A Software Engineer at Skalar operates at the intersection of high-level product strategy and rigorous technical execution. Whether you are joining as a Founding Engineer, a Product Engineer, or a Senior Full-Stack Engineer, your work is foundational to the company’s mission. You are not merely writing code; you are building the architecture that defines how the business scales and how users interact with Skalar platforms.
The environment at Skalar is characterized by a blend of technical autonomy and collaborative problem-solving. As a member of the engineering team, you will tackle complex challenges that require a deep understanding of full-stack development, system reliability, and product-market fit. This role is ideal for engineers who thrive in fast-paced, mission-driven environments where individual contributions have a direct, visible impact on the end product and long-term company trajectory.
Skalar emphasizes a culture of ownership. Be prepared to discuss not just how you write code, but why you make specific architectural choices to support business goals.
Initial Screening
reportedBefore anything technical happens, someone has to decide which rung of the ladder your loop is calibrated to, and that decision sets the bar for every round after it. It comes from how you describe scope, not from your title, because titles do not convert cleanly between companies. The weak version of the answer is team size and years. The strong version names the largest change you shipped where nobody reviewed the design, what would have broken if you had been wrong, and what you were paged for. Get the level said out loud on this call, because the range and the loop both follow from it.
What to demonstrate
- Whether the scope in your own account maps onto a level the team actually has an opening at, so a mismatch ends the process cheaply rather than after four interviewers have spent a day
- Whether your title needs re-mapping: the same word describes very different amounts of independent decision-making at a twenty-person company and a ten-thousand-person one
- Whether your compensation expectation can be filled at that level in the structure the role pays in, which is why the number gets asked for before any engineer is scheduled
How to prepare
- Write down two changes from the last two years: the largest one you designed with nobody reviewing the design, and the largest one where someone more senior did. Lead with the first when scope comes up, and be ready to say which parts of the second were yours
- Ask which level the loop is calibrated to and what changes at the level above it, then plan your weeks from that answer rather than from the posting
- Settle a total-compensation range beforehand with the split named, base against bonus against equity and its vesting period, so a question about numbers gets a number instead of the word market
Technical Evaluations
reportedInput bounds are the part of the prompt most often skimmed, and they usually contain the answer. They tell you which complexity class is admissible, which narrows the search before you have thought about the problem itself. As a rough planning figure, a compiled language does on the order of 10^8 simple operations per second and an interpreted one roughly an order of magnitude less. So n up to about twenty admits enumerating subsets, a few thousand admits a quadratic pass, and a million admits neither: you need near-linear, or linear with a log factor. If the bounds are missing, ask for them.
What to demonstrate
- Whether the approach is justified by the stated input size rather than by whichever pattern you recognised first
- Whether you ask about the properties that change the algorithm: whether the input arrives sorted, whether duplicates occur, whether values are bounded integers, whether it all fits in memory
- Whether you can name the bottleneck in your own solution and what would remove it, even when you deliberately leave it in place
- Whether a claimed speedup is real, since memoising a recursion only helps when subproblems genuinely overlap and the state can be keyed cheaply
How to prepare
- For each algorithm you rely on, write down the largest n it handles in roughly a second, then check two of those figures by timing them in the language you will actually type in
- For two weeks, write one line naming your target complexity and the bound that justifies it before you write any code, then compare that line with what you ended up submitting
- Practise the conversion backwards: given a required O(n log n), list the mechanisms that get you there (sorting, a heap, an ordered map, divide and conquer) and choose by what the problem needs to query, not by what you used last
Take-Home Assignments
reportedNobody is in the room when this is read, so the submission stands in for what an ordinary pull request from you would cost to review. That makes navigability the first thing being judged. A reader should reach the code that does the actual work within a minute of cloning, without tracing three layers of indirection to get there. What most separates a strong submission from a weak one is separation itself: the logic that implements the prompt kept apart from file reading, argument parsing and printing, so each piece can be read, and tested, on its own.
What to demonstrate
- Whether the entry point makes the shape of the program obvious: what is read, what is computed, what is written, in that order
- Whether the core logic can be called without touching the filesystem, a socket or stdin, since that is what makes it testable at all
- Whether names hold up on a second reading; a function called parse that also writes, or a total that means something different from the README, costs the reader more than a longer name would have
- Whether the commit history reads as a sequence of steps someone could follow, rather than one commit containing everything
How to prepare
- Clone your own finished submission into an empty directory and read it in the order a stranger would, README then entry point then downward, noting every place you rely on something the code never told you, and fix those places
- Take an exercise you have already solved and restructure it so the module holding the rules imports no file, CLI or network library, leaving input parsing and output as a thin shell around it
- Build the history while you work, committing at points where the tests pass, so the log shows the order you actually solved the problem in
Team Interactions
reportedWhen a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.
