As a Software Engineer at ONEOK, you are joining a vital segment of the energy infrastructure industry. Your work directly supports the systems that move, process, and store natural gas and natural gas liquids. This role is not merely about writing code; it is about building reliable, scalable software solutions that enhance operational efficiency, safety, and decision-making across the company’s extensive midstream assets.
You will find yourself collaborating with cross-functional teams, including operations, engineering, and data science, to solve complex, real-world problems. Whether you are developing internal tools, optimizing data pipelines, or supporting critical infrastructure monitoring, your contributions have a tangible impact on the business. ONEOK values engineers who can bridge the gap between technical implementation and business requirements, ensuring that technology serves the broader goals of energy reliability and operational excellence.
Application Review
reportedHalf of this call is the part candidates treat as small talk: start date, notice period, work authorisation and its timing, location and time zone, on-call, and the number. Those are what kill offers late, after several engineers have each spent a day. Surfacing a hard constraint now costs you nothing and occasionally buys you something, since a loop compressed to fit a competing deadline can usually only be arranged if it is asked for early. The common failure is deflecting the compensation question twice, then discovering at offer stage that the band never reached your number.
What to demonstrate
- Whether your hard constraints are compatible with the role before a loop gets booked: earliest start, notice period, what authorisation you hold and when it needs action, days on site, willingness to carry a pager
- Whether you give a compensation range with something behind it, such as current total compensation or a competing timeline, rather than leaving the band untested
- Whether your stated timeline is real, since a competing deadline raised now is something scheduling can sometimes work around and the same deadline raised at offer stage usually is not
How to prepare
- Write each constraint down in one line before the call and state them as facts rather than negotiating them live under a question you were not expecting
- Set your range from two or three current data points for that level and location, and name the structure you are quoting in, so the number is comparable to the one they are holding
- If another process is running, say where it stands and by when, and ask directly whether this loop can be scheduled inside that window
Initial Screening
reportedThe title covers product work, platform work, infrastructure, mobile and frontend, and those are different jobs with different loops behind them. A screening call is the cheapest place to find out which one the seat is, and asking reads as experienced rather than fussy. The questions that separate them: what the team is on call for, what the last three projects were, and whether any round happens inside an existing repository instead of a blank file. Then say which of that you have done and which you have not. Claiming the whole posting is the fastest way to be found out one round later.
What to demonstrate
- Whether you can locate your experience inside one flavour of the role honestly instead of claiming the entire requirements list
- Whether you name what you have not done, which an experienced screener reads as a level signal and can plan the loop around
- Whether what you want next matches what the seat is: someone who wants greenfield work landing on a team that mostly operates an existing system is a hire that leaves within the year
How to prepare
- Mark every line of the posting as done, adjacent or new, and write one sentence for each adjacent line naming the closest thing you actually built
- Split your last two years into rough percentages across feature work, operating and debugging live systems, and design or review, so a question about scope gets numbers rather than adjectives
- Bring three questions that discriminate between seats: what the team is paged for, how much of the work is changing existing code versus standing up something new, and what shipped in the last quarter
Panel Interviews
reportedWhere the day includes a partner from product, design or data, that conversation is weighted like the technical ones and prepared for least. They are deciding one thing: whether having you in the room makes their decisions cheaper. That means options with costs attached, not implementation detail and not "it depends". An estimate someone can plan against — a range, the assumption that would push it to the high end, and what you would drop to hit the low one — is worth more than a confident single number, which everyone present already knows is wrong.
What to demonstrate
- Whether an estimate comes as a range with the assumption most likely to break it, and states what a specific scope cut would actually buy
- Whether a technical constraint is handed over as a choice with consequences on their side, rather than as a verdict they have no standing to argue with
- Whether you establish what decision is on the table before proposing anything
- Whether risk is raised while it can still change the plan, with the trigger that would confirm it, instead of reported afterwards as a slip
How to prepare
- Take a project that shipped late and write the two-sentence warning you could have given three weeks earlier, naming what you would have needed decided at that point
- Rehearse one estimate out loud until it arrives in three parts: the range, the single assumption that would blow it, and the smallest thing you would cut to protect the date
- Rewrite an objection you have actually made — the "we can't do that" version — as two options with their costs, so the choice ends up with the person who owns it
Final Assessment
reportedCoding rounds mostly set a floor. They decide whether you clear the bar, not where you land on the ladder. Level tends to come out of the design discussion and the ownership stories, so the question worth auditing beforehand is whether the scope you describe matches the scope of the job. Work that stops at your own service, or a story whose hard part was writing the code rather than getting several people to agree on an interface, reads a level below where you think you are interviewing, and that gap is usually resolved downwards.
