As a Software Engineer at RATP Dev, you are at the intersection of complex infrastructure and digital transformation. You are responsible for developing, maintaining, and optimizing the critical systems that keep transport networks running efficiently and safely. Your work directly impacts the reliability of public transit, ensuring that passengers reach their destinations and that operational assets are managed with precision.
This role is both challenging and intellectually rewarding because it requires a blend of software expertise and an understanding of physical engineering systems. You will contribute to projects that involve Communications & Control Systems, Asset Engineering, and the digitalization of civil infrastructure. By building robust software solutions, you will help RATP Dev maintain its commitment to operational excellence and technological innovation in the transport sector.
Application Review
reportedHalf of this call is the part candidates treat as small talk: start date, notice period, work authorisation and its timing, location and time zone, on-call, and the number. Those are what kill offers late, after several engineers have each spent a day. Surfacing a hard constraint now costs you nothing and occasionally buys you something, since a loop compressed to fit a competing deadline can usually only be arranged if it is asked for early. The common failure is deflecting the compensation question twice, then discovering at offer stage that the band never reached your number.
What to demonstrate
- Whether your hard constraints are compatible with the role before a loop gets booked: earliest start, notice period, what authorisation you hold and when it needs action, days on site, willingness to carry a pager
- Whether you give a compensation range with something behind it, such as current total compensation or a competing timeline, rather than leaving the band untested
- Whether your stated timeline is real, since a competing deadline raised now is something scheduling can sometimes work around and the same deadline raised at offer stage usually is not
How to prepare
- Write each constraint down in one line before the call and state them as facts rather than negotiating them live under a question you were not expecting
- Set your range from two or three current data points for that level and location, and name the structure you are quoting in, so the number is comparable to the one they are holding
- If another process is running, say where it stands and by when, and ask directly whether this loop can be scheduled inside that window
Initial Screening
reportedThe title covers product work, platform work, infrastructure, mobile and frontend, and those are different jobs with different loops behind them. A screening call is the cheapest place to find out which one the seat is, and asking reads as experienced rather than fussy. The questions that separate them: what the team is on call for, what the last three projects were, and whether any round happens inside an existing repository instead of a blank file. Then say which of that you have done and which you have not. Claiming the whole posting is the fastest way to be found out one round later.
What to demonstrate
- Whether you can locate your experience inside one flavour of the role honestly instead of claiming the entire requirements list
- Whether you name what you have not done, which an experienced screener reads as a level signal and can plan the loop around
- Whether what you want next matches what the seat is: someone who wants greenfield work landing on a team that mostly operates an existing system is a hire that leaves within the year
How to prepare
- Mark every line of the posting as done, adjacent or new, and write one sentence for each adjacent line naming the closest thing you actually built
- Split your last two years into rough percentages across feature work, operating and debugging live systems, and design or review, so a question about scope gets numbers rather than adjectives
- Bring three questions that discriminate between seats: what the team is paged for, how much of the work is changing existing code versus standing up something new, and what shipped in the last quarter
Technical Assessment
reportedWhat this round decides is narrow: whether you can produce code that runs and is correct on inputs nobody showed you. An elegant solution that does not compile scores below a plain one that does, so write a correct brute force first, say out loud that you know its cost, and improve it with the working version still on screen. What separates strong answers is who finds the broken case. Trace your own code against an empty input, a single element, and duplicate keys before you say you are finished, because being told is far more expensive than noticing.
What to demonstrate
- Whether degenerate inputs get checked without being asked for: an empty collection, one element, every element equal, and the extreme value the input type allows
- Whether the complexity you state matches the code you actually wrote, including a sort or a copy sitting inside a loop
- Whether the finished answer is verified against the worked examples before you call it done, rather than assumed correct because the code reads correctly
How to prepare
- Take five problems you have already solved and, without running anything, write down what each returns for empty input, a single element, and all-duplicates. Then run them and count how many you predicted wrong.
