As a Software Engineer at NNC GLOBAL, you build solutions for the company's technical operations and digital infrastructure. You will be responsible for designing, implementing, and maintaining web applications that serve NNC GLOBAL's diverse client base. Whether you are working on legacy systems or architecting new features, your code directly influences the company's product performance and user experience.
You will join a team that values practical problem-solving and technical excellence. Candidates report that NNC GLOBAL prioritizes engineers who can translate complex, real-world business challenges into clean, efficient code. You will operate in a collaborative environment where your contributions are visible and adapting to changing project requirements is essential to the company's continued growth.
Preparation focus
editorialNo round sequence has been reported for this company, so work the categories below and confirm the format with your recruiter.
What to demonstrate
- Breadth across SQL, experimentation and product reasoning
- Ability to state assumptions before choosing a method
How to prepare
- Drill the practice exercises below and time yourself
- Prepare three quantified stories about decisions you drove
PracHub editorial advice for the preparation topics above.
Shipping a migration and the code that depends on it as a single change
During any rolling deploy, and for as long as a rollback remains possible, old and new code execute against the same schema at the same time. A migration that drops or renames a column breaks every instance that has not restarted yet, and code that requires a column the migration has not applied breaks every instance that restarted early. The discipline is expand then contract: add the new column nullable, write both shapes, backfill in batches, move reads across once the backfill is verified, and only then stop writing the old shape and drop it - four deploys, usually spread over days. It feels disproportionate until the first rollback, at which point it is the only reason the previous version still runs.
Running a schema change as though the lock lasts as long as the statement
In PostgreSQL an ALTER TABLE that needs an ACCESS EXCLUSIVE lock must first wait for every open transaction touching that table, and while it waits, later queries needing a conflicting lock queue behind it rather than overtaking it. A DDL statement that would execute in milliseconds, issued while a thirty-second analytics query is open, therefore stalls all traffic on that table for thirty seconds: the outage length is set by the longest open transaction, not by the change. The defences are specific and worth knowing by name - set lock_timeout low and retry rather than queue, add columns without a volatile default so no table rewrite occurs (from version 11 a non-volatile default is a metadata-only change), build indexes with CREATE INDEX CONCURRENTLY while accepting that it cannot run inside a transaction block and leaves an invalid index behind if it fails, and add constraints as NOT VALID followed by a separate VALIDATE CONSTRAINT, which takes a weaker lock.
Never running a concrete value through the code
Trace one small input and one edge input by hand, index by index, out loud. Re-reading your own code catches design mistakes; walking a real value through it catches the off-by-one, the uninitialised accumulator and the loop that never advances.
Naming no test cases at all
State what you would test before being asked: empty input, a single element, all elements equal, the maximum permitted size, and the input that exercises the branch you just wrote. It costs thirty seconds and is much of what separates someone who has shipped code from someone who has only solved puzzles.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
How would you architect a solution for a specific real-life business r…
How would you architect a solution for a specific real-life business requirement?
Approach
- Choose the data structure from the access pattern, not from familiarity.
- Name the brute-force solution and its complexity before improving on it.
- State the target complexity and say which constraint rules the naive version out.
Follow-up
- What is the worst case, and how likely is it on real data?
- Which test case would catch an off-by-one here?
Explain your debugging process when encountering an critical error in …
Explain your debugging process when encountering an critical error in your application.
Approach
- Choose the data structure from the access pattern, not from familiarity.
- Walk one small example through your approach before writing the whole thing.
- Name the brute-force solution and its complexity before improving on it.
Follow-up
- Which test case would catch an off-by-one here?
- What is the worst case, and how likely is it on real data?
Demonstrate your proficiency in PHP by solving a live coding challenge…
Demonstrate your proficiency in PHP by solving a live coding challenge.
Approach
- Walk one small example through your approach before writing the whole thing.
- Restate the input: its shape, its size, and what is guaranteed about it.
- Choose the data structure from the access pattern, not from familiarity.
Follow-up
- How does this change if the input no longer fits in memory?
- What is the worst case, and how likely is it on real data?
How do you ensure your code is scalable and maintainable in a producti…
How do you ensure your code is scalable and maintainable in a production environment?
Approach
- Walk one small example through your approach before writing the whole thing.
- State the target complexity and say which constraint rules the naive version out.
- Restate the input: its shape, its size, and what is guaranteed about it.
Follow-up
- What is the worst case, and how likely is it on real data?
