THE 60-SECOND BRIEF

As a Software Engineer at SYSTRA, you are stepping into a pivotal role within a global leader in engineering and consultancy for transport and infrastructure. Your work directly impacts the efficiency, safety, and sustainability of complex transit networks. Whether you are building internal tooling to optimize structural analysis or developing software solutions for large-scale engineering projects, your contributions are the digital foundation that enables physical infrastructure to function reliably.

Prepare in one language you know well enough to debug in rather than the one you think reads best. Under a clock an unfamiliar language costs you standard-library lookups and iteration mechanics, and that time comes out of your thinking budget, not your typing budget.

SYSTRA candidates report 2 rounds · ≈ 2-4 weeks. The stages below are what candidates describe, not a published process.

Make every write idempotent under client retriesScope every query and cache key by tenantBound blast radius with per-tenant concurrency limits

34 min read

Browse Software Engineer questions

See the practice prompts

13Practice promptsAcross five skill areas
3With worked solutionsIncluded in the practice prompts

As a Software Engineer at SYSTRA, you are stepping into a pivotal role within a global leader in engineering and consultancy for transport and infrastructure. Your work directly impacts the efficiency, safety, and sustainability of complex transit networks. Whether you are building internal tooling to optimize structural analysis or developing software solutions for large-scale engineering projects, your contributions are the digital foundation that enables physical infrastructure to function reliably.

This role requires a unique blend of technical proficiency and domain-specific problem-solving. At SYSTRA, software is rarely built in a vacuum; it must interface with physical systems, safety requirements, and rigid regulatory standards. You will collaborate with multidisciplinary teams—including structural, systems, and safety engineers—to translate complex technical requirements into high-performance software applications. This is an environment where precision is paramount, and your code will play a critical role in delivering world-class transportation solutions.

01

Initial Screening

reported

The title covers product work, platform work, infrastructure, mobile and frontend, and those are different jobs with different loops behind them. A screening call is the cheapest place to find out which one the seat is, and asking reads as experienced rather than fussy. The questions that separate them: what the team is on call for, what the last three projects were, and whether any round happens inside an existing repository instead of a blank file. Then say which of that you have done and which you have not. Claiming the whole posting is the fastest way to be found out one round later.

What to demonstrate

  • Whether you can locate your experience inside one flavour of the role honestly instead of claiming the entire requirements list
  • Whether you name what you have not done, which an experienced screener reads as a level signal and can plan the loop around
  • Whether what you want next matches what the seat is: someone who wants greenfield work landing on a team that mostly operates an existing system is a hire that leaves within the year

How to prepare

  • Mark every line of the posting as done, adjacent or new, and write one sentence for each adjacent line naming the closest thing you actually built
  • Split your last two years into rough percentages across feature work, operating and debugging live systems, and design or review, so a question about scope gets numbers rather than adjectives
  • Bring three questions that discriminate between seats: what the team is paged for, how much of the work is changing existing code versus standing up something new, and what shipped in the last quarter
PracHub interview research ↗
02

Technical Sessions

reported

The same problem is scored by two different mechanisms depending on the format, and preparing for one does not cover the other. With a person watching, partial progress is visible and a hint is a correction you can absorb; silence is the expensive failure, because nobody can read a half-written function. With an automated grader there is no partial credit for what you were about to do, nobody to ask, and the worked examples in the prompt are the entire specification. Read them as a contract, down to whether an empty result should be an empty list or no output at all.

What to demonstrate

  • In a live session, whether your commentary tracks what your hands are doing, and whether a hint redirects you or gets defended against
  • In an automated one, whether you cover the cases the examples do not show, since the hidden cases are where the score moves
  • Whether you manage the clock on purpose: abandoning an approach that is not converging while there is still time to write something simpler that finishes

How to prepare

  • Have someone hand you a problem and feed you one deliberately wrong hint. Practise testing it against a concrete case instead of accepting or rejecting it on authority.
  • Do one timed run a week in a plain browser editor with autocomplete, linting and your own snippets switched off, which is closer to what these environments give you
  • For the automated format, write the harness before the solution: a main that feeds the worked examples plus an empty and a single-element case and prints expected against actual, so a wrong submission is caught by you first
PracHub interview research ↗

PracHub editorial advice for the preparation topics above.

01

Treating a timed-out write as a failed write

A timeout says the response did not arrive, not that the work did not happen; the server may well have committed and then lost the connection. Retrying a non-idempotent create after a timeout is the standard way to end up with two of something, and those duplicates land precisely when the system is already degraded and least able to absorb them. The discipline is to treat a timeout as unknown: either the write carries an idempotency key so the retry is safe by construction, or the client re-reads authoritative state before deciding what to do, and the interface says unknown rather than showing a failure that invites a second click.

