As a Software Engineer at thyssenkrupp, you are stepping into a role that sits at the intersection of industrial innovation and digital transformation. thyssenkrupp is a global powerhouse, and your contributions in software engineering directly influence complex systems ranging from green hydrogen electrolysis projects to advanced manufacturing and machining processes.
Your work is critical to the company’s strategic shift toward sustainability and high-performance engineering. You will be responsible for developing, optimizing, and maintaining software solutions that bridge the gap between physical machinery and digital intelligence. This role offers the unique opportunity to solve large-scale, real-world engineering challenges that impact global supply chains and industrial efficiency.
You should expect a high-stakes, collaborative environment where precision is paramount. Whether you are working on process engineering for electrolysis or quality management software, your ability to integrate robust code into industrial workflows will be the key to your success and the company's competitive edge.
Application Review
reportedHalf of this call is the part candidates treat as small talk: start date, notice period, work authorisation and its timing, location and time zone, on-call, and the number. Those are what kill offers late, after several engineers have each spent a day. Surfacing a hard constraint now costs you nothing and occasionally buys you something, since a loop compressed to fit a competing deadline can usually only be arranged if it is asked for early. The common failure is deflecting the compensation question twice, then discovering at offer stage that the band never reached your number.
What to demonstrate
- Whether your hard constraints are compatible with the role before a loop gets booked: earliest start, notice period, what authorisation you hold and when it needs action, days on site, willingness to carry a pager
- Whether you give a compensation range with something behind it, such as current total compensation or a competing timeline, rather than leaving the band untested
- Whether your stated timeline is real, since a competing deadline raised now is something scheduling can sometimes work around and the same deadline raised at offer stage usually is not
How to prepare
- Write each constraint down in one line before the call and state them as facts rather than negotiating them live under a question you were not expecting
- Set your range from two or three current data points for that level and location, and name the structure you are quoting in, so the number is comparable to the one they are holding
- If another process is running, say where it stands and by when, and ask directly whether this loop can be scheduled inside that window
Screening
reportedWhen a round has no standard shape, it is often there because something is still open: an area no earlier conversation reached, a round where the signal came out mixed, or a decision someone is not ready to make alone. Work out which by going back over what each earlier round actually covered rather than how it felt, and arrive able to give evidence on that point without being asked twice. Weak answers replay the loop's earlier material at the same depth. Strong ones go a level deeper and stay consistent with what you already said.
What to demonstrate
- Whether your account of a project matches the one you gave earlier in the loop, since what you said before may be available to whoever runs this round
- Whether you can go a level deeper on something already covered, reaching the decision and its alternatives rather than repeating the summary
- Whether you state your own uncertainty accurately, including parts of a system you did not build and decisions you inherited, instead of claiming even ownership across all of it
- Whether you can answer a question you handled poorly earlier by naming what you missed, rather than delivering a polished second version as if the first had not happened
How to prepare
- Reconstruct the loop on one page: for each round, the questions you were asked and the answer you actually gave, not the better one you thought of afterwards. The gaps on that page are your best available guess at why this round exists.
- Take the two claims you made earlier that carry the most weight and assemble the backing for each: the measurement, the date, what broke, the decision you would make differently now.
- Write down the three facts about your work that must not drift between tellings, such as team size, timeline and your own role, and check your stories against that list rather than trusting recall under pressure
Technical Evaluations
reportedWhat this round decides is narrow: whether you can produce code that runs and is correct on inputs nobody showed you. An elegant solution that does not compile scores below a plain one that does, so write a correct brute force first, say out loud that you know its cost, and improve it with the working version still on screen. What separates strong answers is who finds the broken case. Trace your own code against an empty input, a single element, and duplicate keys before you say you are finished, because being told is far more expensive than noticing.
What to demonstrate
- Whether degenerate inputs get checked without being asked for: an empty collection, one element, every element equal, and the extreme value the input type allows
- Whether the complexity you state matches the code you actually wrote, including a sort or a copy sitting inside a loop
- Whether the finished answer is verified against the worked examples before you call it done, rather than assumed correct because the code reads correctly
How to prepare
- Take five problems you have already solved and, without running anything, write down what each returns for empty input, a single element, and all-duplicates. Then run them and count how many you predicted wrong.
