today. Justify adding tenant_id to resource_revision against those two reads, name the anomaly the copy introduces and the constraint that prevents it, then give the ordered migration for a live table taking 1.2k writes/second — the lock each step takes, how the backfill is batched, and where each step stops being reversible. PostgreSQL 16.
Approach
- Justify from the access path rather than from taste. Without the column, the audit feed either scans resource_revision by created_at and discards other tenants' rows, or resolves the tenant's resource_ids first and probes with them — both proportional to the tenant's whole history rather than to one page. With (tenant_id, created_at DESC, revision_id DESC) it is a seek that stops at 50 rows, and the purge becomes a ranged delete instead of a join.
- Name the cost exactly: a second copy of a fact can disagree with the first. Make the disagreement unwritable rather than documented — add UNIQUE (resource_id, tenant_id) on resource so it can serve as a foreign-key target, then FOREIGN KEY (resource_id, tenant_id) REFERENCES resource (resource_id, tenant_id) on the revision table. A revision can then only ever carry its parent's tenant.
- Step one, expand: ALTER TABLE resource_revision ADD COLUMN tenant_id BIGINT NULL, with no default, so it is a catalogue change and no rewrite. It still needs ACCESS EXCLUSIVE for an instant, and that instant queues behind the longest open transaction on the table while every later query queues behind it — set lock_timeout to 2s and retry rather than wait.
- Step two, dual-write: deploy the writer that populates tenant_id on every new revision while reads still use the join. Reversible by redeploying the previous build, because nothing reads the column yet.
Follow-up
- The backfill is half finished and a rollback is required. What state is the table in, and what does the previous build do with a half-populated column?
- How do you verify the backfill actually finished, given rows are still being inserted while it runs?
Stop tag and share joins from fanning out a page
resource_tag is (resource_id, tag_id) with PK (resource_id, tag_id); resource_share is (resource_id, shared_with_user_id, permission). The tagged-and-shared listing inner-joins resource to both, filters tenant_id, tag_id = ANY($2) and shared_with_user_id = $3, orders by updated_at DESC and takes 50. Pages come back with fewer than 50 distinct resources and the total in the header is far too high. Explain the row multiplication, rewrite both the page query and the count query so each is correct, and name the index each one needs. PostgreSQL 16.
Approach
- Do the arithmetic against the predicates that are actually there. An inner join emits one row per matching child row, and both joins are filtered: tag_id = ANY($2) admits only the requested tags, shared_with_user_id = $3 admits one user's share rows. So a resource holding three of the requested tags and shared with $3 once yields three rows, not one — the multiplier is its count of matching tags times its share rows for that single user, and that second factor is 1 unless the table admits duplicate (resource_id, shared_with_user_id) pairs. LIMIT 50 then limits rows rather than resources, and COUNT(*) counts pairs — the header is the product, not the population.
- Reject DISTINCT as the fix. It deduplicates after the product has been built, so the planner must materialise and sort the fanned-out set before the LIMIT can apply, and it leaves any SUM or AVG in the same select list wrong.
- Rewrite both filters as semi-joins, keeping resource as the only row source: AND EXISTS (SELECT 1 FROM resource_tag rt WHERE rt.resource_id = r.resource_id AND rt.tag_id = ANY($2)) and the same shape against resource_share. A semi-join stops at the first match per resource and preserves the driving index order, so ORDER BY updated_at DESC, resource_id DESC LIMIT 50 still stops after 50 rows.
- Count with the same predicates and no join at all: SELECT count(*) FROM resource r WHERE r.tenant_id = $1 AND r.status = 'active' AND EXISTS (...) AND EXISTS (...). Nothing multiplies a resource, so the number is the population.
Follow-up
- The filter changes from 'any of these tags' to 'all of these tags'. Rewrite it and state what it costs relative to the ANY form.
- A resource can be shared with the same user twice under different permissions. Does your count change, and should it?
How do you approach the development of low-level software for microcontrollers?
How do you approach the development of low-level software for microcontrollers?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
How do you ensure cybersecurity compliance when designing software for industrial hardware?
How do you ensure cybersecurity compliance when designing software for industrial hardware?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
What are the key considerations when writing software for safety-critical rail environments?
What are the key considerations when writing software for safety-critical rail environments?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Explain your process for debugging integration issues between software and power converters.
Explain your process for debugging integration issues between software and power converters.
Approach
- Establish what changed and when, before forming any theory.
- Pick a bisection that eliminates candidates whichever way it turns out.
- Check the instrumentation before believing the symptom.
- Separate the trigger from the cause; the deploy is rarely the bug.
Follow-up
- What would you look at first, and what would it rule out?
- How would you tell a cause from a coincidence here?
Built from the topics and questions Merak candidates report; no round sequence has been reported.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Establish the Merak format
- No round sequence has been reported, so ask your recruiter for the sequence, the duration of each stage and whether you will write code.
Deliverable: A written reply from your recruiter confirming the format.
02Work HVAC Systems
- Spend the session on HVAC Systems, which Merak candidates report being tested on.
- Write one worked example in HVAC Systems and time yourself on it.
Deliverable: One timed worked example in HVAC Systems.
03Work Requirements Management
- Spend the session on Requirements Management, which Merak candidates report being tested on.
- Write one worked example in Requirements Management and time yourself on it.
Deliverable: One timed worked example in Requirements Management.
04Work Software/Hardware Integration Testing
- Spend the session on Software/Hardware Integration Testing, which Merak candidates report being tested on.
- Write one worked example in Software/Hardware Integration Testing and time yourself on it.