What to demonstrate
- Whether the largest thing you describe owning ran end to end — the decision, the migration path, the rollout, and what you did when it went wrong — or stopped at the change you merged
- Whether design answers include what you would not build, what you would defer, and what you would measure before committing, rather than only what the boxes are
- Whether a disagreement in a story was settled with something checkable — a benchmark, a prototype, a written proposal — instead of by seniority or by waiting it out
- Whether you can say which calls you made alone and which you escalated, and why the line sat where it did
How to prepare
- Write your largest piece of owned work as a timeline of decisions — who decided what, when, and what you did when the plan broke — then delete every sentence whose subject is "we" and see how much survives
- Take one system you know well and drill the migration answer: how old and new paths run side by side under live traffic, how you compare their outputs, what the rollback is once writes are going to both, and which step you would not automate
- Map each line of the ladder in the job posting to a specific thing you have done, find the line you cannot support, and prepare the closest evidence you have plus an honest account of the gap
PracHub editorial advice for the preparation topics above.
Choosing an index from the columns a query mentions rather than from how it filters and orders
A composite B-tree index on (a, b, c) can be seeked only as a left prefix: equality on a, then equality on b, then a range or an ordering on c. A query that filters on b alone cannot seek into it at all and at best gets a full scan of the index; a query that filters a and ranges on b gets no benefit from c, because the index is only sorted by c within a fixed (a, b) pair. The practical consequence is that one index per column is close to useless for multi-predicate queries while a single correctly ordered composite index turns a scan into a lookup. The ordering half is what gets missed: if the index cannot satisfy the ORDER BY, the database must read every matching row and sort before the limit can apply, so a LIMIT 20 over a million matching rows still reads a million rows.
Assuming an isolation level prevents the anomaly you actually have
Isolation levels are named by the SQL standard but implemented differently, so any claim about one is only true of a named engine. PostgreSQL defaults to READ COMMITTED, where every statement takes a fresh snapshot, so two statements inside one transaction can legitimately disagree about the same row. Its REPEATABLE READ is snapshot isolation: it removes non-repeatable and phantom reads but permits write skew, where two transactions each read a set, each conclude their own write is safe, both commit, and the combined result violates a constraint that no single row expresses. Only SERIALIZABLE closes that, and it closes it by aborting a transaction with a serialization failure (SQLSTATE 40001), which means the guarantee is theoretical unless the application has a retry loop. InnoDB's REPEATABLE READ is a different mechanism again - plain SELECTs read a consistent snapshot while locking reads and writes see the latest committed row - so a read-modify-write inside one transaction can act on a value that the transaction's own earlier SELECT never returned.
Starting work without saying what you are about to spend time on
State the plan before executing it: the approach, roughly how long it will take, and what you intend to leave hand-waved. That gives the interviewer a chance to redirect you in ten seconds rather than watching you spend fifteen minutes on the wrong sub-problem.
Reading the constraints as preamble rather than as part of the problem
The bounds are usually there to eliminate the obvious approach: n up to 10^5 makes an O(n^2) scan roughly 10^10 operations, far outside any per-test time budget, and an input larger than memory rules out loading it at all. When a bound is not given, ask for it, then say out loud which approach it kills.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Describe a technical problem that you were able to solve.
Describe a technical problem that you were able to solve.
Approach
- Choose the data structure from the access pattern, not from familiarity.
- Restate the input: its shape, its size, and what is guaranteed about it.
- Name the brute-force solution and its complexity before improving on it.
Follow-up
- How does this change if the input no longer fits in memory?
- Which test case would catch an off-by-one here?