- Drill the brute force as its own skill: on ten problems, write only the obviously-correct slow version and time how long it takes to get it passing. If that is more than a few minutes, that is what to practise, not the optimal version.
- Add a fixed last step before you submit anything, reading only the loop bounds and the initial value of each accumulator, which is where most off-by-one errors live
Project Discussion
reportedAn unlabelled round is first an information problem, and the cheapest information is free. Whoever schedules it can usually tell you how long it runs, who will be in the room and what they work on, whether you will be writing code and in what environment, and whether anything is being sent beforehand. Ask in writing so the answer is on record, then prepare for the two or three formats those answers still leave open instead of betting on one. What separates a strong candidate is not guessing right; it is having an opening that works whichever one it turns out to be.
What to demonstrate
- Whether you can start work from an ambiguous brief, since tolerating a vague scope without stalling is the same thing the job asks for
- Whether the questions you asked beforehand were ones that change your preparation, such as duration, medium and who is joining, rather than ones whose answers you could not have acted on
- Whether you adapt when the round turns out to be something other than what you were told, instead of spending the first ten minutes visibly recalibrating
How to prepare
- Send one short scheduling message asking four things: how long, who is joining and what they work on, whether you will be writing code and where, and whether to prepare anything in advance. Treat a vague reply as real information, since it means the round is loosely structured and you will be shaping it yourself.
- Write one opening that works in any of the formats still open: restate in your own words what you have been asked to do, then ask which of two directions is more useful to them. Say it aloud until it stops sounding recited.
- Set up for the two most likely formats before the call starts, with a blank editor in the language you would choose and a shared document you can type into, so a format surprise costs you nothing in the first minutes
Final Hiring Decision
reportedNobody in the room with you decides this. Interviewers typically write their rounds up separately, often before seeing anyone else's, and the outcome is settled later from those write-ups. A split panel gets resolved by whichever note carries specific evidence, so what you want out of each room is one concrete thing that person could write down: a bug you caught yourself, a trade-off you named, a decision you owned. The rest is arithmetic. The project you describe in a behavioural conversation is often the same system you sketched an hour earlier, and the two accounts have to agree.
What to demonstrate
- Whether the scale, team size and timeline you attach to a project hold steady when that project resurfaces in a different round
- Whether each interviewer leaves with a specific thing to cite rather than a general impression of competence
- Whether a trade-off you defended in one round survives a challenge in another, instead of being quietly swapped for the answer the new interviewer seemed to want
- Whether a question you have already answered earlier in the day gets the same answer at the same depth, without visible impatience
How to prepare
- Write a one-page sheet per project fixing the figures you will quote — request volume, data size, team size, elapsed time, what broke — and say them aloud from the sheet until they come out identical every time
- For each round on the schedule, decide in advance the one sentence you want in that person's notes, then check in a mock that you said it outright instead of leaving it to be inferred
- Have someone ask you the same project question twice, an hour apart, and diff the two answers for numbers that moved or a trade-off that reversed
PracHub editorial advice for the preparation topics above.
Paginating with LIMIT/OFFSET over a set that changes while the client is reading it
OFFSET n makes the database produce and discard n rows before returning anything, so the cost of a page grows with its depth rather than with its size and page 500 costs five hundred pages of work. The correctness problem is worse than the cost: if a row is inserted or reordered between two page fetches, rows shift across the offset boundary and are either skipped entirely or returned twice, and neither outcome leaves any trace in the response for the client to detect. Keyset pagination - WHERE (sort_key, id) < ($last_sort_key, $last_id) ORDER BY sort_key DESC, id DESC LIMIT n, backed by an index in exactly that order - reads only the rows it returns and is stable against concurrent inserts. It requires the tie-break column: a timestamp is not unique, and duplicate sort keys straddling a page boundary reintroduce the skip it was adopted to remove.