- How does this change if the input no longer fits in memory?
Track a rolling failure rate per destination for circuit decisions
The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.
Approach
- Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
- Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
- State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
- Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
- Expire idle destinations, or memory grows with every destination ever seen rather than with the live set. Hold the rings in a bounded LRU keyed on destination_id and treat a miss as no history, which is the correct default for an endpoint that has been silent for a minute.
- Keep the half-open probe out of the window arithmetic. After the circuit opens, one probe per interval decides whether to close it, and folding that single success into a window that still holds a 100 percent failure history would reopen the destination on one data point.
Worked solution 20 min
- Define the bucket struct and the advance step: take floor(finished_at_ms / 1000), compare with the ring's current second, zero min(delta, 60) buckets forward, then write into the new head.
- Trace a destination that receives 5 attempts, goes silent for 90 seconds, then receives one more, and confirm the rate is computed from one attempt rather than six.
- Compute total memory for 40,000 destinations at 60 buckets of two 4-byte counters, and state what changes if the window widens to 300 seconds.
- Write the open rule as a single predicate combining the minimum-attempt floor with the rate threshold.
Follow-up
- The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
- A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
- How would you make the window survive a process restart, and is it worth the cost?
Write the update path that detects a concurrent edit
resource carries version INT NOT NULL DEFAULT 1. resource_revision holds revision_id, resource_id, version, actor_user_id, change_kind, patch JSONB, request_id, created_at with UNIQUE (resource_id, version). outbox_event holds aggregate_type, aggregate_id, aggregate_version, event_type, payload, status. A PUT carries the version the client read. Write the exact statements for the single transaction that applies the edit, records the revision and enqueues 'resource.updated', and give the handler's branch on zero affected rows. Then say what PostgreSQL 16 does under READ COMMITTED when two of these updates hit one row at once.
Approach
- One transaction, three writes, no network call inside it: UPDATE resource SET title = $3, version = version + 1, updated_at = now() WHERE resource_id = $1 AND tenant_id = $4 AND version = $2; then INSERT the resource_revision row at version $2 + 1; then INSERT the outbox_event row at the same aggregate_version. The event goes to a table rather than a broker because no transaction spans both.
- Branch on the affected-row count before doing anything else. Zero has three causes — stale version, wrong tenant, row gone — so re-read once and map to 409 carrying the current version, or 404 for an id outside the caller's tenant, which also stops the endpoint confirming that another tenant's id exists.
- State the engine behaviour instead of assuming it. Under READ COMMITTED the second UPDATE blocks on the row lock, and when the first commits PostgreSQL re-evaluates the WHERE clause against the newly committed row, so the version predicate now fails and the statement reports zero rows. Under REPEATABLE READ the identical collision raises SQLSTATE 40001 instead, so the handler must fold both shapes into one conflict response.
- Keep UNIQUE (resource_id, version) even though the predicate already serialises writers. It is what makes a lost update unwritable if any other path ever reaches the revision table, and it converts a logic bug into 23505 rather than into a silently missing history row.
- Refuse to auto-retry the whole PUT. A retry re-reads the winner's state and reapplies an intent formed against data that no longer exists — the silent overwrite the version token was added to detect. Return the conflict; merge field-wise only if the patches are provably disjoint.
- Note that now() is the transaction timestamp in PostgreSQL, so resource.updated_at, the revision's created_at and the outbox row share one instant, which is what later makes reconciliation between the three tables unambiguous.
Follow-up
- A client sends the version it read ten minutes ago and the resource has moved three versions. What is in your 409 so it can resolve the conflict without a full re-fetch?
- Two editors, two disjoint fields, no overlap. Does your answer still refuse the second write, and should it?
- Every write now touches a second hot table. How do you keep the outbox insert and its partial index from becoming the write bottleneck at 1.2k writes/second?
Find version gaps and relay lag with window functions
outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.
Approach
- Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
- Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
- Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
- Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.
- Interpret rather than report: no gaps plus a normal p95 of published_at - created_at points at the consumer; gaps or a fat lag tail point at the relay; rows still 'pending' with attempts > 0 point at neither, because they never left the database.
- Be explicit that the partial index on (created_at, event_id) WHERE status = 'pending' does not serve any of these — they read published rows. Name the index a recurring monitor would need, and say why a query run twice a year may not deserve one.
Worked solution 30 min
- Write the three queries against seven days of data and confirm each returns without error.