Experience related to gas compression systems.
Experience related to gas compression systems.
Approach
- Choose the data structure from the access pattern, not from familiarity.
- State the target complexity and say which constraint rules the naive version out.
- Restate the input: its shape, its size, and what is guaranteed about it.
Follow-up
- Which test case would catch an off-by-one here?
- What is the worst case, and how likely is it on real data?
Find overlapping job attempts and peak concurrency from lease records
A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.
Approach
- Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
- For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
- For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
- Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
- State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
- Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.
Worked solution 30 min
- Write the interval derivation with the COALESCE and state in one line which of the two end sources is observed and which is assumed.
- Write the concurrency sweep: the endpoint tuples, the sort key including the end-before-start tie-break, and the per-job_type counter.
- Hand-trace four attempts of one job, two disjoint and two overlapping by three seconds, and confirm the overlap detector fires exactly once.
- Add the skew filter as a minimum overlap duration, state the value you chose, and justify it from how the timestamps are written.
Follow-up
- A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
- Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
- How would you compute both answers incrementally as records arrive rather than in a daily batch?
Keep soft-deleted accounts from blocking re-registration
app_user holds user_id, tenant_id, email CITEXT, password_hash (NULL for SSO principals), email_verified_at, auth_version, status ('invited','active','suspended','deactivated'), created_at, updated_at, deleted_at. Two live accounts for one address inside a tenant must be impossible, but an address freed by a soft delete must be reusable, and the same tenant may delete and re-register it repeatedly. Write the uniqueness DDL for PostgreSQL 16, then the equivalent for MySQL 8 where partial indexes do not exist, and say what each permits once three deleted rows already hold that address.
Approach
- Start from what is actually unique: not (tenant_id, email), but (tenant_id, email) among live rows. PostgreSQL says that directly — CREATE UNIQUE INDEX app_user_live_email ON app_user (tenant_id, email) WHERE deleted_at IS NULL. A full constraint over the same two columns burns the address permanently the first time someone deletes an account.
- Keep case-insensitivity in the type or the index, never in the application: CITEXT as given, or UNIQUE (tenant_id, lower(email)) as an expression index where the extension is unavailable. A case-sensitive unique column is exactly how two accounts for one human appear.
- For MySQL 8 the predicate has to move inside the key: add a discriminator column that is a constant 0 while the row is live and is set to user_id on delete, with UNIQUE (tenant_id, email, deleted_marker). Live rows share the constant and still collide; deleted rows differ from each other and stop colliding.
- State the NULL variant and its dependency: leaving the marker NULL for deleted rows also works, because a unique index treats NULLs as distinct — true in MySQL, and true in PostgreSQL only under the default NULLS DISTINCT, which PostgreSQL 15 lets you reverse. Check the polarity against the three existing deleted rows: constant-on-live is what preserves the collision you want, and reversing it silently admits duplicate live accounts.
- Say what a soft delete must do besides setting deleted_at: increment auth_version so existing tokens stop validating, leave resource.owner_user_id and resource_revision.actor_user_id intact, and accept that the address is retained — erasure is a different requirement answered by scrubbing the column, not by a DELETE that would break those references.
Worked solution 20 min
- Create the PostgreSQL partial unique index, insert a live row, soft delete it, and insert the same address again.
- Repeat the delete-and-reinsert cycle three times and confirm three deleted rows coexist with exactly one live row.
- Write the MySQL form with the discriminator, then deliberately reverse the polarity so live rows carry NULL, and show two live duplicates commit.
- Attempt a second live insert on both engines and map the resulting 23505 / ER_DUP_ENTRY to the 409 the handler should return.
Follow-up
- A deleted account re-registers with the same address the next day. Do the old resource rows follow the new user_id, and how does the API keep the two principals apart?
- How do you honour an erasure request while resource_revision.actor_user_id still references this table?
- What changes if a user may hold membership in two tenants?
Hold a per-tenant active cap against concurrent creates
A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.