Shipping a migration and the code that depends on it as a single change
During any rolling deploy, and for as long as a rollback remains possible, old and new code execute against the same schema at the same time. A migration that drops or renames a column breaks every instance that has not restarted yet, and code that requires a column the migration has not applied breaks every instance that restarted early. The discipline is expand then contract: add the new column nullable, write both shapes, backfill in batches, move reads across once the backfill is verified, and only then stop writing the old shape and drop it - four deploys, usually spread over days. It feels disproportionate until the first rollback, at which point it is the only reason the previous version still runs.
Never running a concrete value through the code
Trace one small input and one edge input by hand, index by index, out loud. Re-reading your own code catches design mistakes; walking a real value through it catches the off-by-one, the uninitialised accumulator and the loop that never advances.
Abandoning working code to chase the optimal solution
Get the straightforward version correct, state its complexity, and only then optimise, keeping the working version until the faster one passes the same cases. A correct quadratic solution with a stated path to linear beats a half-written optimal one that never ran.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Find overlapping job attempts and peak concurrency from lease records
A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.
Approach
- Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
- For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
- For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
- Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
- State the clock caveat: started_at and finished_at are written by different workers, so under skew of a few hundred milliseconds an apparent overlap shorter than that bound is not evidence. Filter reported overlaps by a minimum duration, or prefer timestamps written by whichever component heartbeats the lease.
- Scale the sort rather than assuming it fits: the sweep emits two endpoints per attempt, so 50,000,000 records become 100,000,000 endpoints, and at roughly 24 bytes each, an 8-byte timestamp plus a 4-byte job_type plus a kind flag padded to alignment, that is about 2.4 GB of sort keys before any scratch space. Either push the ordering into the database behind an index on (job_type, started_at) or run an external merge sort in chunks; the overlap pass sorts n records rather than 2n, so it is the cheaper of the two.
Worked solution 30 min
- Write the interval derivation with the COALESCE and state in one line which of the two end sources is observed and which is assumed.
- Write the concurrency sweep: the endpoint tuples, the sort key including the end-before-start tie-break, and the per-job_type counter.
- Hand-trace four attempts of one job, two disjoint and two overlapping by three seconds, and confirm the overlap detector fires exactly once.
- Add the skew filter as a minimum overlap duration, state the value you chose, and justify it from how the timestamps are written.
Follow-up
- A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
- Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
- How would you compute both answers incrementally as records arrive rather than in a daily batch?
Identify the heaviest tenants in a five-minute window under memory pressure
The edge service handles about 3,000 requests per second across roughly 50,000 tenants, peaking near 9,000. Expose the 50 heaviest tenants by request count over the trailing five minutes so limits can be tightened before one tenant's backfill starves the fleet. You may not retain five minutes of raw records. Give the exact solution and its memory, then the bounded-memory approximation with its error stated as a formula, and say which you would ship and at what tenant cardinality that choice changes.
Approach
- Do the exact version first, because it is affordable at this cardinality: a ring of 300 one-second counters per tenant, advanced lazily, is 1,200 bytes of counters per tenant and roughly 60 to 90 MB for 50,000 tenants with overhead. Carry a running total and subtract the bucket you overwrite so a window read is O(1) rather than 300 adds.
- Extract the top 50 with a size-k min-heap over the tenant sums: O(d log k) for d tenants, against O(d log d) to sort them all. Maintaining the heap continuously instead of on query requires a tenant-to-heap-index map, because incrementing a count already inside the heap means sifting from a known position, and without that map you rebuild the heap on every request.
- State the approximation precisely rather than gesturing at sketches. Misra-Gries with m counters retains every item whose true count exceeds N/(m+1), and each retained count underestimates the truth by at most N/(m+1). With m = 1,000 and N = 900,000 requests in the window the error is roughly 900 requests, which is fine for spotting a tenant sending 50,000 and useless for ranking two tenants 200 apart.
- Say what breaks when the window slides: Misra-Gries and Space-Saving are insert-only and cannot be decremented as records age out. The workable construction is one summary per sub-window, say ten seconds, with 30 summaries merged at query time, and the merged error is the sum of the per-summary errors, so the bound degrades linearly in the number of sub-windows.