02

One shared connection pool for every tenant and every query class

A single tenant with a large table and a missing index can occupy every connection with slow queries, and every other tenant then waits in connection acquisition -- a queue invisible in database metrics, because the database itself looks healthy while the application starves. Containment is bulkheads: separate pools or per-tenant concurrency caps for interactive requests, background jobs and exports, a statement timeout low enough that a pathological query dies before it accumulates, and an idle-in-transaction timeout so a stuck client cannot pin a connection and its locks indefinitely. One caveat worth knowing in advance: if a transaction-pooling proxy sits in front of the database, session-scoped behaviour changes, so session-level advisory locks and settings applied outside a transaction do not survive the way they do on a direct connection.

03

Choosing a schema before the access patterns are known

Write the queries first, with their filters, sort orders, cardinalities and which ones sit on the latency-critical path, then design tables and indexes to serve them. An index nothing queries still costs write throughput and storage, and a hot query with no supporting index becomes a full scan that only hurts once the table is big.

04

Tests that assert on the implementation rather than the behaviour

Assert on what a caller can observe, not on the number of internal calls or the shape of a private field. A test that breaks on every refactor but still passes when the answer is wrong costs more than it protects.

Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.

9 technical prompts3 include a worked solution

Seal an hour under late data with bounded memory

hardWorked solution
watermarkslate-dataquantile-sketchconditional-write

Metering ingest reads 256 partitions at 10,000 to 40,000 events/second. Events carry occurred_at and ingested_at, and during a producer replay the gap between them is hours. Seal each UTC hour once no more than 50 parts per million of that hour's eventual quantity can still arrive, using memory that does not grow with the size of the replay. Define the watermark, the lateness parameter and how you measure it, the structure holding open hours, and the write that performs the seal. State what an idle partition does to your watermark.

Approach
  1. Two clocks, two jobs. Bucket by occurred_at, because that is the hour the customer is billed for, and advance the watermark on ingested_at, because that is what the fold has consumed and what source_max_ingested_at records. Conflating them is what makes late data invisible.
  2. The global watermark is the min over partitions of each partition's committed ingested_at, not the max: the fold is trustworthy only as far as the slowest partition. The consequence is that one idle partition pins the watermark forever and nothing seals, so an idle partition must promote its watermark to wall clock after a stated idle timeout, and that timeout becomes a correctness parameter, because a partition that is slow rather than idle gets sealed past.
  3. Choose the lateness L from the measured distribution of ingested_at - occurred_at, weighted by quantity rather than by event count. The target is 50 ppm of the hour's quantity, and a replay is rare in events while carrying disproportionate mass, so an event-weighted quantile picks an L that is comfortably wrong at exactly the moment it matters.
  4. Measure that quantile in bounded memory. A Greenwald-Khanna summary gives epsilon-approximate quantiles in O((1/epsilon) log(epsilon n)) space; a t-digest costs more per merge but has relative error that tightens at the tails, which is the half of the distribution you are reading at p99.99. Keep a separate summary per tenant class, because one tenant's batch importer is not the population.
  5. Hold open hours in a min-heap keyed by hour_start. When the watermark advances, pop every hour with hour_end + L < W and seal it: O(log H_open) per advance and O(1) amortised per event to touch its bucket. Memory is open hours multiplied by distinct (tenant, workspace, sku) keys, so cap the number of simultaneously open hours and spill the oldest into usage_rollup_hourly as status='open' with a revision bump. While an hour is open the row is upsertable, so the store is your overflow.
  6. The seal itself is a conditional write: update ... set status='sealed', sealed_at=now() where status='open' returning .... Two sealers race on every restart, and the loser must see zero rows and stop rather than write a second value. After the seal, an event for that hour is not an upsert but an adjustment, and source_max_ingested_at is what proves it arrived afterwards.
Worked solution 40 min
  1. Replay a day of events with a synthetic lateness distribution: 99.9% under two minutes, plus a 0.05% tail at four to six hours that carries 3% of total quantity.
  2. Compute the p99.99 lateness two ways, event-weighted and quantity-weighted, and put the two numbers side by side.
  3. Implement the min-heap of open hours with the watermark as the min over 256 partitions, then stall one partition for 20 minutes and observe what seals.
  4. Set the idle-partition timeout to 60 seconds, repeat the stall, and measure how much quantity arrives after the seal.
  5. Attempt the seal from two workers at once and confirm the conditional update lets exactly one through.
EXPECTED RESULTThe quantity-weighted p99.99 is hours larger than the event-weighted one. Choosing L from the event-weighted number lets roughly the tail's 3% of quantity land after the seal, 600 times the 50 ppm target. With the min watermark and no idle timeout, the stalled partition blocks all sealing; with a 60-second timeout, the stall is sealed past and its events arrive late.
Follow-up
  • A replay starts during the sealing window for a period you are about to close. What do you do, and what is the customer-visible consequence of each option?
  • Your measured quantity-weighted p99.99 lateness is six hours and the invoice must be issued at 02:00 UTC on the first. How do you reconcile those two numbers?
  • How would you detect that L has drifted before it costs you an hour's quantity?