What to demonstrate
- Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
- Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
- Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
- Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened
How to prepare
- Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
- Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
- Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure
Final Decision
reportedA day like this is several different games in a row, and the expensive mistake is carrying the previous one into the next room. Coding rewards narrow precision and finishing inside a timer. Design rewards breadth, stated assumptions and naming what you are deliberately not building. Behavioural rewards specificity about people and decisions. Candidates who over-engineer a coding problem they were supposed to finish, or who start sketching class hierarchies before anyone has agreed what the system has to do, are usually still playing the last round. Between rooms, name out loud which game the next one is.
What to demonstrate
- Whether the coding round ends with something that runs and has been traced against a degenerate input, rather than an extensible design that was never finished
- Whether a design discussion opens by agreeing on traffic shape, read-to-write ratio and what is allowed to be stale, instead of proceeding from an architecture you arrived with
- Whether a behavioural answer names a person, a disagreement and what you did about it, rather than describing the system the story happened inside
- Whether the opening habits still appear late in the day: restating the problem, asking for constraints, saying the plan before typing
How to prepare
- Book three mocks of different types back to back on one afternoon and ask each interviewer afterwards which round you answered in the wrong mode
- Write a three-line opening script per round type — coding: restate, name the approach and its cost, then type; design: ask for scale, read-write mix and what must not break; behavioural: name the person, the stakes and the decision — and run it off a card so the switch is mechanical rather than remembered
- Practise coding with a timer you do not extend, stopping when it stops, so the trained reflex is to finish a correct solution rather than to keep improving one
PracHub editorial advice for the preparation topics above.
Paginating a growing table with limit and offset
Two unrelated defects share the idiom. Correctness: rows inserted or deleted between page requests shift the window, so a consumer walking an export skips rows and sees others twice, which for a customer-facing sync is silent data loss rather than an error anyone notices. Cost: the database still produces and discards the skipped rows, so page N costs time proportional to N times the page size and a deep page on a large table degrades from milliseconds to seconds. Keyset pagination over a stable, unique, indexed ordering -- where (created_at, id) < ($1, $2) order by created_at desc, id desc limit $3 -- is constant-cost per page and immune to shifting, on the precondition that the cursor columns never change value for a row, which disqualifies updated_at as a cursor.
Checking a quota with a select and then writing
Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.
A queue or buffer with no bound
Every producer-consumer boundary needs a capacity and a policy for reaching it: block the producer, shed load, or drop the oldest entry. Unbounded buffering converts a temporary slowdown into memory exhaustion and hides the backpressure signal that would have revealed the consumer was falling behind.
Going silent while thinking
Narrate the candidates and why you are discarding them, even in fragments: sorting first would make this a two-pointer scan, but it destroys the original indices, which the output needs. From the other side of the table, a candidate thinking hard and a candidate stuck are indistinguishable until one of them speaks.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Parse and verify a timestamped multi-signature webhook header
An inbound webhook carries a signature header of at most 1 KiB shaped t=<unix seconds>,v1=<64 hex chars>, with up to five v1 values during secret rotation and possibly unknown scheme keys. You hold the raw request body bytes and the currently active signing secrets. Write the parser and the verifier: accept when any active secret reproduces a signature and the timestamp is within a five-minute tolerance in either direction, reject otherwise. Single left-to-right pass over the header, no regular expression. State what is inside the MAC and why.
Approach
- Parse in one scan: split on
,, then on the first=only, since a value may itself contain=under a future scheme. Accepttexactly once and treat a secondtas a reject rather than last-wins. Push everyv1onto a short list and ignore any other key, so av2can be introduced later without breaking this verifier. - Say what is signed: HMAC-SHA256 over the exact byte string
<t>.<raw body bytes>, yielding 32 bytes or 64 hex characters. The timestamp sits inside the MAC because otherwise an attacker replays yesterday's body with its still-valid signature and only has to edit the header timestamp. - Hash the bytes as received. Verifying against a re-serialised JSON body is the usual defect: key order, whitespace and number formatting all change the bytes while the parsed objects compare equal, so signatures fail for honest senders and the popular 'fix' is to stop checking.