- Choose and defend it: at 50,000 tenants the exact rings cost under 100 MB in a process that already holds more, so ship exact. Keep the sketch for the case that actually motivates it, a per-principal or per-IP key where cardinality runs to millions and is not bounded by anything you control.
- Raise the fleet problem before it is asked: each of 20 to 40 instances sees only its share, and the top 50 of one shard is not the top 50 of the fleet. Either aggregate counts centrally or accept that a per-instance threshold multiplied by instance count is the limit you are really enforcing.
Follow-up
- The heaviest tenant is heavy because of one export job rather than user traffic. Should the limiter treat those as the same tenant?
- Two tenants sit tied at the boundary of the top 50. Does your answer flap, and does the flapping matter?
- You switch to per-principal keys and cardinality goes to 10 million. Walk through what changes.
Track a rolling failure rate per destination for circuit decisions
The egress service delivers about 1,500 webhooks per second across roughly 40,000 destinations, each call bounded by a 10 second timeout. Maintain, per destination, the failure rate over the trailing 60 seconds so a caller can ask before dispatch whether the circuit should open. Attempts arrive as (destination_id, finished_at_ms, outcome). Requirement: amortised O(1) per attempt, with total memory bounded by the destination count rather than by traffic. Give the structure, its exact memory, and the rule that stops a destination with three attempts from opening a circuit.
Approach
- Name the exact-deque version and then reject it as the default. Holding timestamps and advancing a tail pointer past anything older than now minus 60 seconds is a correct two-pointer window at amortised O(1) per attempt, but its memory tracks in-window traffic, so one destination in a retry storm holds hundreds of thousands of entries while thousands of quiet destinations hold none.
- Use a ring of 60 one-second buckets per destination, each bucket a pair of counters for attempts and failures. On an attempt, advance the ring by the elapsed whole seconds, zeroing at most min(elapsed, 60) buckets, then increment the head. That is amortised O(1) with a fixed footprint per destination.
- State the footprint: 60 buckets times two 4-byte counters is 480 bytes of payload per destination, so 40,000 destinations is roughly 20 to 25 MB with per-entry overhead, bounded by the catalogue rather than by the rate. The cost is granularity, since the oldest bucket ages out in whole seconds, which is far tighter than the decision needs.
- Require a minimum sample before the circuit may open. A destination with three attempts and three failures reads as 100 percent and is not evidence; a floor of roughly 20 attempts in the window makes the ratio meaningful, and below that floor use a run of consecutive failures as the trigger instead.
- Expire idle destinations, or memory grows with every destination ever seen rather than with the live set. Hold the rings in a bounded LRU keyed on destination_id and treat a miss as no history, which is the correct default for an endpoint that has been silent for a minute.
- Keep the half-open probe out of the window arithmetic. After the circuit opens, one probe per interval decides whether to close it, and folding that single success into a window that still holds a 100 percent failure history would reopen the destination on one data point.
Follow-up
- The fleet is 30 instances and each sees roughly a thirtieth of a destination's traffic. Where does the rate actually live, and what does a per-instance answer get wrong?
- A destination answers in 9.5 seconds and succeeds. It is not failing but it is consuming your per-destination concurrency. What signal should open the circuit here?
- How would you make the window survive a process restart, and is it worth the cost?
Write the update path that detects a concurrent edit
resource carries version INT NOT NULL DEFAULT 1. resource_revision holds revision_id, resource_id, version, actor_user_id, change_kind, patch JSONB, request_id, created_at with UNIQUE (resource_id, version). outbox_event holds aggregate_type, aggregate_id, aggregate_version, event_type, payload, status. A PUT carries the version the client read. Write the exact statements for the single transaction that applies the edit, records the revision and enqueues 'resource.updated', and give the handler's branch on zero affected rows. Then say what PostgreSQL 16 does under READ COMMITTED when two of these updates hit one row at once.