Approach
- Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
- Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
- Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
- State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
- For the job case the invariant is expressible per row, so let the database hold it: a partial unique index on job_run (tenant_id, job_type) WHERE status IN ('queued','running') makes a second running export unwritable and the loser takes 23505, mapped to 409. That is strictly better than a counter — no drift, no reconciliation — and it is available only because the cap is one rather than fifty.
- Add the retry discipline each route demands: under SERIALIZABLE both 40001 and deadlock 40P01 are retryable and the retry must re-execute the read, while under READ COMMITTED with the counter nothing retries, because the conflict is reported to the caller rather than raised as an error.
Follow-up
- A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
- The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
- How do you detect after the fact that the counter drifted, without locking the table?
What is more important: money or integrity?
What is more important: money or integrity?
Approach
- State your assumptions explicitly before working the problem.
- Work from the requirement backwards to the design.
- Say what you would check first and why it is the highest-information step.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
What is your view on the role government should play in business?
What is your view on the role government should play in business?
Approach
- Say what you would check first and why it is the highest-information step.
- State your assumptions explicitly before working the problem.
- Clarify what is being asked and what a complete answer contains.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Shard by tenant when one tenant outgrows a single shard
One primary holds resource, resource_revision, outbox_event and idempotency_key for every tenant and is at its write ceiling at 1.2k writes/second. tenant_id leads every index. Shard across eight primaries. One tenant holds 22% of all rows and by itself exceeds a single shard's write capacity. Design the routing, the split of that tenant, and the online move of a tenant between shards with writes continuing. State what breaks for queries that are tenant-scoped today, and exactly what a write must do when it arrives at the old shard after the cutover.
Approach
- Route on a unit smaller than a tenant from the start. Make the routing key (tenant_id, bucket) with a fixed bucket count - 64 over eight shards - and keep a directory mapping each (tenant_id, bucket) to a shard, carrying a version and cached in every service. An ordinary tenant has all 64 buckets pointing at one shard and behaves exactly as it does today; only the hot tenant has its buckets spread. Hashing tenant_id alone spreads tenants evenly, gives you no way to move one, and has no answer at all for a tenant larger than a node. The bucket count is the part you cannot change later without rehashing rows, so pick it well above the shard count and rebalance by moving buckets, not by re-bucketing.
- For the tenant that exceeds one node, its buckets must land on different shards - that is the whole point of bucketing it, and buckets confined to its own shard would rename the rows while leaving every write on the node whose ceiling it already exceeds. Size it from measured numbers rather than from its row share: 22% of rows says nothing about write rate. The current primary tops out near 1.2k writes/second on this hardware and workload, so a tenant peaking at W writes/second needs its buckets spread over at least ceil(W / headroom-per-shard) shards, where the divisor is the share of each shard's ceiling you are willing to give it while that shard still serves other tenants - not the full 1.2k. Size on its peak, not its mean.
- Fix the co-location invariant at the right grain. What must commit in one transaction is a resource, its resource_revision row and its outbox_event row, so the bucket is a property of the resource: derive it once at creation and stamp it into resource_id, and every later revision and event routes with its parent for free. Per-tenant co-location was never the requirement, and mistaking it for one is what makes a tenant look unsplittable. What genuinely breaks is an invariant spanning two resources of one tenant - a per-tenant counter, uniqueness across its resources - which now needs either a home-shard table or two-phase commit, and 2PC at this write rate is not a serious option.
- Keep the idempotency constraint arbitrating, because it is now enforced per shard. PRIMARY KEY (tenant_id, idempotency_key) only continues to reject a retry if the same key always lands on the same shard, so derive the create-path bucket from hash(tenant_id, idempotency_key) and mint the new resource_id inside that bucket, which also puts the key row and the resource it guards in one transaction. A bucket chosen from anything that differs between a request and its retry - a timestamp, the worker id, a client-supplied resource id - splits one key across two shards, both inserts succeed, and the write endpoint's retry safety is silently gone.
- State what the split costs the hot tenant's reads. Its listing, one 21-entry index scan today, becomes a scatter-gather: every bucket-shard returns 21 rows, a coordinator merges and discards the surplus, latency becomes the slowest shard's rather than the median's, and the keyset cursor has to carry a position per bucket instead of one (updated_at, resource_id) pair. Counts over that tenant fan out the same way. The relay becomes one leader per shard; consumers are unaffected because their ordering guarantee was always per aggregate and a resource's events never leave its bucket.