- Compare in constant time over fixed-length digests. Decode the hex to 32 bytes, accumulate
acc |= a[i] ^ b[i]across the whole length, and testacc == 0at the end. Evaluate every candidate without an early exit; at five candidates that is five HMACs over the body, linear in body size and negligible beside the network. - Apply the tolerance as a two-sided bound, rejecting when
|now - t| > 300seconds. A sender whose clock runs ahead of yours is an ordinary case, and an unbounded future timestamp is a free replay window. - Complexity: O(L) over the header producing k candidates, plus k HMACs at O(|body|) each. Space is O(k) beyond the body itself. Do the cheap rejections, including the tolerance check, before any cryptography runs.
Worked solution 15 min
- Write the grammar on one line before coding:
header := field (',' field)*,field := key '=' value, split on the first=only. - Implement the parser to return
{t: int, v1: [hex, ...]}, rejecting a missingt, a duplicatet, anyv1that is not 64 hex characters, and a header over 1 KiB, all before any cryptography runs. - Implement the verifier: for each active secret compute
HMAC-SHA256(secret, f'{t}.'.encode() + raw_body), compare it in constant time against each parsedv1, and OR the results with no early exit. - Test with a valid signature; the same body with
tmoved 400 seconds into the past; the same body witht400 seconds into the future; a header carrying an unknownv2=alongside a validv1; and a body re-serialised with different JSON key order.
Follow-up
- The body is 40 MB. What changes about where you verify, and what can you do before the whole body has arrived?
- A customer reports that signatures fail for exactly the requests whose body contains a non-ASCII character. What is your first hypothesis?
- How do you rotate the signing secret with no failed deliveries, and how long do both secrets stay live?
Order a job dependency graph and find its critical path
A workspace defines up to 50,000 jobs with up to 200,000 dependency edges and an estimated duration_seconds per job. Given the edge list, reject the graph if it contains a cycle and name one cycle's nodes; otherwise return a valid execution order, the earliest possible completion time with unlimited workers, and the set of jobs whose slack is zero. Then say which single job to shorten in order to cut the completion time, and by exactly how much. State the complexity of each part.
Approach
- Kahn's algorithm for the order: compute indegrees, seed a queue with zero-indegree nodes, emit and decrement. O(V + E), which at 50,000 and 200,000 is milliseconds. If fewer than V nodes are emitted, the graph contains a cycle.
- Kahn detects a cycle but cannot name one. The nodes left with indegree above zero contain every cycle, so run one DFS restricted to that residual subgraph with three-colour marking and report the stack slice from the grey node the back edge points at. That is the difference between a usable error message and 'dependency cycle detected'.
- Earliest completion with unlimited workers is the longest path, which is NP-hard on a general graph and linear on a DAG. State the precondition, then relax in topological order:
earliest_finish[v] = duration[v] + max(earliest_finish[u] for u in preds(v)), taking the max over an empty predecessor set as zero. The makespan T is the maximum over all nodes. O(V + E). - Second pass in reverse topological order for
latest_finish, thenslack[v] = latest_finish[v] - earliest_finish[v]. Zero-slack nodes form the critical path, and there can be several disjoint critical paths, so return the set rather than one chain.slack[v] = 0is exactly the statement that some longest path runs through v; equivalently, the longest path through v has lengthT - slack[v]. - The speed-up bound is the point of the question, and the obvious form of it is wrong. Shortening a zero-slack job v by d, with 0 <= d <= duration[v], cuts the makespan by
min(d, T - L_avoid(v)), whereL_avoid(v)is the longest path in the graph with v deleted: the longest path that avoids v, not the second-longest path overall. The two coincide only when the runner-up path misses v. Counterexample: A of 10 s feeds both B of 5 s and C of 4 s, so T = 15 s and the second-longest path is 14 s, yet shortening A by 10 s leaves a makespan of 5 s. The realised gain is the full 10 s, because both paths ran through A and shrank together, whilemin(10, 15 - 14)predicts 1 s. The reason is structural: shortening v reduces every path through v by d and leaves every other path alone, so the new makespan ismax(T - d, L_avoid(v)). - Compute
L_avoid(v)the direct way: delete v and re-run the same forward relaxation, O(V + E) per candidate. The cheaper equivalent skips the deletion, sinceL_avoid(v)only ever matters through that max: setduration[v] := 0, recompute the makespan asT0(v) = max(T - duration[v], L_avoid(v)), and the gain ismin(d, T - T0(v)), which is identical for every d <= duration[v]. Only zero-slack jobs are candidates, because shortening a job with positive slack changes the completion time not at all. One relaxation is milliseconds at this size, so ranking a critical set in the hundreds costs O(k(V + E)) and is worth doing exactly; a critical set in the tens of thousands is not, and there you evaluate a shortlist, longest jobs first, and say that the answer is the best of that shortlist rather than the optimum.