- In a scratch copy, delete one middle event for a single aggregate and confirm the gap query names that aggregate and the versions either side.
- Run a running total over ungrouped rows ordered by date_trunc('second', created_at), once with the default frame and once with ROWS, and record where the two series diverge.
- Compare the DISTINCT ON and row_number() plans on the same data and record rows-read for each.
Follow-up
- Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
- Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?
- The consumer claims it never received event 4,812,006. What do you look at, in what order?
Make the resource write endpoint safe for retrying clients
The edge API accepts POST /v1/resources at 1.2k writes/second peak under a 400 ms p99 budget, and clients retry on timeout. idempotency_key has PRIMARY KEY (tenant_id, idempotency_key) plus request_fingerprint CHAR(64), state in ('in_flight','succeeded','failed'), response_status, response_body, resource_id, locked_until and expires_at. Specify the exact sequence the handler runs: what the second request does when it arrives while the first is still executing, what a retry carrying a different body receives, what happens when a process dies mid-request, and how the table is kept from growing without bound.
Approach
- Start from the race rather than the happy path. Insert the key row first, in its own short transaction, with state 'in_flight' and locked_until set to now() plus the request deadline. The unique constraint on (tenant_id, idempotency_key) is the arbitration mechanism: exactly one caller commits the insert, and every other caller takes a unique violation (SQLSTATE 23505) and becomes a follower. Reading the table and then inserting is a check-then-act race that both callers pass, and they pass it most often under the load that generates the retries.
- Give the follower a branch for every state it can observe, with no fall-through to doing the work: fingerprint mismatch means the key is being reused for a different request, so reject with 422 and never replay the stored response; 'succeeded' replays response_status and response_body verbatim; 'failed' allows a fresh attempt; 'in_flight' with locked_until in the future is answered with 409 and a retry hint, or a short bounded wait, because the only alternative is executing the effect twice.
- Commit the effect and the record of the effect together. The resource insert, its resource_revision row, its outbox_event row and the transition of the key row to 'succeeded' all happen in one transaction, so no crash can leave the work done and the key still 'in_flight'. The earlier insert is deliberately a separate transaction: it has to be visible to a concurrent caller before the work starts, which an uncommitted row is not.
- Close the wedged-key path. A process that dies after the insert leaves a row that would otherwise block that key forever, which is what locked_until exists for. Reclaim with a single conditional statement, UPDATE ... SET state='in_flight', locked_until=now()+interval WHERE ... AND state='in_flight' AND locked_until < now(), and treat a zero rowcount as losing the reclaim. Two statements that read and then update reintroduce the original race one layer down.
- Size the retention before it becomes an incident. At the 1.2k/second peak a 24-hour window is on the order of 100 million rows, and the table grows with traffic rather than with data, so the sweep is load-bearing. Batched deletes driven by an index on expires_at keep it bounded. Range-partitioning by day and dropping whole partitions is cheaper, but PostgreSQL requires every partition-key column to appear in the primary key, so the key becomes (tenant_id, idempotency_key, created_at) and a retry that straddles the boundary no longer collides with its original. State that cost rather than meeting it later.
Worked solution 20 min
- Draw a timeline with the retry arriving 150 ms into a 900 ms first attempt, and mark the instant each row becomes visible to the other transaction.
- Write the insert-first statement, then a five-row branch table for the follower: fingerprint mismatch, 'succeeded', 'failed', live 'in_flight', expired 'in_flight' - one action each.
- Write the single conditional UPDATE that reclaims an expired in_flight row, and argue why two concurrent reclaimers cannot both see a non-zero rowcount.
- Compute rows per day at peak, name the index the sweep uses, and check the sweep rate against the insert rate.
Follow-up
- The stored response body averages 200 KB and this table is now the largest in the database. What do you store instead, and what does a replay return once the body has been pruned?
- A client library generates a fresh idempotency key on every attempt. What breaks, which layer should have caught it, and does the server have any defence?
- The first attempt succeeded but its response was lost, and the client retries 30 hours later, after the key expired. What does the second attempt do, and is that acceptable?
Give the resource write endpoints a failure taxonomy clients can act on
Two callers use POST and PATCH /v1/resources: a server-side SDK that retries automatically, and a browser app that shows the user a message. Today every failure is a 500 carrying prose. Define the error contract for a malformed body, a field that fails validation, an expired token, a token whose auth_version no longer matches, a resource_id owned by another tenant, a version mismatch on update, an idempotency key reused with a different body, an exceeded tenant quota, and a read replica that has not caught up. Deliverable: the envelope, the status per case, and what each caller does.