- Move one bucket at a time, reversibly, and fence the straggler at the shard rather than at the caller. Copy from a snapshot while the bucket stays read-write, tail changes until the remaining delta is a few seconds of writes, fence writes for that (tenant_id, bucket) alone with a retryable status, apply the final delta, bump the routing version. Scoping the fence to a bucket is what makes a seconds-long freeze affordable. Then have each shard store the routing epoch it believes it holds for each (tenant_id, bucket) and reject any write carrying an older one: without that token, a service on a stale map commits successfully to a database nothing will ever read again, and the loss stays invisible for days. Outside the data path, anything that aggregated across tenants in one query - admin reporting, the A-Z index, global counters - becomes a fan-out across eight shards with a merge, and per-tenant uniqueness survives only on tables that stay whole on the tenant's home shard.
Worked solution 40 min
- Write the routing lookup keyed by (tenant_id, bucket), its version field, where it is cached and invalidated, and the request-path cost.
- From the tenant's measured peak write rate and the per-shard headroom you will grant it, compute how many shards its buckets must span, assign them, and show no single shard carries its whole write rate.
- Trace one create end to end: which value picks the bucket, where resource_id gets it stamped, and why the revision, outbox and idempotency rows land on the same shard.
- Write the move steps for one bucket, then the epoch check the shard performs on every write, and trace a stale-map write through it.
Follow-up
- The fence lasts 90 seconds instead of 4 because the final delta keeps growing. What is happening, and what do you do while the tenant is fenced?
- Two tenants must merge into one account. What does that cost under this scheme, and which step is not reversible?
- A shard is lost entirely. Which tenants are affected, and what is the source of truth for rebuilding them?
Every query on one table stalls for forty seconds mid-deploy
During a release on PostgreSQL, every query touching resource times out for about 40 seconds and then recovers with no intervention. The release ran one migration, ALTER TABLE resource ADD COLUMN archived_reason TEXT, and the migration log shows it completing in 6 ms. Unrelated tables showed no change in error rate. Explain how a 6 ms statement caused a 40-second stall, give the ordered checks you would run on a live system to confirm it, and give the migration procedure that prevents a repeat.
Approach
- Separate the statement's duration from the lock's duration. ADD COLUMN with no default is a catalogue-only change and genuinely runs in milliseconds, but it requires ACCESS EXCLUSIVE, and it cannot acquire that until every transaction already touching the table has finished.
- Account for the queueing, which is the part that surprises people. A lock request that is waiting blocks later requests for conflicting modes behind it rather than letting them overtake, so one long-open transaction holds the DDL and the DDL holds all the traffic. The stall length is set by the longest open transaction, not by the size of the change.
- Confirm on a live system in this order: pg_stat_activity for that table ordered by xact_start, looking for the oldest transaction and specifically for state = idle in transaction; then pg_locks where granted = false to find the waiter; then join them on pid to name blocker and blocked. pg_blocking_pids() does that join for you and is the fastest single call.
- Prevent rather than merely time it better. Set lock_timeout to a second or two on the migration session so the DDL abandons the queue after a bounded wait and is retried, instead of holding it for as long as the oldest transaction lives. Be exact about what that buys: queries arriving during the wait still queue behind the pending ACCESS EXCLUSIVE request, so each attempt costs them up to one lock_timeout of added latency. The outage goes from 40 seconds to about one second per attempt, not to zero. Also run migrations away from deploy-time peaks, and put a statement timeout and an idle-in-transaction timeout on the analytics role that opens the long transactions.
- Know the lock each change takes, since the mitigation differs by change. A column with a non-volatile default is a metadata-only change from PostgreSQL 11 and still needs the brief ACCESS EXCLUSIVE; an index needs CREATE INDEX CONCURRENTLY, which cannot run inside a transaction block and leaves an INVALID index to drop if it fails; a check or foreign key is added NOT VALID and then VALIDATE CONSTRAINT as a separate statement under a weaker lock.