Follow-up
- Only m workers are available. What happens to your answer, and what can you still promise about the schedule you produce?
- Edges arrive incrementally as the customer edits the pipeline. How do you detect a cycle at insert time without re-running Kahn over 250,000 elements?
- Durations are estimates. How would you express completion time as a distribution, and what breaks about the critical path once you do?
Find peak concurrent sandbox usage from run intervals
Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.
Approach
- Turn each run into two sweep events,
(started_at, +1)and(end, -1), then sort the 2n events by timestamp with-1ordered before+1at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap. - Decide each null out loud before sweeping, because each choice moves the answer. A null
started_atmeans queued and contributes nothing. A nullfinished_atwith statusrunningorleasedis clipped to the window end. Statuslosthas no observed end at all, so clip it atstarted_at + wall_clock_limit_secondson the grounds that the supervisor owns the timeout, and record that you did. The table'scheck (finished_at is null or started_at is not null)guarantees you never see an end without a start. - Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update
peak_atonly on a strict increase, or you will report the last such instant instead of the earliest). Capture the firstrun_idwhose+1takes the counter to C+1 during the same sweep rather than in a second pass. - Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by
started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on(tenant_id, started_at). - If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.
Follow-up
- Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
- The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
- How would you answer 'peak concurrency within any 5-minute window' without re-sorting?
Migrate a live partitioned event table without blocking ingest
usage_event is range-partitioned daily on ingested_at, holds roughly 250M rows per day across 400 live partitions, and is written at 10-40k rows/second. Two changes are required: quantity must move from double precision to numeric(20,6), and a new environment column must become NOT NULL with a default of 'production'. Ingest cannot stop. Give the ordered plan, naming for each step the lock it takes, what that lock blocks, and roughly how long it is held. Identify the one step that cannot be rolled back cleanly once traffic depends on it.
Approach
- Classify the two changes before planning anything. Adding a column with a non-volatile default has been metadata-only since PostgreSQL 11, so it is cheap. Changing double precision to numeric is not binary-coercible, so
alter column ... typerewrites every partition under ACCESS EXCLUSIVE and rebuilds its indexes; on this volume that is hours of blocked ingest and is simply not an option, which is why the plan is expand-and-contract rather than one statement. - Expand: add
quantity_numeric numeric(20,6)andenvironmentwith its default on the parent. Both are catalogue-only but both take a brief ACCESS EXCLUSIVE that cascades to partitions, so run each withlock_timeoutset to a second or two and retry on failure. A queued ACCESS EXCLUSIVE request blocks every reader behind it, which is how a metadata-only change turns into an outage. - Dual-write: deploy producer code that populates both columns on every insert, and leave it running before anything reads the new column. This is the step that cannot be reverted cleanly. Once readers depend on quantity_numeric, reverting the writer leaves rows with a null there, and the gap is only discoverable by re-reading the old column, which the readers have stopped doing.
- Backfill older partitions in batches keyed on the primary key, oldest first, committing every few thousand rows with a pause between batches, and skipping the partition still receiving writes until it rotates. Each batch is an ordinary UPDATE taking row locks only. The cost is bloat and WAL rather than blocking, so watch dead tuples and let autovacuum keep pace instead of wrapping 400 partitions in one transaction.
- Make NOT NULL cheap with the three-step form:
add constraint ... check (environment is not null) not valid(brief ACCESS EXCLUSIVE, no scan), thenvalidate constraint(SHARE UPDATE EXCLUSIVE, scans while reads and writes continue), thenset not null, which from PostgreSQL 12 uses the validated check and skips its own full scan. Do this per partition, then on the parent. - Switch and contract: move reads to the new column behind a flag, verify over a full period that both columns agree on freshly written rows, drop the old column (metadata-only), and only then remove the dual-write. Any index on the new column goes on with CREATE INDEX CONCURRENTLY per partition, since CIC is not supported on a partitioned parent: create the parent index with ONLY, build each child concurrently, then ALTER INDEX ... ATTACH PARTITION until the parent index becomes valid.
Follow-up
- A CREATE INDEX CONCURRENTLY fails halfway through the partition list. What state is the table in, how do you detect it, and what do you run?
- The producer computes quantity itself. What happens to a request already in flight when the dual-write deploy lands, and does it matter?
- Give two queries that prove the backfill is complete: one cheap enough to run every minute, one authoritative.