- Drill the brute force as its own skill: on ten problems, write only the obviously-correct slow version and time how long it takes to get it passing. If that is more than a few minutes, that is what to practise, not the optimal version.
- Add a fixed last step before you submit anything, reading only the loop bounds and the initial value of each accumulator, which is where most off-by-one errors live
Collaborative Problem-Solving
reportedBecause the format is not fixed, the first job in the room is classification. Listen to the opening question and decide what it is: a probe into work you have already described, a fresh problem to solve now, or a conversation about how you operate. Each wants a different register, and the common failure is forcing a rehearsed structure onto a question that did not ask for it. Running a full design ritual on a ten-minute debugging question reads as not listening. When you cannot tell which it is, ask how long they want to spend and answer at that depth.
What to demonstrate
- Whether the shape of your answer matches the question, so a yes-or-no gets answered before it is justified and an open prompt gets a direction before a detour
- Whether you check how much depth is wanted instead of deciding for them, and whether you stop when the answer is complete rather than continuing until someone interrupts
- Whether you can be redirected in the middle of an answer without restarting it from the beginning
- Whether a question outside your experience gets an honest boundary followed by reasoning from what you do know, instead of a confident answer with nothing behind it
How to prepare
- Rehearse one project at three lengths, roughly thirty seconds, three minutes, and a full walkthrough at the depth of a design review, and practise switching between them when someone interrupts mid-telling
- Have someone ask you five questions of deliberately mixed type in one sitting without telling you the types, and score only whether you identified each one correctly before you started answering
- Draft the sentence you will use to check depth, along the lines of asking whether the short version is useful here or they want the detail, and use it in a real conversation this week so the day of the round is not its first outing
Final Selection
reportedNobody in the room with you decides this. Interviewers typically write their rounds up separately, often before seeing anyone else's, and the outcome is settled later from those write-ups. A split panel gets resolved by whichever note carries specific evidence, so what you want out of each room is one concrete thing that person could write down: a bug you caught yourself, a trade-off you named, a decision you owned. The rest is arithmetic. The project you describe in a behavioural conversation is often the same system you sketched an hour earlier, and the two accounts have to agree.
What to demonstrate
- Whether the scale, team size and timeline you attach to a project hold steady when that project resurfaces in a different round
- Whether each interviewer leaves with a specific thing to cite rather than a general impression of competence
- Whether a trade-off you defended in one round survives a challenge in another, instead of being quietly swapped for the answer the new interviewer seemed to want
- Whether a question you have already answered earlier in the day gets the same answer at the same depth, without visible impatience
How to prepare
- Write a one-page sheet per project fixing the figures you will quote — request volume, data size, team size, elapsed time, what broke — and say them aloud from the sheet until they come out identical every time
- For each round on the schedule, decide in advance the one sentence you want in that person's notes, then check in a mock that you said it outright instead of leaving it to be inferred
- Have someone ask you the same project question twice, an hour apart, and diff the two answers for numbers that moved or a trade-off that reversed
PracHub editorial advice for the preparation topics above.
Running a schema change as though the lock lasts as long as the statement
In PostgreSQL an ALTER TABLE that needs an ACCESS EXCLUSIVE lock must first wait for every open transaction touching that table, and while it waits, later queries needing a conflicting lock queue behind it rather than overtaking it. A DDL statement that would execute in milliseconds, issued while a thirty-second analytics query is open, therefore stalls all traffic on that table for thirty seconds: the outage length is set by the longest open transaction, not by the change. The defences are specific and worth knowing by name - set lock_timeout low and retry rather than queue, add columns without a volatile default so no table rewrite occurs (from version 11 a non-volatile default is a metadata-only change), build indexes with CREATE INDEX CONCURRENTLY while accepting that it cannot run inside a transaction block and leaves an invalid index behind if it fails, and add constraints as NOT VALID followed by a separate VALIDATE CONSTRAINT, which takes a weaker lock.