Deliverable: One timed worked example in Software/Hardware Integration Testing.
05Answer out loud: Technical & Domain Expertise
- Answer aloud, timed: How do you approach the development of low-level software for microcontrollers?
- Answer aloud, timed: Describe your experience with communication protocols in real-time embedded systems.
Deliverable: Spoken answers to 2 reported Technical & Domain Expertise question(s), under time.
06Rehearse your own examples
- Prepare three examples from your own work where you made the decision, each with the outcome you can quantify.
Deliverable: Three examples written out, each with a number attached.
07Dry run for Merak
- Run one full mock under time, then write down the two questions you most want to ask your interviewers.
Deliverable: A completed timed mock and two questions to ask.
Expand any day for tasks and deliverables. Your progress is saved on this device.
Behavioural rounds judge the decision you made and what it cost.
Describe your experience with communication protocols in real-time embedded systems.
Describe your experience with communication protocols in real-time embedded systems.
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Turn a code review disagreement into a decision
A colleague's change updates a row with UPDATE resource SET version = version + 1 WHERE resource_id = $1 AND version = $2 and treats an affected-row count of zero as a successful no-op. You read that as a silently lost update; they think returning 200 is friendlier to clients than returning a conflict. Describe how you have handled a review disagreement of this shape: what goes in the comment, when you leave the thread, and who decides. Then write the comment you would leave here, in under 80 words.
Approach
- Sort the disagreement before writing anything. A silently discarded write is a correctness claim about data; the choice between 409 and 412 is taste. Only the first justifies blocking a merge, and saying which one you are doing is most of the value of the comment.
- Make the claim reproducible in the comment itself with an interleaving rather than a principle: A reads version 7, B reads version 7, B commits version 8, A's predicate matches zero rows, A is told it succeeded and A's edit is gone.
- Offer the alternative with its cost attached: return 409 carrying the current version and the revision that won, so the client can re-read and re-apply. Note that automatic retry is not the fix, because a retry re-reads the winner's state and reapplies an intent formed against data that no longer exists.
- Apply an escalation rule you can state: two round trips on the thread, then a call, and the service's owner decides rather than the reviewer. A reviewer who cannot be overruled is a bottleneck with extra steps.
Follow-up
- Where would you put the test that fails if someone reintroduces the swallowed zero rowcount?
- The author says clients cannot handle a 409. How do you check whether that is true?
Reverse your own decision and price the reversal
Describe a technical decision you made and later reversed. Pick one that cost something: a service you split and merged back, a cache you added and removed, an index you created that pushed the planner onto a worse plan, a projection you rebuilt from scratch. State what you believed when you decided, the measurement that changed your mind, how long the wrong version ran in production, and what the reversal cost in migrations, dual writes, and a deprecation window for callers you did not own.
Approach
- State the original rationale without irony, in the version you would still defend given what was known then. If it is not defensible, the story is about carelessness rather than judgement, and a different example serves you better.
- Give the measurement that moved with a before and after: the p99 that did not improve, the cache hit rate that sat at 40%, the plan that flipped to a sequential scan once the table passed a size you can name.
- Cost the reversal in steps, not adjectives: expand-and-contract deploys, the dual-write window, the callers who had to be notified, the rows already written in the wrong shape that had to be backfilled or abandoned.
- Distinguish reversal from rewrite by naming what you kept. Most good reversals preserve the schema or the interface and undo one decision inside it, which is also why they were affordable.
Follow-up
- What in that decision was irreversible, and did you know it was irreversible when you made it?
- How did you tell the people who had already built on top of the original decision?
- 01
Describe your experience with communication protocols in real-time embedded systems.
- 02
A colleague's change updates a row with UPDATE resource SET version = version + 1 WHERE resource_id = $1 AND version = $2 and treats an affected-row count of zero as a successful no-op. You read that as a silently lost update; they think returning 200 is friendlier to clients than returning a conflict. Describe how you have handled a review disagreement of this shape: what goes in the comment, when you leave the thread, and who decides. Then write the comment you would leave here, in under 80 words.
- 03
Describe a technical decision you made and later reversed. Pick one that cost something: a service you split and merged back, a cache you added and removed, an index you created that pushed the planner onto a worse plan, a projection you rebuilt from scratch. State what you believed when you decided, the measurement that changed your mind, how long the wrong version ran in production, and what the reversal cost in migrations, dual writes, and a deprecation window for callers you did not own.
How much preparation time is typical?
We recommend at least 2–3 weeks of focused preparation, specifically reviewing your past embedded projects and refreshing your knowledge of communication protocols.
Merak Software Engineer candidate reports ↗What differentiates successful candidates?
The most successful candidates are those who can demonstrate a systems-thinking approach—connecting their software work to the broader performance and energy goals of the HVAC system.
Merak Software Engineer candidate reports ↗How is the interview process for remote vs. on-site roles?
While we offer partial remote work, the interview process is consistent across locations to ensure we maintain our high standards for technical excellence.
Merak Software Engineer candidate reports ↗What topics does Merak test in interviews?
Merak interviews most often cover HVAC Systems, Requirements Management, Software/Hardware Integration Testing, Embedded Systems Development, and Software Project Management. The exact emphasis depends on the specific role you apply for.
Merak Software Engineer candidate reports ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01Merak Software Engineer candidate reports ↗
Company-reported rounds, questions and FAQ.
Candidate reports · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
PracHub practice material, not company-reported.
PracHub page · Accessed 2026-09-22 - 03PracHub preparation framework ↗
PracHub preparation guidance.
PracHub page · Accessed 2026-09-22