Approach
- Split the envelope by audience: a stable
codeenum for programs, amessagedocumented as human-only and free to change wording, arequest_idthat joins to resource_revision.request_id and the trace, and adetailsarray of field paths for validation failures. Publish the negative rules too - clients never branch onmessage, and an unrecognisedcodefalls back to the status class. - Assign status by who has to change something. 400 for bytes that do not parse, 422 for a body that parses and violates a rule, 401 for a token that no longer authenticates - expiry and an auth_version mismatch are the same instruction, re-authenticate - 403 for a scope the principal lacks, 404 rather than 403 for another tenant's resource_id because 403 confirms the id exists, 412 for a failed If-Match (409 if the version travels in the body instead), 422 for a key reused with a different fingerprint, 429 for quota.
- Derive retryability from whether the outcome is unknown, not from the status number. A timeout or a 5xx on a write is unknown - the transaction may have committed and the response lost - so the only safe retry is one carrying the same idempotency key. Every 4xx except 429 is deterministic, and retrying it only spends the caller's remaining deadline.
- Refuse to model replica lag as an error. Read-after-write is held by pinning the session to the primary for a short window, not by a 404 the SDK retries into a loop; if staleness must be visible, expose it as a watermark on a 200, because a failure code invites a retry that cannot fix it.
- Write both caller behaviours into the published contract: the SDK retries only 429, 503 and timeouts, with capped backoff and full jitter bounded by the deadline it was given; the browser stops and shows
message, except on 412, where it must re-read the resource and rebase the edit rather than resubmit.
Follow-up
- A customer reports two resources created from one click. Which of your status codes could have produced that, and what in the contract permitted the client's reading?
- You need a tenth error code next quarter without a version bump. What must v1 already have said for that to be non-breaking?
Exports duplicate a row range about once a week
Roughly once a week an export writes a file containing a duplicated range of rows. The affected job_run rows show attempt = 1, status = succeeded, one started_at, and a lease_owner naming a different host from the one whose logs show the job starting. Leases last 30 seconds and are heartbeated every 10 from inside the handler; lease_expires_at is computed on the worker and compared against the database's now(). Find the mechanism, and give a fix that holds even if you cannot fix the clocks.
Approach
- Start from the fact that eliminates the obvious answer. attempt = 1 means no retry was recorded, so this is not a re-run after failure; two workers ran the same row concurrently and the takeover path never touched the counter. lease_owner naming a host other than the one that started the job is the same statement from the other side.
- Enumerate the mechanisms that cause a premature takeover, then find the signal that separates them. Either the lease genuinely expired because the heartbeat did not fire, which is what happens when the heartbeat runs on the handler's own thread and the handler makes a long blocking call, or it only appeared expired because two clocks disagree, since lease_expires_at is written from the worker's clock and evaluated against the database's. The discriminator is the distribution: incidents clustered on the longest exports indict the heartbeat, incidents clustered on one host indict skew. Measure both, and measure each host's offset against the database directly.
- Read the reclaim query precisely. In PostgreSQL now() is transaction start time, not statement time, so a reclaimer holding a long transaction compares against an older timestamp than expected; clock_timestamp() is the statement-time function. This is worth ruling in or out before you redesign anything, because it changes which rows look expired.
- Remove the second clock rather than trying to synchronise it. Issue and extend the lease in the database, with lease_expires_at = now() + interval '30 seconds' in both the claim and the heartbeat, so exactly one clock is ever compared and worker skew stops mattering to this predicate.
- Accept that a lease can still expire under a slow worker, because a lease cannot distinguish slow from dead, and fence the work. Carry a monotonically increasing lease generation and make every write the handler performs conditional on still holding it, as UPDATE ... WHERE job_run_id = $1 AND lease_owner = $2 AND lease_generation = $3, so a displaced worker's writes affect zero rows and it aborts instead of duplicating.
- Make the handler's writes idempotent independently of all that: give each exported chunk a natural key of (job_run_id, batch_start) with a unique constraint so a second copy conflicts rather than appends, move the heartbeat off the handler's thread, and increment attempt on takeover so the event is visible in a metric.
Follow-up
- The displaced worker has already streamed half the file to object storage. What makes that side effect safe to repeat?