Assuming an isolation level prevents the anomaly you actually have
Isolation levels are named by the SQL standard but implemented differently, so any claim about one is only true of a named engine. PostgreSQL defaults to READ COMMITTED, where every statement takes a fresh snapshot, so two statements inside one transaction can legitimately disagree about the same row. Its REPEATABLE READ is snapshot isolation: it removes non-repeatable and phantom reads but permits write skew, where two transactions each read a set, each conclude their own write is safe, both commit, and the combined result violates a constraint that no single row expresses. Only SERIALIZABLE closes that, and it closes it by aborting a transaction with a serialization failure (SQLSTATE 40001), which means the guarantee is theoretical unless the application has a retry loop. InnoDB's REPEATABLE READ is a different mechanism again - plain SELECTs read a consistent snapshot while locking reads and writes see the latest committed row - so a read-modify-write inside one transaction can act on a value that the transaction's own earlier SELECT never returned.
Assuming the input fits in memory
Ask how large the input is in bytes before committing to an in-memory algorithm; beyond that point the options are a single streaming pass, an external sort with bounded buffers, or a sketch that trades exactness for constant memory. An algorithm that assumes random access to the whole input is a different algorithm from one that sees each element once.
Sharing mutable state with no stated owner
Say which thread, request or task owns each mutable structure, and what protects it when the answer is more than one: a lock, a queue that hands ownership across, or an immutable copy per reader. A structure documented as safe for concurrent reads is usually not safe for a concurrent write alongside those reads.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Identify the heaviest tenants in a five-minute window under memory pressure
The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.
Approach
- Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
- Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
- State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
- Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
- Choose and defend it: at 50,000 tenants the exact rings cost under 100 MB in a process that already holds more, so ship exact. Keep the sketch for the case that actually motivates it, a per-principal or per-IP key where cardinality runs to millions and is not bounded by anything you control.
- Raise the fleet problem before it is asked: each of 20 to 40 instances sees only its share, and the top 50 of one shard is not the top 50 of the fleet. Either aggregate counts centrally or accept that a per-instance threshold multiplied by instance count is the limit you are really enforcing.
Follow-up
- The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
- Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
- You switch to per-principal keys and cardinality goes to 10 million. Walk through what changes.
Find overlapping job attempts and peak concurrency from lease records
A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.
Approach
- Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
- For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
- For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
- Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
- State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
- Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.
Follow-up
- A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
- Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
- How would you compute both answers incrementally as records arrive rather than in a daily batch?
Diff a projection against the primary without per-row point reads
The listing projection has drifted and some rows show a stale version. The primary holds 40,000,000 resource rows across 12,000 tenants while serving 1,200 writes and 14,000 reads per second. The obvious repair, reading each resource row and comparing its version against the projection, is correct and would eventually finish. Explain precisely why it is unacceptable here, then give a diff that finds the differing rows, state its complexity, and make it safe to run against a live primary. Replication lag is usually under 100 ms and is not bounded.
Approach
- Quantify the naive cost rather than calling it slow: 40,000,000 point reads at even 0.5 ms each is over five hours serialised, and the only lever is concurrency, which is exactly what you cannot spend. The primary's pool is sized for the write path, and 40,000,000 random reads evict the buffer cache that sustains the 85 percent cache hit rate, so the audit degrades the system it is auditing.
- Replace random access with one ordered pass per side. Both sides can be read in (tenant_id, resource_id) order, which is a sequential scan on each and a merge join in O(n) time and O(1) memory. For a dense diff that is the whole answer, and it reads the primary once instead of 40,000,000 times.
- For the expected sparse case, compare range hashes instead of rows: partition the key space, compute per range an order-independent aggregate over hash(resource_id, version), compare aggregates, and descend only into ranges that differ. With d differing rows and branching factor B, at most d ranges mismatch per level, so the drill-down examines O(d log_B(n/d)) ranges and reads full rows only in mismatching leaves.