Follow-up
- The same release also wants NOT NULL on that column. What is the sequence that gets there without a long lock?
- Your lock_timeout retry fails ten times in a row because the analytics transaction is always open. What do you change?
- How does this differ on MySQL with InnoDB online DDL, and what is the equivalent of the waiting-lock queue there?
For a candidate senior enough that the loop turns on design and judgement rather than on whether the coding round gets finished. Five days build one system properly and then stress it; coding gets a single maintenance day, on the assumption that the risk at this level is an unexamined tradeoff rather than a missed algorithm.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Numbers before diagrams
- Build your own reference card of the figures you will re-derive all week: bytes for a realistic record, requests per second implied by a given daily active count, and the storage that a year at a given write rate produces. Derive each one rather than copying it, because the derivation is what survives a follow-up.
- Turn one product statement into capacity requirements. From ten million daily users at four writes and forty reads each, state the peak-to-average factor you are assuming and why, then produce peak write QPS, peak read QPS and a year of storage.
- Write the two numbers whose order of magnitude changes the design, the read-to-write ratio and the working-set size against memory per node, and state the threshold at which each one flips your answer.
Deliverable: A one-page numbers card and one worked capacity estimate with every assumption written down.
Practice prompt ↗Practice prompt ↗Worked solution ↗02One system, from requirements to schema
- Spend the first ten minutes producing only functional requirements, non-functional targets with numbers attached, a p99 latency, a durability expectation, a consistency requirement, and an explicit out-of-scope list.
- Define the interface before the boxes: the three or four endpoints, their parameters, what each returns, and which of them are idempotent.
- Write the data model, then write the single access pattern that justifies it, and state what the schema would have to become if the dominant access pattern were the other one.
Deliverable: One design carried to endpoint-and-schema depth, with non-functional targets expressed as numbers and a written out-of-scope list.
Practice prompt ↗Practice prompt ↗03The consistency you are actually buying
- Write out what a client sees under asynchronous replication when its write commits on the leader and its next read is served by a lagging follower, then write the two fixes, pinning that session's reads to the leader for a bounded window or carrying a version token the replica must reach, and the cost of each.
- Work the quorum arithmetic on paper for N of three with W and R of two, and separate what R + W > N does guarantee, that any read set intersects any write set, from what it does not: on its own it is not linearizability, and a sloppy quorum that accepts writes on nodes outside the preference list breaks even the intersection.
- Take two storage choices with different defaults, a single-leader relational store committing synchronously and a quorum-replicated store that converges eventually, and write the specific product behaviour that would be wrong under each, rather than a general statement about which is stronger.
Deliverable: A page separating what quorum overlap guarantees from what it does not, with one concrete product misbehaviour attached to each gap.
Practice prompt ↗Practice prompt ↗04Failure is the design
- For one write path, work through the case where the client times out after the server has already committed, then design the idempotency key: who generates it, how long it is retained, and what the duplicate request returns.
- Express the retry policy as parameters rather than as a word: maximum attempts, base delay, backoff factor, jitter, and which error classes are retried at all. Then state why retrying a non-idempotent write without a key is a correctness bug and not merely waste.
- Compute the fan-out effect on tail latency. If a request waits on ten backends and each independently exceeds its p99 one percent of the time, the chance at least one is slow is 1 - 0.99^10, about ten percent. Then write why independence is the optimistic assumption and what correlates them in practice.
- Name the backpressure mechanism for one queue or one dependency in the design, a bounded queue with shedding or a concurrency limit, and write what the caller is told when it engages.
Deliverable: One write path with an idempotency design, a parameterised retry policy, and a written tail-latency calculation with its assumption named.
Practice prompt ↗Practice prompt ↗Worked solution ↗05Scaling the hot path
- Choose cache-aside or write-through for one read path and write the staleness window each produces, then name the invalidation event and what the system does when that event is lost.
- Design against the stampede: either coalesce requests so only one recomputes a missing key, or refresh early with jittered expiry, and write why identical TTLs on keys populated in the same moment produce a synchronised expiry and a thundering herd.
- Shard one table by a key you choose, then answer the two questions that break the choice: which queries now require a scatter-gather, and what happens to the distribution when one tenant is a hundred times larger than the median.