- You now count takeovers. What alert fires on that counter, and at what threshold?
- What breaks if you simply raise the lease to five minutes?
For someone fluent in a dynamic language who has shipped real work but has never had to say what the runtime is doing underneath. The week is built on measuring and deliberately breaking things, because the questions that expose this background are the ones where the interviewer asks why a second time.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Measure before reasoning
- Take a slow piece of your own code, write down in advance where you believe the time goes, then profile it and record how wrong the guess was. The cost is usually an allocation you did not notice or an accidental quadratic membership test.
- Replace one list membership test inside a loop with a set and measure at a thousand, ten thousand and a hundred thousand elements, confirming the shape of the curve rather than only that it got faster.
- Write down the three quantities you can now measure instead of assert: wall time, peak memory, and call count for the function you suspected.
Deliverable: A before-and-after profile of real code plus a written note on the size of the gap between the guess and the measurement.
Practice prompt ↗Practice prompt ↗Worked solution ↗02References, copies, and the bugs they produce
- Write the function with a mutable default argument, call it three times, and explain the accumulating result: the default is evaluated once when the function is defined, so every call shares one object.
- Build a nested structure, take a shallow copy, mutate an inner element, and show that both views changed, because a shallow copy duplicates the container and not the elements. Then fix it with a deep copy and state the cost you just accepted.
- Write two functions, one mutating its argument in place and one rebinding the local name, and predict the caller's view of each before running it. That single distinction produces most of the bugs that pass their tests.
Deliverable: Three small programs whose output you predicted correctly before running, each with a one-line statement of the rule underneath.
Practice prompt ↗Practice prompt ↗03Types, once, in a language that checks them
- Port one module you have already written, roughly a hundred lines, into a statically typed language, and record every place the compiler demanded an answer your original had left implicit: a value that can be absent, a numeric width, a case never handled.
- Write the same signature in both languages and state what the static one guarantees before the program runs and what it does not, since it will not save you from a wrong algorithm or an index out of range.
- Write the difference between an interface satisfied by declaration and one satisfied structurally, with one case each where the other approach would miss the mistake.
Deliverable: One module in two languages plus a list of the questions the type checker forced you to answer.
Practice prompt ↗Practice prompt ↗04Concurrency, starting with what actually runs at the same time
- Run the same CPU-bound function across four threads and four processes and measure both. Under the default CPython build the threaded version will not speed up, because only one thread executes bytecode at a time; the process version will. Check which build you are on first, since free-threaded builds remove that lock and change the result.
- Then run a blocking I/O workload across four threads and measure it speeding up, because the interpreter releases that lock around blocking calls, which is why treating threads as useless is wrong as a general claim.
- Build the lost update: two threads each incrementing a shared counter a hundred thousand times, and show a final value below the expected sum, because an increment is a load, an add and a store and the thread can be suspended between them. Fix it with a lock and then measure what the lock costs.
Deliverable: Three measurements, threads against processes on CPU work, threads on I/O work, and a demonstrated lost update, each with the mechanism written underneath.
Practice prompt ↗Practice prompt ↗Worked solution ↗05Debugging as a procedure rather than an instinct
- Work one real failure as a bisection: find a revision or an input size where it is good and one where it is bad, halve repeatedly, and state the two assumptions bisection needs, that the property changes exactly once across the range and that the test is reliable.
- Minimise one failing input to the smallest version that still fails, and record how many rounds it took.
- Keep a hypothesis log for one bug in three columns, what I believe, what would disprove it, what I observed, and stop yourself the first time you are about to change two things at once.
Deliverable: One bug worked to root cause with a written hypothesis log and a minimised reproducing input.
Practice prompt ↗Practice prompt ↗06Tests that catch the bug you are about to write
- Implement an LRU cache with a capacity bound, then write the three test cases that would catch an off-by-one in eviction: insert exactly capacity items and assert nothing was evicted, insert one more and assert the least recently used key is the one gone, and read an old key just before that insert so the eviction victim changes.
- Add a property test comparing your implementation against a deliberately slow reference, an ordered list scanned linearly, over a few thousand random operation sequences, because a slow reference finds the cases you would not have thought to write.
- Write one numeric test that fails under exact equality and passes with a tolerance, and state why the tolerance has to be relative rather than absolute once the magnitudes grow.
Deliverable: An LRU implementation with three boundary tests, one property test against a slow reference, and one tolerance-based numeric test.