- Aggregate with a sum modulo 2^64 or a multiset hash, never XOR. XOR is order-independent but self-cancelling, so two rows wrong in the same way, or a row duplicated on one side, leave the range aggregate matching and the range is declared clean.
- Pin the comparison to a point in time or it reports lag as drift: consider only rows whose updated_at is older than now minus a lag margin, and re-check each candidate mismatch individually before repairing. At 1,200 writes per second a diff without this reports thousands of false positives, and an unattended repairer would then overwrite live rows with stale values.
- Make the run resumable and throttled: batch by range key, persist the last completed range, and watch a signal such as replica lag or primary CPU, pausing rather than pressing on. A reconciliation that cannot be stopped and resumed gets killed halfway and restarted from zero, which is how a repair becomes an incident.
Worked solution 35 min
- Compute the naive cost explicitly at 40,000,000 reads and 0.5 ms each, then at 100 concurrent, and state what those connections do to a pool already carrying 1,200 writes per second.
- Write the merge-join version over (tenant_id, resource_id) and state its memory.
- Define the range aggregate: the range key, the per-row hash input, and the combining function, with one sentence excluding XOR.
- Work an example with 40,000,000 rows, branching factor 256 and 5 differing rows, and count the ranges examined.
- Add the watermark filter and the resume point, and name the throttle signal the loop watches.
Follow-up
- The diff reports 900 stale rows. How do you decide between patching those rows and rebuilding the projection from resource_revision?
- Same job, but the projection lives in a search index that cannot be scanned in key order. What changes?
- How would you run this continuously at low cost instead of only as incident response?
Hold a per-tenant active cap against concurrent creates
A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.
Approach
- Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
- Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
- Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
- State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
- For the job case the invariant is expressible per row, so let the database hold it: a partial unique index on job_run (tenant_id, job_type) WHERE status IN ('queued','running') makes a second running export unwritable and the loser takes 23505, mapped to 409. That is strictly better than a counter — no drift, no reconciliation — and it is available only because the cap is one rather than fifty.
- Add the retry discipline each route demands: under SERIALIZABLE both 40001 and deadlock 40P01 are retryable and the retry must re-execute the read, while under READ COMMITTED with the counter nothing retries, because the conflict is reported to the caller rather than raised as an error.
Worked solution 35 min
- Reproduce with two sessions that both count 49, both insert and both commit, at READ COMMITTED and then at REPEATABLE READ; record the final active count for each.
- Repeat both sessions at SERIALIZABLE and record which SQLSTATE the loser receives and at which statement it is raised.
- Implement the counter form and run a 20-way concurrent create against a tenant sitting at 45 active resources.
- Implement the partial unique index for the job case and race 20 enqueues of the same export.
Follow-up
- A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
- The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
- How do you detect after the fact that the counter drifted, without locking the table?
Explain why the owner filter ignores the listing index
The only index on resource is (tenant_id, status, updated_at DESC, resource_id DESC). A new endpoint returns one user's resources across all statuses, newest created first: WHERE tenant_id = $1 AND owner_user_id = $2 ORDER BY created_at DESC LIMIT 20. On a tenant with 2M rows it takes 900 ms and EXPLAIN shows a sort above a large scan. Explain precisely why the existing index cannot serve it, give the index that can, and state which of these the new index still will not help: owner_user_id alone across tenants; the same query ordered by updated_at. PostgreSQL 16.
Approach
- Separate the two jobs an index does. For filtering, a composite btree is seekable only on a left prefix, so with no predicate on status the scan can at best range over tenant_id and test owner_user_id per row; PostgreSQL 16 has no btree skip scan to jump the unconstrained column.
- For ordering, the index is sorted by (status, updated_at) within a tenant and not by created_at, so the LIMIT cannot stop early: every matching row is read and then sorted. That is the 'Sort Method: top-N heapsort' line, and it is why the plan reads 2M rows to answer with 20.