Find the join that inflates every invoice total
invoice_line_item holds line_id, invoice_id, tenant_id, sku, rate_tier, quantity, unit_price_micros, amount_minor (bigint), currency, kind, voided_at. invoice_payment_attempt holds attempt_id, invoice_id, tenant_id, amount_minor, status (succeeded, failed, pending), created_at, and an invoice has many attempts. A finance report runs select i.invoice_id, sum(l.amount_minor), count(p.attempt_id) from invoice i join invoice_line_item l using (invoice_id) join invoice_payment_attempt p using (invoice_id) group by 1 and the totals are wrong. Say precisely what the sum now equals, and write a version that is also correct for invoices with zero attempts.
Approach
- Compute what the query actually returns before fixing it. The two joins form a Cartesian product per invoice, so each line row repeats once per attempt row:
sum(l.amount_minor)is the true total multiplied by the attempt count, andcount(p.attempt_id)is attempts times lines. Three lines and two attempts report double the money and six attempts. - Reject the reflex repair.
count(distinct p.attempt_id)does fix the count, because attempt_id is unique.sum(distinct l.amount_minor)does not fix the sum, because two legitimate lines with equal amounts collapse into one. DISTINCT inside an aggregate deduplicates values, not rows, and the difference stays invisible until two lines happen to match. - Aggregate each branch to invoice grain before joining: one CTE summing lines by invoice_id, one counting attempts by invoice_id, then join the two results. A LATERAL subquery per invoice is equivalent and sometimes plans better when the outer set is small. Either way every aggregate stays at the grain it was defined at.
- Keep invoices with no attempts by making the attempt branch a LEFT JOIN with
coalesce(attempt_count, 0). An inner join here silently drops every unpaid invoice, which is usually the exact population finance is asking about. - Push each filter to its own grain:
where l.voided_at is nullbelongs inside the line CTE, not the outer query, or it would also filter the attempt branch through the join. Put the tenant predicate on both branches, since the denormalised tenant_id is what stops a wrong join crossing tenants. - Leave yourself a standing check: an invoice total is a function of its non-voided lines and of nothing about payments, so if changing the payment filter moves the money figure, the fan-out is back.
Worked solution 25 min
- Create one invoice with three lines of 1000, 1000 and 500 minor units and two payment attempts, then run the original query.
- Confirm it reports 5000 and 6 rather than 2500 and 2.
- Apply
sum(distinct l.amount_minor)and confirm the total becomes 1500, which is worse rather than better. - Write the two-CTE version with a LEFT JOIN and coalesce, and confirm 2500 and 2.
- Add a second invoice with lines and no attempts and confirm it still appears.
Follow-up
- Add a third branch for credit notes applied to the invoice. Does the CTE shape still hold, and when would a single pass with
filter (where ...)be better? - Over 500k invoices this report takes minutes. Which grain would you materialise, and how do you keep it correct when a line is voided?
- The same report is needed per tenant per month. What index makes the line CTE cheap?
How do you ensure code quality and maintainability in a fast-moving, a…
How do you ensure code quality and maintainability in a fast-moving, agile environment?
Approach
- Name the read and write paths separately; they rarely have the same bottleneck.
- Fix the scope first: who calls this, how often, and what they do when it fails.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- How does this behave when that dependency is down for an hour?
- What would you drop to keep the system up under load?
How would you design a scalable microservices architecture for a high-…
How would you design a scalable microservices architecture for a high-traffic application?
Approach
- Choose a partition key and say what query it makes expensive.
- Name the failure you are designing for, then the recovery path.
- Fix the scope first: who calls this, how often, and what they do when it fails.
Follow-up
- What would you drop to keep the system up under load?
- What breaks first when traffic grows ten times?
Describe a challenging technical bug you encountered and the systemati…
Describe a challenging technical bug you encountered and the systematic approach you used to resolve it.
Approach
- Name the read and write paths separately; they rarely have the same bottleneck.
- Choose a partition key and say what query it makes expensive.
- Fix the scope first: who calls this, how often, and what they do when it fails.
Follow-up
- How does this behave when that dependency is down for an hour?
- What would you drop to keep the system up under load?
How do you balance the need for rapid feature delivery with the necess…
How do you balance the need for rapid feature delivery with the necessity of technical debt reduction?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
Follow-up
- How would you know your answer was wrong?
- What assumption would you test first?
If you were tasked with migrating a legacy system to a new stack, what…
If you were tasked with migrating a legacy system to a new stack, what would be your step-by-step plan?