Practice prompt ↗Practice prompt ↗07Debug something broken, out loud
- Have someone plant three defects in a two-hundred-line program, an off-by-one, a shared mutable state bug, and a wrong error-handling path, then find them while narrating, under a fixed rule: state the hypothesis before touching anything.
- Time each one and record which tool found it, reading, a printed value, a debugger, or a test, because the question asked in interviews is how you would find it rather than what it was.
- Write the sentence you will use when you do not yet know the cause, one that names the next measurement instead of offering a guess.
Deliverable: A recorded debugging session with time-to-find per defect and the method that found each.
Practice prompt ↗Worked solution ↗Expand any day for tasks and deliverables. Your progress is saved on this device.
A slipped date is only a bad story if you sat on it. What matters is what you believed when you gave the number, the signal that told you it was wrong, how many days passed before you said so, and what you cut rather than asking for more time. Scope you defended counts as much as scope you dropped.
Unblock an engineer without taking the keyboard
A teammate has spent two days on a job handler that occasionally writes duplicate rows. They are certain the queue is delivering twice by mistake. You suspect a lease expiring under a slow handler, so the job is running concurrently with itself. Describe how you have unblocked someone in this position: what you asked before offering a hypothesis, what you showed them rather than told them, and what you left them owning. Then say what you would do if their theory turned out to be the right one.
Approach
- Ask before diagnosing, and ask for things answerable from data they already have: the attempt count on the job rows that produced duplicates, the handler's observed duration against its lease expiry, and whether the duplicate rows share a natural key that a unique constraint could have caught.
- Teach the shape rather than the answer. A lease cannot distinguish a dead worker from a slow one, so a handler that outruns its lease is running twice by design, and deploys deliver the other half by killing handlers mid-run on every rollout. Both of their candidate theories produce identical duplicate rows, which is why the evidence has to come from timings rather than from argument.
- Hand over a checklist they execute: a natural key on every write the handler performs so the second copy collides rather than appends, the record of intent written before any external effect, a lease heartbeat while running, and the metric that shows it working.
- Keep ownership with them deliberately. Pair on the first write, then step back; if you finish it yourself you have closed one ticket and left the same person stuck on the next redelivery.
- Close on the systemic gap that let two days pass, which is usually a missing dashboard for attempt counts or an undocumented at-least-once contract, and fix that rather than only the bug.
Follow-up
- How would you distinguish a genuine double-delivery from a lease expiry using only the data already stored?
- Their handler calls an external endpoint before recording that it did. What do you tell them to change first?
- What do you do the third time the same person brings you the same class of bug?
Narrate an outage you owned from page to postmortem
Pick an incident you personally drove, ideally one where writes were affected rather than reads. In six to eight minutes: state the symptom as it first appeared on a dashboard, the blast radius you established before you knew the cause, the mitigation you applied and when, the mechanism you eventually proved, and the follow-up that would prevent a repeat. Bring numbers: error rate, tenants affected, minutes to mitigate, minutes to resolve. If you cannot name what you measured, choose a different incident.
Approach
- Open on the signal rather than the cause: which metric at which percentile moved, on which service, at what time, so the listener follows the same evidence you had rather than a conclusion you already reached.
- Separate mitigation from diagnosis out loud. State what you did to stop the bleeding (flag off, shed traffic, drain a lease, roll back a deploy) and say plainly that you did it before the mechanism was known, because those are two jobs with different deadlines.
- Establish blast radius in countable terms: how many tenants, how many writes, and crucially whether the effect was loss or only delay. An append-only revision table or a pending outbox row means the change survived and the projection was merely behind, which is a repair rather than a data-loss incident.
- Prove the mechanism instead of asserting it. Name the trace span that grew, the plan that flipped to a sequential scan, the lease that expired, plus one alternative you ruled out and the signal that stayed flat while you ruled it out.
- Close on the durable fix and its cost, distinguishing what landed that week from what needed an expand-and-contract migration across several deploys, and say which of the two you actually finished.
Follow-up
- What would you do differently in the first five minutes, given the same dashboard and no more information?
- Which follow-up action did you deliberately not take, and why was dropping it the right call?
- How did you convince yourself the mitigation was safe to apply while the cause was still unknown?