- Derive the replacement from the access path — equality, equality, then the ordering column: CREATE INDEX CONCURRENTLY ON resource (tenant_id, owner_user_id, created_at DESC). The scan seeks to the (tenant, owner) range and walks 20 entries in order, so the Sort node disappears along with the row-read.
- Treat INCLUDE (title, status) as conditional, not free. An index-only scan still visits the heap for any row whose page is not marked all-visible, so on a table taking 1.2k writes/second the win depends on autovacuum keeping the visibility map current, and the wider index costs more on every insert.
- Answer the two negatives explicitly. owner_user_id alone is not a left prefix of the new index, so it degrades to a full scan of the index at best. Ordered by updated_at, the query still seeks on the (tenant, owner) pair but must sort, because only created_at is ordered within that pair.
- Measure both sides with EXPLAIN (ANALYZE, BUFFERS) and compare estimated against actual rows at the lowest node — a 2M-versus-200 misestimate there is usually what chose the plan, and adding an index will not fix a statistics problem.
Follow-up
- 90% of rows are status='active'. Would a partial index WHERE status = 'active' change your answer, and for which of the three queries?
- A dashboard runs this for 40 owners in one page load. What changes about the design?
- How do you roll this index out on a table taking 1.2k writes/second, and what does it cost on every insert from then on?
How do you balance the need for rapid deployment with the requirement …
How do you balance the need for rapid deployment with the requirement for high-stability systems?
Approach
- Work from the requirement backwards to the design.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
What is your process for troubleshooting legacy systems while implemen…
What is your process for troubleshooting legacy systems while implementing modern updates?
Approach
- Say what you would check first and why it is the highest-information step.
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
How do you ensure the reliability and availability of software systems…
How do you ensure the reliability and availability of software systems that control critical infrastructure?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Rebuild the search projection while it serves nine thousand queries
The read-model service answers about 9k queries/second at a 120 ms p99 from a projection built off the event log, normally under 2 seconds behind. A mapping change forces a full rebuild from resource_revision, during which apply lag rises to minutes. Writes continue at 1.2k/second and events at 4k/second. Design the rebuild: how the new index is populated and cut over, how position is tracked per log partition, what the API returns alongside results so a client can tell a stale answer from a current one, and the criterion for cutting over.
Approach
- Build into a second index and swap an alias rather than mutating the live one. The rebuild is then reversible by pointing the alias back, so a bad mapping costs a wasted rebuild instead of an outage. The price is peak storage for two full copies and double apply load during catch-up, and both numbers should be stated up front rather than discovered when disk fills.
- Track position per log partition, not globally. Order is guaranteed only within an aggregate's partition, so progress is a vector, and the only number safe to publish is taken from the least advanced partition - the slowest one is what bounds completeness. Publishing the most advanced partition's position declares the projection current while another partition sits twenty minutes behind.
- Make apply idempotent so the backfill and the live tail can overlap without a freeze. Each document records the aggregate_version it reflects, and any event at or below that version is discarded. This is why the event carries the full fact and not a delta: a delta cannot be discarded safely, and a consumer that calls back to read current state applies a state newer than the event it is processing, which is how a projection ends up with changes applied out of order.
- Turn lag into a contract instead of a surprise. Return the watermark with every result set, and return the version produced by a write so the client can compare the two. A client that wrote version 7 and receives results at a watermark older than its own commit can show that its change is still landing, rather than rendering the previous value as current. Blocking the read until the projection catches up would convert a staleness problem into an availability problem at 9k queries/second, and choosing not to do that is the trade.
- Define the cutover numerically. Writes are untouched by the rebuild - they commit to the primary and land in the outbox - so the only coupling is apply throughput. If catch-up applies slower than the 4k events/second arriving, it never converges. The cutover criterion is that lag is measurably decreasing and below a stated threshold, not that the backfill loop reached the end of its range.