Approach
- One transaction, three writes, no network call inside it: UPDATE resource SET title = $3, version = version + 1, updated_at = now() WHERE resource_id = $1 AND tenant_id = $4 AND version = $2; then INSERT the resource_revision row at version $2 + 1; then INSERT the outbox_event row at the same aggregate_version. The event goes to a table rather than a broker because no transaction spans both.
- Branch on the affected-row count before doing anything else. Zero has three causes — stale version, wrong tenant, row gone — so re-read once and map to 409 carrying the current version, or 404 for an id outside the caller's tenant, which also stops the endpoint confirming that another tenant's id exists.
- State the engine behaviour instead of assuming it. Under READ COMMITTED the second UPDATE blocks on the row lock, and when the first commits PostgreSQL re-evaluates the WHERE clause against the newly committed row, so the version predicate now fails and the statement reports zero rows. Under REPEATABLE READ the identical collision raises SQLSTATE 40001 instead, so the handler must fold both shapes into one conflict response.
- Keep UNIQUE (resource_id, version) even though the predicate already serialises writers. It is what makes a lost update unwritable if any other path ever reaches the revision table, and it converts a logic bug into 23505 rather than into a silently missing history row.
- Refuse to auto-retry the whole PUT. A retry re-reads the winner's state and reapplies an intent formed against data that no longer exists — the silent overwrite the version token was added to detect. Return the conflict; merge field-wise only if the patches are provably disjoint.
- Note that now() is the transaction timestamp in PostgreSQL, so resource.updated_at, the revision's created_at and the outbox row share one instant, which is what later makes reconciliation between the three tables unambiguous.
Follow-up
- A client sends the version it read ten minutes ago and the resource has moved three versions. What is in your 409 so it can resolve the conflict without a full re-fetch?
- Two editors, two disjoint fields, no overlap. Does your answer still refuse the second write, and should it?
- Every write now touches a second hot table. How do you keep the outbox insert and its partial index from becoming the write bottleneck at 1.2k writes/second?
Find version gaps and relay lag with window functions
outbox_event holds event_id, aggregate_type, aggregate_id, aggregate_version, event_type, payload, status ('pending','published','dead'), attempts, created_at, published_at. A projection is missing rows and you must decide whether the relay skipped events or the consumer dropped them. Write three queries over the last seven days: one listing every aggregate_id whose published aggregate_version sequence has a hole, one giving per-day counts with a running total, and one returning the newest published event per aggregate. For each, say where the window function is evaluated relative to WHERE and LIMIT. PostgreSQL 16.
Approach
- Gaps: compute lead(aggregate_version) OVER (PARTITION BY aggregate_id ORDER BY aggregate_version) in a subquery, then filter next_version <> aggregate_version + 1 in the outer query. Window functions are evaluated after WHERE, GROUP BY and HAVING and before the outer ORDER BY and LIMIT, so the predicate cannot sit in the same WHERE clause and PostgreSQL 16 has no QUALIFY.
- Say what the seven-day filter does to the answer: it truncates every partition, so the first row per aggregate has no predecessor inside the window and a hole spanning the boundary is invisible. Widen the window, or join to resource.version as the authority for the true maximum.
- Running total: SELECT date_trunc('day', created_at) AS d, count() AS n, sum(count()) OVER (ORDER BY date_trunc('day', created_at) ROWS UNBOUNDED PRECEDING). An aggregate inside a window call is legal because grouping runs before windowing. The grouping key is unique per row here so ROWS and RANGE agree, but write the frame anyway — over ungrouped rows with tied timestamps the default RANGE frame pulls in every peer row and the total jumps.
- Newest per aggregate: DISTINCT ON (aggregate_id) ... ORDER BY aggregate_id, aggregate_version DESC is the cheap PostgreSQL-only form when an index matches that order; row_number() OVER (PARTITION BY aggregate_id ORDER BY aggregate_version DESC) = 1 is the portable form and needs a subquery for the same evaluation-order reason as the gap query.
- Interpret rather than report: no gaps plus a normal p95 of published_at - created_at points at the consumer; gaps or a fat lag tail point at the relay; rows still 'pending' with attempts > 0 point at neither, because they never left the database.