Estimate work you have never done and defend the range
You are asked to estimate a change you have never attempted: add a column to a 100-million-row table, populate it, move reads across, and drop the old shape. Give a range with the assumptions that generate it, including batch size, the signal your backfill throttles on, and wall-clock hours, and name the three unknowns that would move the number most. Then describe a real estimate you gave under comparable ignorance: how you expressed its uncertainty, what you committed to, and how wrong you turned out to be.
Approach
- Decompose into independently deployable steps before estimating anything: add the column nullable, write both shapes, backfill in batches, verify, move reads, stop writing the old shape, drop it. That is four deploys spread over days, and the calendar estimate is dominated by them rather than by the loop's runtime.
- Do the arithmetic aloud for the part that has arithmetic in it: batch size times number of batches times per-batch duration, at a write rate the primary can absorb alongside roughly 1.2k writes per second of production traffic. The loop is throttled by replication lag and lock waits, not by how fast it can issue statements.
- Price the schema step by its lock rather than its statement duration. In PostgreSQL an ALTER TABLE taking ACCESS EXCLUSIVE waits for every open transaction on that table while later queries queue behind it, so a millisecond change issued during a thirty-second analytics query stalls that table for thirty seconds. Adding a nullable column with a non-volatile default avoids a rewrite from version 11; a new index wants CREATE INDEX CONCURRENTLY, which cannot run inside a transaction block and leaves an invalid index behind if it fails.
- Express the answer as a range whose endpoints each trace to a stated assumption, then name the cheapest experiment that collapses it, which is almost always running one real batch against the real table and multiplying.
- Commit to a checkpoint rather than a completion date: the day you report a measured number from that first batch. That is a promise you can keep under uncertainty, and it is what the asker actually needs in order to plan.
Follow-up
- How do you verify the backfill genuinely finished, given rows written by production traffic while it ran?
- Where does the backfill resume from after a worker is killed mid-batch, and what makes that resume point trustworthy?
- Your first batch comes back ten times slower than assumed. What do you tell the person waiting on the estimate, and when?
- 01
A teammate has spent two days on a job handler that occasionally writes duplicate rows. They are certain the queue is delivering twice by mistake. You suspect a lease expiring under a slow handler, so the job is running concurrently with itself. Describe how you have unblocked someone in this position: what you asked before offering a hypothesis, what you showed them rather than told them, and what you left them owning. Then say what you would do if their theory turned out to be the right one.
- 02
Pick an incident you personally drove, ideally one where writes were affected rather than reads. In six to eight minutes: state the symptom as it first appeared on a dashboard, the blast radius you established before you knew the cause, the mitigation you applied and when, the mechanism you eventually proved, and the follow-up that would prevent a repeat. Bring numbers: error rate, tenants affected, minutes to mitigate, minutes to resolve. If you cannot name what you measured, choose a different incident.
- 03
You are asked to estimate a change you have never attempted: add a column to a 100-million-row table, populate it, move reads across, and drop the old shape. Give a range with the assumptions that generate it, including batch size, the signal your backfill throttles on, and wall-clock hours, and name the three unknowns that would move the number most. Then describe a real estimate you gave under comparable ignorance: how you expressed its uncertainty, what you committed to, and how wrong you turned out to be.
Is this an official NNC GLOBAL interview guide?
No. It is PracHub's own research and practice material for the Software Engineer role at NNC GLOBAL. Rounds and questions reflect what candidates have reported, not a process NNC GLOBAL has published, and they change over time. Confirm the current format and scope with your recruiter.
PracHub interview research ↗How long should I spend preparing for the technical rounds?
Plan for at least two weeks of focused practice on PHP fundamentals and common web application design patterns. Focus on building small, functional projects to refresh your memory on practical application.
PracHub interview research ↗Is the interview process difficult?
Candidates describe the interviews as rigorous, aimed at checking readiness for a high-performance environment. Expect challenging, real-world scenarios rather than rote memorization questions.
PracHub interview research ↗What is the company culture like?
NNC GLOBAL prides itself on a friendly and open culture. Speak freely and engage with your interviewers, since the evaluation is meant to be a two-way dialogue.
PracHub interview research ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01PracHub interview research ↗
PracHub editorial research into this company and role, maintained with this guide. Candidate-reported, not an employer publication.
PracHub page · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
Cross-company practice questions for this role.
PracHub page · Accessed 2026-09-22 - 03PracHub interview preparation framework ↗
The framework the preparation plan follows.
PracHub page · Accessed 2026-09-22