Fold a deduplicated usage stream into hourly rollups

easy
aggregationdeduplicationwatermarksexact-arithmetic

You are given one day of usage_event rows, up to 250 million, each carrying event_id, tenant_id, workspace_id, environment, sku, quantity numeric(20,6), idempotency_key, occurred_at and ingested_at. Produce usage_rollup_hourly cells keyed (tenant_id, workspace_id, sku, hour_start) with quantity_sum, event_count and source_max_ingested_at. An event counts once per (tenant_id, idempotency_key). The rollup grain has no environment column, so state your filter. One pass. Give your time and space bounds, and say what the deduplication actually costs in memory.

Approach
  1. Bucket on occurred_at, never ingested_at: hour_start = date_trunc('hour', occurred_at at time zone 'UTC'). The two columns answer different questions. occurred_at says which hour the customer is billed for; ingested_at says how current the fold is. Using the second for the first makes late data invisible instead of correctable.
  2. The fold is trivial and the deduplication is the entire cost, so price it before designing anything clever. An exact set over (tenant_id, idempotency_key) at 250M entries, stored as a 16-byte 128-bit hash in an open-addressed table at 0.7 load factor, needs about 357M slots at 16 bytes each, roughly 5.7 GB. The fix is partitioning by hash(tenant_id) % P so each shard holds 1/P of the set and no tenant's keys straddle shards.
  3. Rule out a Bloom filter as a replacement, in the right direction: a false positive reports 'already seen' for an event never seen, so you drop a real event and lose revenue with no error raised. It is usable only as a negative pre-filter in front of the exact set, where a miss is conclusive and a hit must fall through to the real lookup.
  4. Accumulate in scaled integers, not binary floating point. numeric(20,6) admits values below 10^14, so one event scaled to micro-units can reach 10^20, past int64's 9.22 x 10^18; use a 128-bit or arbitrary-precision accumulator unless you first bound the per-event maximum. binary64 represents integers exactly only to 2^53, about 9.01 x 10^15, and cannot represent 0.1 at all, so two runs that sum in different orders disagree.
  5. Carry source_max_ingested_at = max(ingested_at) over the events folded into each cell, and count event_count over accepted, post-dedup events. Without that watermark there is no way to prove later what a number did and did not include, which is the first question any reconciliation asks.
  6. State the environment filter explicitly, because the rollup grain cannot record it. A fold that quietly includes staging bills non-production traffic; one that quietly excludes it loses a cost signal. Production-only is the billing answer, and either way it belongs in the job name and the output metadata. Complexity: O(n) time, O(distinct dedup keys) space, dominated by the dedup set rather than by the cells.
Follow-up
  • A producer retries at 23:59:59 and the retry lands at 00:00:01. The unique index on the daily-partitioned table must include the partition key. What gets double-counted, and what is the smallest change that fixes it?
  • The consumer acknowledges its batch before committing the fold. Which failure loses revenue now, and which arrangement duplicates instead?
  • What makes a re-run over the same day produce byte-identical rollups?

Hold a tenant to a trailing sixty-second request limit

medium
sliding-windowtwo-pointerrate-limitingtenant-skew

The gateway must hold each tenant to R requests in any trailing 60 seconds, in aggregate across three regions and every pod, within a budget of under 10 ms added p99. Peak is 30,000 requests/second across 200,000 active tenants, and traffic is heavily skewed toward a handful of them. Give an exact single-process algorithm with its amortised per-request cost and its memory per tenant, then a bounded-memory approximation and the worst-case overshoot it actually admits. Say what the distributed version does when the counter store is unreachable.