Approach
- Work from the requirement backwards to the design.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Sealing a billing period against late-arriving usage
billing seals a tenant's period once the metering watermark passes the period end, prices the sealed rollups against the plan (included allowance, tier boundaries, negotiated discount) and writes invoice_line_item rows: quantity numeric(28,6), unit_price_micros bigint, amount_minor bigint, currency char(3), source_rollup_watermark timestamptz. The job is re-run after failures and two workers may attempt the same tenant. Events legitimately arrive with occurred_at inside the period and ingested_at after it. Specify the seal transition, the idempotency key for every write including the payment-processor call, the rounding position and mode, and the fate of a post-seal event.
Approach
- Make sealing a conditional write rather than a read followed by a write: UPDATE usage_rollup_hourly SET status = 'sealed', sealed_at = now() WHERE tenant_id = $1 AND hour_start >= $2 AND hour_start < $3 AND status = 'open' RETURNING rollup_id. Two concurrent sealers cannot both win because the loser's predicate no longer matches, and the loser learns it lost from an empty result rather than from a lock timeout.
- Gate the seal on the watermark, not on the clock - the period closes when the fold is trustworthy past period_end - but cap the wait, because an unsealed period blocks the whole billing run. Seal anyway after a stated maximum (six hours past period end is a reasonable default) and let whatever arrives afterwards become an adjustment. The trade-off is named in one line: adjustments are cheap, a missed billing cycle is not.
- Make every write converge under re-run. Line items are idempotent on (invoice_id, sku, rate_tier) with ON CONFLICT DO UPDATE permitted only while the invoice is draft; the payment-processor call carries (tenant_id, billing_period_start) as its idempotency key, because a timeout there is an unknown outcome, not a failed one, and a plain retry is how a customer gets charged twice.
- Keep the arithmetic exact and round exactly once. quantity stays numeric, the rate is an integer unit_price_micros in millionths of a minor unit because per-request prices are genuinely below a cent, and amount_minor = round_half_even(quantity x unit_price_micros / 1,000,000) is computed once per line and stored. Tiering walks the boundaries in order emitting one line per (sku, rate_tier) with tier 0 as the included allowance at price zero; the invoice total is the sum of stored amount_minor values and is never recomputed downstream from quantity and rate.
- Handle the post-seal event as a forward-only correction. The sealed rollup is frozen, so the difference between the sealed value and the restated value becomes a new invoice_line_item with kind = 'adjustment' and voided_by_line_id pointing at the line it reverses, carrying its own source_rollup_watermark. Nothing is edited in place, because the original line is the only evidence of what the customer was actually charged and is precisely what a dispute, a refund or an audit asks to see.
Worked solution 35 min
- Write the seal as a single conditional UPDATE ... WHERE status = 'open' RETURNING and state exactly what the losing worker sees.
- Price one line by hand: quantity 4,318,904.250000 at unit_price_micros 1200 gives 5,182.6851 minor units and 5,183 after a single half-even rounding. Then do quantity 2,500,000.000000 at unit_price_micros 1, which lands exactly on 2.5 and rounds to 2 under half-even but 3 under half-up.
- Take four hundred synthetic lines with fractional minor units and compute the total two ways - sum of per-line rounded amounts, and a single rounding of the summed exact amounts - then record the gap.
- Trace one event with occurred_at inside the period and ingested_at two days after the seal all the way to the row that eventually reflects it.
Follow-up
- Two workers start the same tenant's seal a millisecond apart and the winner crashes after sealing but before writing any line. What does the second worker observe, and is the resulting invoice correct?
- Show the divergence between rounding each line and rounding the total once over four hundred lines, and say which direction it goes.
- A customer disputes a charge from two quarters ago. Which rows answer it, and which single design decision made that answer possible?
Gateway p99 spikes on a five-minute cadence
edge-gateway caches each credential-to-authorisation-context decision for five minutes. p99 sits at 6 ms except for a spike to 900 ms roughly every five minutes, worst in the region with the most pods, and control-plane CPU and read latency rise in step with it. The error rate stays near zero. Customers are told a revoked credential stops authorising within 60 seconds. Give the ordered checklist that identifies the mechanism, and a fix that removes the spike without weakening the 60-second bound.
Approach
- Test periodicity before anything else: take the spike timestamps modulo the TTL in seconds. A tight cluster at a fixed offset means expiry phase, while traffic-driven spikes scatter.
- Overlay pod start times. Entries filled at first request inherit the phase of the pod that filled them, so a cohort of pods deployed together expires together and the amplitude should track cohort size rather than tenant count.