Worked solution 30 min
- Write the rebuild sequence: snapshot source, populate the second index, attach the live tail, verify, swap alias, retire the old index - naming what is reversible at each step.
- Define the per-partition position record and the single watermark derived from it, and show what each would report when one partition stalls.
- Write the idempotent apply rule using the document's recorded aggregate_version, and replay one event twice against it.
- State the cutover threshold in lag terms and the measurement that shows convergence rather than completion.
Follow-up
- The rebuilt index disagrees with the primary tables for 300 documents. Which is authoritative, and how do you decide without freezing writes?
- The rebuild doubles load on the log and pushes the projection p99 from 120 ms to 400 ms. What do you throttle, and which signal sets how much?
- Clients start polling until the watermark passes their write. What does that do at 9k queries/second, and what do you offer instead?
One customer endpoint stalls deliveries to every other destination
The egress service delivers about 1.5k webhooks/second across 40,000 destinations, with a per-destination concurrency cap of 4 and a 10-second connect-plus-read timeout. Throughput falls to 300/second, queue depth climbs, and p99 delivery latency for unaffected destinations goes from 200 ms to minutes, while the error rate barely moves. One tenant holds 900 destination rows whose URLs share a hostname that now answers in 9.5 seconds. Explain the mechanism with the arithmetic, then give the containment in the order you would apply it.
Approach
- Look at saturation before errors. A flat error rate with collapsing throughput says nothing is failing, things are waiting, so the first signal to pull is in-flight request count or pool wait time rather than the error counter. This is the distinction that decides the whole investigation.
- Group in-flight work by resolved host, not by destination id. The cap is keyed per destination row, so 900 rows sharing one hostname buy 3,600 concurrent slots against a single host, each held for 9.5 seconds. The bulkhead was never a bulkhead for that host, and grouping by the wrong dimension is why the dashboard looked healthy.
- Do the arithmetic in both directions. Required concurrency is arrival rate times latency, so 1.5k/second at 200 ms needs about 300 in flight, which is entirely consumed by 3,600 slow slots; conversely whatever concurrency is left sustains rate equals concurrency divided by 9.5 seconds, which is the 300/second you are seeing. Matching both numbers is what promotes this from a plausible story to the mechanism.
- Explain why the circuit breaker never helped. It opens on consecutive failures, and a 9.5-second response inside a 10-second timeout is a success. Slow is not failing, so an error-rate breaker cannot see this; you need a slow-call ratio, a deadline propagated from the caller's remaining budget, or a concurrency limiter.
- Contain in order: park the offending host so the shared pool drains, add a per-resolved-host concurrency cap alongside the per-destination one, give slow hosts their own queue so they cannot occupy the general pool, derive the timeout from the delivery deadline rather than a round number, and check the retry policy is not tripling load on a host that is already slow. Use backoff with full jitter so retries do not resynchronise on recovery.
- State the invariant you are restoring: one tenant's endpoints degrade only that tenant's deliveries. That is a property to load-test for, not to assume from a config value.
Follow-up
- The host recovers to 80 ms. How long does the queue take to drain, and what does the drain do to the recovered host?
- Where should the 10-second timeout number actually come from?
- If that tenant had one destination row instead of 900, would the cap of 4 have saved you? What would you measure to be sure?
Four days sample coding, design, fundamentals and the practical rounds at deliberately shallow depth, which is enough to surface the topics you did not know were in scope. That map, rather than a guess made on day one, decides where the last three days go.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Coding, one pass at shallow depth
- Solve one problem from each of six families, an array with two pointers, hash counting, binary search, a tree traversal, a graph traversal and one dynamic program, under a hard twenty-minute cap with no extensions, marking each finished, late, or stalled.
- For every stall, write the exact move you could not make rather than the subject, so the note reads could not turn the recurrence into a loop rather than bad at dynamic programming.
- Fix nothing today. The value of the pass is the unfixed record.