- Write the cost of adding a node under plain modulo placement, where nearly every key moves, against consistent hashing, where roughly one key in n+1 moves, and state what virtual nodes are for.
Deliverable: A caching and sharding decision for one path, each with its failure mode and its rebalancing cost written beside it.
Practice prompt ↗Practice prompt ↗06Keep the coding hand in, at the bar that applies to you
- Solve one medium problem in thirty minutes, then spend twenty more making it production-shaped: named invariants, validation at the boundary, and errors that distinguish a caller mistake from an internal fault.
- Write the tests you would require of a colleague's version of that function: one for empty input, one for the boundary, and one for the case the implementation is most likely to get wrong.
- Read a piece of your own code from six months ago and write the change you would ask for, phrased as you would actually phrase it in review.
Deliverable: One problem hardened to review standard, with its test list and one written review comment.
Practice prompt ↗07Defend it while being interrupted
- Run a forty-five-minute design mock with an interviewer briefed to change a requirement halfway, a tenfold traffic increase or a new strict consistency requirement, and to push on one number you estimated.
- Rehearse the two sentences a senior loop is listening for: naming the tradeoff you are choosing against and why, and saying what you would measure to learn that the choice was wrong.
- Prepare the design you regret: a real decision, the constraint that produced it, what it cost, and what you changed afterwards.
Deliverable: Mock notes recording how the design changed under the new requirement, plus a written account of one regretted decision.
Practice prompt ↗Worked solution ↗Expand any day for tasks and deliverables. Your progress is saved on this device.
When the requirements were thin, the interesting part is how you fenced the problem off: the assumption you wrote down, who you got to confirm it, the narrow version you shipped first so the rest stayed cheap to change. Guessing and being right is luck. Guessing in writing, where someone could correct you, is method.
Explain work related conflicts with examples.
Explain work related conflicts with examples.
Approach
- Name the disagreement and how you resolved it with evidence.
- Close with what you would do differently, concretely.
- Pick a story where you made the decision, not one where you watched it.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Share a difficult job situation and discuss how you handled it.
Share a difficult job situation and discuss how you handled it.
Approach
- Name the disagreement and how you resolved it with evidence.
- Pick a story where you made the decision, not one where you watched it.
- Close with what you would do differently, concretely.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe a time you had to work out of your comfort zone.
Describe a time you had to work out of your comfort zone.
Approach
- Name the disagreement and how you resolved it with evidence.
- Pick a story where you made the decision, not one where you watched it.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
- 01
Explain work related conflicts with examples.
- 02
Share a difficult job situation and discuss how you handled it.
- 03
Describe a time you had to work out of your comfort zone.
Is this an official ONEOK interview guide?
No. It is PracHub's own research and practice material for the Software Engineer role at ONEOK. Rounds and questions reflect what candidates have reported, not a process ONEOK has published, and they change over time. Confirm the current format and scope with your recruiter.
PracHub interview research ↗How long should I expect the interview process to take?
The process can vary, but it is often described as lengthy. Expect a few weeks to several months depending on the team's needs and current hiring volume.
PracHub interview research ↗Are there many technical questions during the interview?
It depends on the role, but many ONEOK interviews are heavily focused on behavioral and situational questions. However, be prepared for deep-dive technical questions if your role involves specialized hardware or systems.
PracHub interview research ↗How should I prepare for the "philosophical" questions?
These questions are about your ethics and your perspective on business. There is no "right" answer; the interviewer wants to see that you can think critically, remain professional, and align with the company's values.
PracHub interview research ↗Can I expect a remote or hybrid work environment?
Expectations vary by location and team. It is best to ask your recruiter about specific office requirements during your initial screening.
PracHub interview research ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01PracHub interview research ↗
PracHub editorial research into this company and role, maintained with this guide. Candidate-reported, not an employer publication.
PracHub page · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
Cross-company practice questions for this role.
PracHub page · Accessed 2026-09-22 - 03PracHub interview preparation framework ↗
The framework the preparation plan follows.
PracHub page · Accessed 2026-09-22