- Separate a herd from a capacity shortfall by measuring control-plane requests per second during a spike against baseline. A stampede shows a step of roughly (pods x hot keys) for one interval with hit rate collapsing to near zero, not a gradual climb that would indicate the dependency is simply undersized.
- Apply three independent controls: randomise each key's TTL by a factor drawn uniformly from something like 0.8 to 1.0 so cohorts de-phase; coalesce concurrent misses per key per pod so exactly one refresh is in flight; and serve the stale value while that refresh runs so a miss costs the stale read rather than the dependency's queue.
- Bound staleness against the published contract rather than against comfort: serve-stale is admissible only up to the 60-second revocation bound, so the TTL floor and the stale window together must stay inside it, and the published invalidation must delete the entry rather than schedule a refresh.
- Decide in advance what a miss does when the control plane is unreachable, because that is now the only uncached path: failing closed converts a dependency outage into a total outage, while extending stale service past the bound breaks the revocation promise. Pick one and configure it explicitly.
Follow-up
- Publish-subscribe invalidation is lossy under a partition. Given that, what actually enforces the 60-second bound, and what number would you put in the contract if asked to defend it?
- One tenant's key is hot enough that a single pod's coalesced refresh still matters. What changes?
- Would a shared cache tier in front of the control plane help or shift the problem, and what new failure does it add?
For someone fluent in a dynamic language who has shipped real work but has never had to say what the runtime is doing underneath. The week is built on measuring and deliberately breaking things, because the questions that expose this background are the ones where the interviewer asks why a second time.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Measure before reasoning
- Take a slow piece of your own code, write down in advance where you believe the time goes, then profile it and record how wrong the guess was. The cost is usually an allocation you did not notice or an accidental quadratic membership test.
- Replace one list membership test inside a loop with a set and measure at a thousand, ten thousand and a hundred thousand elements, confirming the shape of the curve rather than only that it got faster.
- Write down the three quantities you can now measure instead of assert: wall time, peak memory, and call count for the function you suspected.
Deliverable: A before-and-after profile of real code plus a written note on the size of the gap between the guess and the measurement.
Practice prompt ↗Practice prompt ↗Practice prompt ↗Worked solution ↗02References, copies, and the bugs they produce
- Write the function with a mutable default argument, call it three times, and explain the accumulating result: the default is evaluated once when the function is defined, so every call shares one object.
- Build a nested structure, take a shallow copy, mutate an inner element, and show that both views changed, because a shallow copy duplicates the container and not the elements. Then fix it with a deep copy and state the cost you just accepted.
- Write two functions, one mutating its argument in place and one rebinding the local name, and predict the caller's view of each before running it. That single distinction produces most of the bugs that pass their tests.
Deliverable: Three small programs whose output you predicted correctly before running, each with a one-line statement of the rule underneath.
Practice prompt ↗Practice prompt ↗03Types, once, in a language that checks them
- Port one module you have already written, roughly a hundred lines, into a statically typed language, and record every place the compiler demanded an answer your original had left implicit: a value that can be absent, a numeric width, a case never handled.
- Write the same signature in both languages and state what the static one guarantees before the program runs and what it does not, since it will not save you from a wrong algorithm or an index out of range.
- Write the difference between an interface satisfied by declaration and one satisfied structurally, with one case each where the other approach would miss the mistake.
Deliverable: One module in two languages plus a list of the questions the type checker forced you to answer.
Practice prompt ↗Practice prompt ↗04Concurrency, starting with what actually runs at the same time
- Run the same CPU-bound function across four threads and four processes and measure both. Under the default CPython build the threaded version will not speed up, because only one thread executes bytecode at a time; the process version will. Check which build you are on first, since free-threaded builds remove that lock and change the result.
- Then run a blocking I/O workload across four threads and measure it speeding up, because the interpreter releases that lock around blocking calls, which is why treating threads as useless is wrong as a general claim.
- Build the lost update: two threads each incrementing a shared counter a hundred thousand times, and show a final value below the expected sum, because an increment is a load, an add and a store and the thread can be suspended between them. Fix it with a lock and then measure what the lock costs.
Deliverable: Three measurements, threads against processes on CPU work, threads on I/O work, and a demonstrated lost update, each with the mechanism written underneath.
Practice prompt ↗Practice prompt ↗Worked solution ↗05Debugging as a procedure rather than an instinct
- Work one real failure as a bisection: find a revision or an input size where it is good and one where it is bad, halve repeatedly, and state the two assumptions bisection needs, that the property changes exactly once across the range and that the test is reliable.