Approach
  1. Exact, single process: a per-tenant deque of request timestamps. On arrival, pop from the front while front <= now - 60s, then admit if the remaining length is below R and push. Each timestamp is pushed once and popped once, so the cost is O(1) amortised. The O(R) version is the one that re-filters the whole deque on every request.
  2. Quote the memory. R = 1,000 across 200,000 active tenants is up to 2 x 10^8 timestamps at 8 bytes, about 1.6 GB, and that is the worst case rather than the mean, because the long tail of small tenants holds almost nothing. Skew helps you here and hurts you in the sharding decision.
  3. Bounded alternative, with its real bound stated: a fixed 60-second counter is O(1) memory but admits close to 2R across a 60-second span straddling a boundary. The weighted two-bucket estimate, prev * (60 - elapsed)/60 + cur, is better on smooth traffic but assumes the previous window's arrivals were uniform; an adversary packing them at the end of that window is undercounted and can still approach 2R. Say that rather than calling it exact.
  4. Token bucket is the usual gateway answer and a different contract: O(1) state per tenant (tokens, last_refill), a sustained rate, and a deliberate burst allowance equal to the bucket size. Choose it when a burst is acceptable and the log when the limit is contractual.
  5. Distributed: the limit is per tenant in aggregate, so a local bucket of R/N per pod is wrong in both directions under skew. A tenant landing on one pod is throttled at R/N, and a tenant spread evenly across pods exceeds R. The shared check must be a single atomic round trip, one script or one increment-and-compare, never read-then-write, and it must fit inside the 10 ms p99 budget.
  6. Decide the unavailable case in advance and write it down. Failing open keeps the product up and lets a tenant exceed its limit for the duration; failing closed converts a counter-store outage into a full outage. Most gateways fail open on rate limits and closed on authorisation, and those are two separate decisions made separately.
Follow-up
  • One tenant sends 40% of all traffic. What does that do to a single counter key, and what do you shard on instead?
  • Quotas rather than rate limits: the check is select used; if used < limit then insert. Name the isolation level that still permits the overshoot, and the two fixes.
  • How do you return an accurate Retry-After from the exact algorithm without a second scan?

Day one measures instead of guessing, under a fixed rubric, and the remaining hours are allocated in proportion to the gaps before any studying begins. The allocation is deliberately not renegotiated midweek, because the area that feels worst on day three is usually the one that is moving.

Small steps. Visible outcomes.0 / 7 completed
ONE WEEK · YOUR PACE

Prepare, practise & reflect

One practical outcome each day. Spend longer where you need it.

0 / 7 done
01Diagnostic, scored before you study anything
  • Sit a 110-minute diagnostic in four blocks: forty-five minutes on two coding problems, twenty-five on one design prompt taken to interface and data model, twenty of short-answer fundamentals, and twenty delivering two behavioural answers aloud.
  • Score each block from 0 to 3 on a fixed rubric where 3 is correct and fluent, 2 is correct but slow or prompted, 1 is partially correct and 0 is stuck, grading the artifact rather than how the attempt felt.
  • Allocate days two to five in proportion to 3 minus each block's score, write the allocation down, and commit to leaving it alone.

Deliverable: A scored rubric and a fixed hour allocation for the rest of the week.

Practice prompt ↗Practice prompt ↗Worked solution ↗
02Largest gap: find the boundary rather than the subject
  • Split the weakest area into named sub-skills and rate each separately. For coding those are restating the problem, choosing the structure, stating the invariant, turning the invariant into loop bounds, handling empty and single-element input, and accounting for complexity out loud.
  • Attempt three items positioned just above where the rating drops off, and for each write the first move you failed to make.
  • Re-attempt one of them from blank four hours later with nothing open.

Deliverable: A sub-skill map with the two blocking sub-skills circled.

Practice prompt ↗Practice prompt ↗
03Drill the blocking sub-skill by repeating the shape
  • Do eight short repetitions of the same shape rather than eight different problems, so what gets practised is the pattern and not the puzzle.
  • State the rule you now hold in one sentence, then test it against a case built to break it, a sliding window over an array containing negative values, or a cache-aside read path whose invalidation message is dropped.
  • Have someone else read your one-sentence rule and find the precondition you left out.

Deliverable: One rule statement with its preconditions attached and one counterexample that would have caught the incomplete version.

Practice prompt ↗Practice prompt ↗
04Second gap, plus maintenance on the strongest area
  • Run the same sub-skill decomposition on the second-largest gap in half the time.
  • Spend twenty-five timed minutes on the block you scored highest, choosing the hardest item you can still finish rather than a warm-up.
  • Write whether each area fails you on recall, on setup, or on execution, and set the fix accordingly: repetition for recall, a written checklist for setup, timed work for execution.