- Be explicit that the partial index on (created_at, event_id) WHERE status = 'pending' does not serve any of these — they read published rows. Name the index a recurring monitor would need, and say why a query run twice a year may not deserve one.
Worked solution 30 min
- Write the three queries against seven days of data and confirm each returns without error.
- In a scratch copy, delete one middle event for a single aggregate and confirm the gap query names that aggregate and the versions either side.
- Run a running total over ungrouped rows ordered by date_trunc('second', created_at), once with the default frame and once with ROWS, and record where the two series diverge.
- Compare the DISTINCT ON and row_number() plans on the same data and record rows-read for each.
Follow-up
- Relay failover redelivers events. Does a duplicate break the gap query, and how would you detect one from this table alone?
- Turn the gap check into a continuous monitor rather than a query someone runs after an incident. What does it watch?
- The consumer claims it never received event 4,812,006. What do you look at, in what order?
Describe a situation where you had to bridge the gap between software …
Describe a situation where you had to bridge the gap between software requirements and physical engineering limitations.
Approach
- Work from the requirement backwards to the design.
- Say what you would check first and why it is the highest-information step.
- Clarify what is being asked and what a complete answer contains.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
How do you ensure software reliability in a system that controls physi…
How do you ensure software reliability in a system that controls physical industrial hardware?
Approach
- Clarify what is being asked and what a complete answer contains.
- Work from the requirement backwards to the design.
- State your assumptions explicitly before working the problem.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Make the resource write endpoint safe for retrying clients
The edge API accepts POST /v1/resources at 1.2k writes/second peak under a 400 ms p99 budget, and clients retry on timeout. idempotency_key has PRIMARY KEY (tenant_id, idempotency_key) plus request_fingerprint CHAR(64), state in ('in_flight','succeeded','failed'), response_status, response_body, resource_id, locked_until and expires_at. Specify the exact sequence the handler runs: what the second request does when it arrives while the first is still executing, what a retry carrying a different body receives, what happens when a process dies mid-request, and how the table is kept from growing without bound.
Approach
- Start from the race rather than the happy path. Insert the key row first, in its own short transaction, with state 'in_flight' and locked_until set to now() plus the request deadline. The unique constraint on (tenant_id, idempotency_key) is the arbitration mechanism: exactly one caller commits the insert, and every other caller takes a unique violation (SQLSTATE 23505) and becomes a follower. Reading the table and then inserting is a check-then-act race that both callers pass, and they pass it most often under the load that generates the retries.
- Give the follower a branch for every state it can observe, with no fall-through to doing the work: fingerprint mismatch means the key is being reused for a different request, so reject with 422 and never replay the stored response; 'succeeded' replays response_status and response_body verbatim; 'failed' allows a fresh attempt; 'in_flight' with locked_until in the future is answered with 409 and a retry hint, or a short bounded wait, because the only alternative is executing the effect twice.
- Commit the effect and the record of the effect together. The resource insert, its resource_revision row, its outbox_event row and the transition of the key row to 'succeeded' all happen in one transaction, so no crash can leave the work done and the key still 'in_flight'. The earlier insert is deliberately a separate transaction: it has to be visible to a concurrent caller before the work starts, which an uncommitted row is not.
- Close the wedged-key path. A process that dies after the insert leaves a row that would otherwise block that key forever, which is what locked_until exists for. Reclaim with a single conditional statement, UPDATE ... SET state='in_flight', locked_until=now()+interval WHERE ... AND state='in_flight' AND locked_until < now(), and treat a zero rowcount as losing the reclaim. Two statements that read and then update reintroduce the original race one layer down.
- Size the retention before it becomes an incident. At the 1.2k/second peak a 24-hour window is on the order of 100 million rows, and the table grows with traffic rather than with data, so the sweep is load-bearing. Batched deletes driven by an index on expires_at keep it bounded. Range-partitioning by day and dropping whole partitions is cheaper, but PostgreSQL requires every partition-key column to appear in the primary key, so the key becomes (tenant_id, idempotency_key, created_at) and a retry that straddles the boundary no longer collides with its original. State that cost rather than meeting it later.