Deliverable: Six timed attempts marked finished, late or stalled, each stall carrying a named blocking move.
Practice prompt ↗Practice prompt ↗Worked solution ↗02Design, one pass at shallow depth
- Spend twenty minutes each on three different shapes, a read-heavy feed, a write-heavy ingest path, and something needing a transaction across two entities, stopping each at requirements, interface and data model.
- After each, write the first question you could not answer, which is usually a number you could not estimate or a failure mode you had no vocabulary for.
- Mark which of the three you would be most relieved not to be asked, and treat that as data rather than as a preference.
Deliverable: Three shallow designs, each with the first unanswerable question written at the bottom.
Practice prompt ↗Practice prompt ↗03Fundamentals and the practical rounds
- Answer eight short questions in writing at four minutes each, covering the material that fills the gaps between the big rounds: what happens between a URL and a rendered page, what an index costs on write, when a process is preferable to a thread, and what conditions a deadlock requires.
- Do one thirty-minute practical task of the kind a take-home compresses: read an unfamiliar two-hundred-line file and write what it does, what you would change, and the one thing you remain unsure of.
- Score every answer fluent, correct but slow, or absent, and keep the absent ones visible.
Deliverable: Eight scored short answers and one written reading of unfamiliar code.
Practice prompt ↗Practice prompt ↗04The rounds that are about you, and the map
- Deliver three behavioural answers aloud against a timer, a conflict, a failure you owned, and a decision made without enough information, marking any that ran past three minutes or contained no number.
- Assemble the map: every marked item from days one to three on a single page, sorted by how likely it is to appear in your loop rather than by how uncomfortable it felt.
- Choose exactly two areas for the remaining three days and write down what you are deliberately abandoning.
Deliverable: A one-page scored map of the whole surface area with two areas chosen and the rest explicitly abandoned.
Practice prompt ↗Practice prompt ↗Worked solution ↗05First chosen area, to the depth you skipped
- Work the higher-ranked area in four focused blocks, choosing items one level above where you stalled rather than repeating what already works.
- After each block write the rule you extracted in one sentence with its precondition attached, since a rule carrying no precondition is exactly what fails under a variation.
- Re-attempt the day-one or day-two item that exposed this area and compare against the original timing.
Deliverable: Four worked blocks, a timed re-attempt against the original, and three one-sentence rules with preconditions.
Practice prompt ↗Practice prompt ↗06Second chosen area, where the gap is coverage rather than speed
- Treat the second area differently from the first. Day five drilled something you could already half-do; this one is usually a topic you had simply never met, so build one worked reference example end to end and keep it, rather than attempting six problems badly.
- Write down the vocabulary you were missing on day two or three, five terms at most, each with the one sentence that makes it usable in an answer rather than the textbook definition.
- Redo the shallow attempt that exposed this area and note whether you now fail later in the problem, because moving the failure point is the realistic gain from a single day and is worth more than a score that did not change.
Deliverable: One worked reference example for the newly covered area, a five-term vocabulary list, and a note on where the failure point moved.
Practice prompt ↗Practice prompt ↗07Reassemble the loop
- Sit two rounds back to back with no gap, ordering them so the area you chose second comes last, because the map was built from rested, isolated attempts and the loop will reach your weaker area when you are already spent.
- Write where the second round suffered from the first, which is normally the point at which structure collapses into narration.
- Reduce the week to one page holding only the rules you can state without reading them.
Deliverable: Mock notes on cross-round carryover plus a one-page card of rules you can recite from memory.
Practice prompt ↗Worked solution ↗Expand any day for tasks and deliverables. Your progress is saved on this device.
Engineers over-index on what they repaired. A stronger answer covers something you knowingly left broken: the alert you tuned down, the data inconsistency you documented instead of chasing, the cleanup you deferred past two quarters. Give the reasoning and the condition that would have reopened it, so it reads as a decision and not as neglect.