Deliverable: A second sub-skill map plus a one-line failure diagnosis for each area.

Practice prompt ↗Practice prompt ↗Worked solution ↗
05The gap that is not a skill
  • Record one technical and one behavioural answer, then count two things in the playback: seconds before your first clarifying question, and sentences you began without knowing where they would end.
  • Practise saying that you do not know, followed by how you would find out, without letting it soften into a guess, and practise stating a complexity or an estimate before being asked for it.
  • Redeliver one answer under a hard ninety-second cap, which forces structure ahead of detail.

Deliverable: Two recordings with a counted reduction in time-to-first-question.

Practice prompt ↗Practice prompt ↗
06Retest under day-one conditions
  • Sit the same 110-minute structure with new prompts of comparable difficulty and score it on the identical rubric.
  • For any block that did not move, change the method rather than adding hours: a block stuck at 1 usually means the practice was too varied, not too short.
  • Write down which single block you would still lose the offer on.

Deliverable: A second scored rubric placed beside the first, with one named remaining risk.

Practice prompt ↗Practice prompt ↗
07Full loop under interview conditions
  • Run a sixty-minute mock over the two blocks that moved least, with an interviewer briefed to interrupt and change direction mid-answer.
  • Write the recovery script for going blank: restate the question, state your assumption, name the first thing you would check.
  • Say every rule from the week aloud without reading it, and cut any you cannot state in a single sentence, since a rule you have to reconstruct mid-answer will not survive an interruption.

Deliverable: A one-page card holding the recovery script and only the rules you could state from memory.

Practice prompt ↗Worked solution ↗

Expand any day for tasks and deliverables. Your progress is saved on this device.

Team size, service count and tickets closed say very little. Seniority shows in the decision you owned: what you chose not to build, which constraint you traded away, whose objection you had to resolve before anything could move. A large project where you executed someone else's plan is a small story.

Describe a time you had to optimize an algorithm to handle large datas…

medium
behavioural and engineering judgement

Describe a time you had to optimize an algorithm to handle large datasets more efficiently.

Approach
  1. Pick a story where you made the decision, not one where you watched it.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Close with what you would do differently, concretely.
Follow-up
  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?

Tell me about a time you had to explain a complex technical issue to a…

medium
behavioural and engineering judgement

Tell me about a time you had to explain a complex technical issue to a non-technical stakeholder.

Approach
  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Name the disagreement and how you resolved it with evidence.
  3. Pick a story where you made the decision, not one where you watched it.
Follow-up
  • What would you do differently if you ran that again?
  • How did you know your change caused the improvement?

How do you handle technical debt when working under strict project dea…

medium
behavioural and engineering judgement

How do you handle technical debt when working under strict project deadlines?

Approach
  1. Close with what you would do differently, concretely.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Name the disagreement and how you resolved it with evidence.
Follow-up
  • What would you do differently if you ran that again?
  • What did you decide not to do, and why?

How do you resolve disagreements with team members regarding architect…

medium
behavioural and engineering judgement

How do you resolve disagreements with team members regarding architectural decisions?

Approach
  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Name the disagreement and how you resolved it with evidence.
  3. Close with what you would do differently, concretely.
Follow-up
  • How did you know your change caused the improvement?
  • What would you do differently if you ran that again?
  • 01

    Describe a time you had to optimize an algorithm to handle large datasets more efficiently.

  • 02

    Tell me about a time you had to explain a complex technical issue to a non-technical stakeholder.

  • 03

    How do you handle technical debt when working under strict project deadlines?

  • 04

    How do you resolve disagreements with team members regarding architectural decisions?

PracHub interview preparation framework ↗
Is this an official SYSTRA interview guide?

No. It is PracHub's own research and practice material for the Software Engineer role at SYSTRA. Rounds and questions reflect what candidates have reported, not a process SYSTRA has published, and they change over time. Confirm the current format and scope with your recruiter.

PracHub interview research ↗
How long does the interview process typically take?

The process is designed to be thorough but efficient, usually spanning a few weeks depending on the specific team and project needs.

PracHub interview research ↗
Is a background in transit or infrastructure required?

While direct industry experience is beneficial, it is not strictly required; a strong track record of high-quality software engineering and a desire to solve complex, real-world problems are the most important factors.

PracHub interview research ↗
What is the company culture like?

SYSTRA fosters a professional, collaborative, and safety-conscious environment where precision and long-term reliability are highly valued over "move fast and break things" mentalities.