- Minimise one failing input to the smallest version that still fails, and record how many rounds it took.
- Keep a hypothesis log for one bug in three columns, what I believe, what would disprove it, what I observed, and stop yourself the first time you are about to change two things at once.
Deliverable: One bug worked to root cause with a written hypothesis log and a minimised reproducing input.
Practice prompt ↗Practice prompt ↗06Tests that catch the bug you are about to write
- Implement an LRU cache with a capacity bound, then write the three test cases that would catch an off-by-one in eviction: insert exactly capacity items and assert nothing was evicted, insert one more and assert the least recently used key is the one gone, and read an old key just before that insert so the eviction victim changes.
- Add a property test comparing your implementation against a deliberately slow reference, an ordered list scanned linearly, over a few thousand random operation sequences, because a slow reference finds the cases you would not have thought to write.
- Write one numeric test that fails under exact equality and passes with a tolerance, and state why the tolerance has to be relative rather than absolute once the magnitudes grow.
Deliverable: An LRU implementation with three boundary tests, one property test against a slow reference, and one tolerance-based numeric test.
Practice prompt ↗Practice prompt ↗07Debug something broken, out loud
- Have someone plant three defects in a two-hundred-line program, an off-by-one, a shared mutable state bug, and a wrong error-handling path, then find them while narrating, under a fixed rule: state the hypothesis before touching anything.
- Time each one and record which tool found it, reading, a printed value, a debugger, or a test, because the question asked in interviews is how you would find it rather than what it was.
- Write the sentence you will use when you do not yet know the cause, one that names the next measurement instead of offering a guess.
Deliverable: A recorded debugging session with time-to-find per defect and the method that found each.
Practice prompt ↗Practice prompt ↗Worked solution ↗Expand any day for tasks and deliverables. Your progress is saved on this device.
Nobody is scoring your stamina at three in the morning. What carries weight is which signal told you something was wrong, what you measured before touching anything, what you rolled back versus what you fixed forward, and why you picked one. 'We restarted it and it went away' is a story about not knowing.
Describe a situation where you had to mentor a junior developer or lea…
Describe a situation where you had to mentor a junior developer or lead a technical initiative.
Approach
- Close with what you would do differently, concretely.
- State the situation in two sentences and spend the rest on the reasoning.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
Tell me about a time you had a disagreement with a product manager or …
Tell me about a time you had a disagreement with a product manager or designer. How did you resolve it?
Approach
- Name the disagreement and how you resolved it with evidence.
- State the situation in two sentences and spend the rest on the reasoning.
- Pick a story where you made the decision, not one where you watched it.
Follow-up
- What did you decide not to do, and why?
- How did you know your change caused the improvement?
What motivates you to work at an early-stage or product-focused compan…
What motivates you to work at an early-stage or product-focused company like Skalar?
Approach
- Give the blast radius: what could have broken, and what you measured.
- Pick a story where you made the decision, not one where you watched it.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- What did you decide not to do, and why?
- 01
Describe a situation where you had to mentor a junior developer or lead a technical initiative.
- 02
Tell me about a time you had a disagreement with a product manager or designer. How did you resolve it?
- 03
What motivates you to work at an early-stage or product-focused company like Skalar?
Is this an official Skalar interview guide?
No. It is PracHub's own research and practice material for the Software Engineer role at Skalar. Rounds and questions reflect what candidates have reported, not a process Skalar has published, and they change over time. Confirm the current format and scope with your recruiter.
PracHub interview research ↗How much time should I dedicate to preparation?
Dedicate at least 1–2 weeks of focused study, specifically targeting system design and your primary programming language, to perform at your best.
PracHub interview research ↗What differentiates successful candidates at Skalar?
Successful candidates demonstrate a high degree of technical curiosity and a clear ability to articulate the business value of their engineering decisions.
PracHub interview research ↗Is the work environment remote or on-site?
Skalar offers varied configurations; verify the specific location requirements (e.g., Remote UK or München) listed in your specific job posting.
PracHub interview research ↗What is the typical timeline from initial screen to offer?
The process is designed to be efficient but thorough; most candidates complete the cycle within 3–5 weeks.
PracHub interview research ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01PracHub interview research ↗
PracHub editorial research into this company and role, maintained with this guide. Candidate-reported, not an employer publication.
PracHub page · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
Cross-company practice questions for this role.
PracHub page · Accessed 2026-09-22 - 03PracHub interview preparation framework ↗
The framework the preparation plan follows.
PracHub page · Accessed 2026-09-22