How do you handle technical debt when working on long-term infrastruct…
How do you handle technical debt when working on long-term infrastructure projects?
Approach
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
- Pick a story where you made the decision, not one where you watched it.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
Can you describe your experience with Communications & Control Systems…
Can you describe your experience with Communications & Control Systems integration?
Approach
- Close with what you would do differently, concretely.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
Follow-up
- What did you decide not to do, and why?
- How did you know your change caused the improvement?
Unblock an engineer without taking the keyboard
A teammate has spent two days on a job handler that occasionally writes duplicate rows. They are certain the queue is delivering twice by mistake. You suspect a lease expiring under a slow handler, so the job is running concurrently with itself. Describe how you have unblocked someone in this position: what you asked before offering a hypothesis, what you showed them rather than told them, and what you left them owning. Then say what you would do if their theory turned out to be the right one.
Approach
- Ask before diagnosing, and ask for things answerable from data they already have: the attempt count on the job rows that produced duplicates, the handler's observed duration against its lease expiry, and whether the duplicate rows share a natural key that a unique constraint could have caught.
- Teach the shape rather than the answer. A lease cannot distinguish a dead worker from a slow one, so a handler that outruns its lease is running twice by design, and deploys deliver the other half by killing handlers mid-run on every rollout. Both of their candidate theories produce identical duplicate rows, which is why the evidence has to come from timings rather than from argument.
- Hand over a checklist they execute: a natural key on every write the handler performs so the second copy collides rather than appends, the record of intent written before any external effect, a lease heartbeat while running, and the metric that shows it working.
- Keep ownership with them deliberately. Pair on the first write, then step back; if you finish it yourself you have closed one ticket and left the same person stuck on the next redelivery.
- Close on the systemic gap that let two days pass, which is usually a missing dashboard for attempt counts or an undocumented at-least-once contract, and fix that rather than only the bug.
Follow-up
- How would you distinguish a genuine double-delivery from a lease expiry using only the data already stored?
- Their handler calls an external endpoint before recording that it did. What do you tell them to change first?
- What do you do the third time the same person brings you the same class of bug?
- 01
How do you handle technical debt when working on long-term infrastructure projects?
- 02
Can you describe your experience with Communications & Control Systems integration?
- 03
A teammate has spent two days on a job handler that occasionally writes duplicate rows. They are certain the queue is delivering twice by mistake. You suspect a lease expiring under a slow handler, so the job is running concurrently with itself. Describe how you have unblocked someone in this position: what you asked before offering a hypothesis, what you showed them rather than told them, and what you left them owning. Then say what you would do if their theory turned out to be the right one.
Is this an official RATP Dev interview guide?
No. It is PracHub's own research and practice material for the Software Engineer role at RATP Dev. Rounds and questions reflect what candidates have reported, not a process RATP Dev has published, and they change over time. Confirm the current format and scope with your recruiter.
PracHub interview research ↗Is there a specific technical stack I should focus on?
While RATP Dev uses a variety of tools, focus on demonstrating mastery of your core language and a strong grasp of system architecture principles. Adaptability to the company's specific toolchain is valued over memorizing specific niche libraries.
PracHub interview research ↗How long does the process typically take?
The timeline can vary, but generally, you should expect a few weeks from the initial screen to a final decision. Candidates report that the process prioritizes finding the right fit for the team, which involves thorough evaluation.
PracHub interview research ↗What differentiates successful candidates?
Successful candidates are those who show curiosity about the broader transport ecosystem. They don't just solve the ticket in front of them; they think about how their work improves the overall passenger experience.
PracHub interview research ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01PracHub interview research ↗
PracHub editorial research into this company and role, maintained with this guide. Candidate-reported, not an employer publication.
PracHub page · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
Cross-company practice questions for this role.
PracHub page · Accessed 2026-09-22 - 03PracHub interview preparation framework ↗
The framework the preparation plan follows.
PracHub page · Accessed 2026-09-22