Worked solution 20 min
- Draw a timeline with the retry arriving 150 ms into a 900 ms first attempt, and mark the instant each row becomes visible to the other transaction.
- Write the insert-first statement, then a five-row branch table for the follower: fingerprint mismatch, 'succeeded', 'failed', live 'in_flight', expired 'in_flight' - one action each.
- Write the single conditional UPDATE that reclaims an expired in_flight row, and argue why two concurrent reclaimers cannot both see a non-zero rowcount.
- Compute rows per day at peak, name the index the sweep uses, and check the sweep rate against the insert rate.
Follow-up
- The stored response body averages 200 KB and this table is now the largest in the database. What do you store instead, and what does a replay return once the body has been pruned?
- A client library generates a fresh idempotency key on every attempt. What breaks, which layer should have caught it, and does the server have any defence?
- The first attempt succeeded but its response was lost, and the client retries 30 hours later, after the key expired. What does the second attempt do, and is that acceptable?
Every query on one table stalls for forty seconds mid-deploy
During a release on PostgreSQL, every query touching resource times out for about 40 seconds and then recovers with no intervention. The release ran one migration, ALTER TABLE resource ADD COLUMN archived_reason TEXT, and the migration log shows it completing in 6 ms. Unrelated tables showed no change in error rate. Explain how a 6 ms statement caused a 40-second stall, give the ordered checks you would run on a live system to confirm it, and give the migration procedure that prevents a repeat.
Approach
- Separate the statement's duration from the lock's duration. ADD COLUMN with no default is a catalogue-only change and genuinely runs in milliseconds, but it requires ACCESS EXCLUSIVE, and it cannot acquire that until every transaction already touching the table has finished.
- Account for the queueing, which is the part that surprises people. A lock request that is waiting blocks later requests for conflicting modes behind it rather than letting them overtake, so one long-open transaction holds the DDL and the DDL holds all the traffic. The stall length is set by the longest open transaction, not by the size of the change.
- Confirm on a live system in this order: pg_stat_activity for that table ordered by xact_start, looking for the oldest transaction and specifically for state = idle in transaction; then pg_locks where granted = false to find the waiter; then join them on pid to name blocker and blocked. pg_blocking_pids() does that join for you and is the fastest single call.
- Prevent rather than merely time it better. Set lock_timeout to a second or two on the migration session so the DDL abandons the queue after a bounded wait and is retried, instead of holding it for as long as the oldest transaction lives. Be exact about what that buys: queries arriving during the wait still queue behind the pending ACCESS EXCLUSIVE request, so each attempt costs them up to one lock_timeout of added latency. The outage goes from 40 seconds to about one second per attempt, not to zero. Also run migrations away from deploy-time peaks, and put a statement timeout and an idle-in-transaction timeout on the analytics role that opens the long transactions.
- Know the lock each change takes, since the mitigation differs by change. A column with a non-volatile default is a metadata-only change from PostgreSQL 11 and still needs the brief ACCESS EXCLUSIVE; an index needs CREATE INDEX CONCURRENTLY, which cannot run inside a transaction block and leaves an INVALID index to drop if it fails; a check or foreign key is added NOT VALID and then VALIDATE CONSTRAINT as a separate statement under a weaker lock.
Follow-up
- The same release also wants NOT NULL on that column. What is the sequence that gets there without a long lock?
- Your lock_timeout retry fails ten times in a row because the analytics transaction is always open. What do you change?
- How does this differ on MySQL with InnoDB online DDL, and what is the equivalent of the waiting-lock queue there?
Four days sample coding, design, fundamentals and the practical rounds at deliberately shallow depth, which is enough to surface the topics you did not know were in scope. That map, rather than a guess made on day one, decides where the last three days go.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Coding, one pass at shallow depth
- Solve one problem from each of six families, an array with two pointers, hash counting, binary search, a tree traversal, a graph traversal and one dynamic program, under a hard twenty-minute cap with no extensions, marking each finished, late, or stalled.
- For every stall, write the exact move you could not make rather than the subject, so the note reads could not turn the recurrence into a loop rather than bad at dynamic programming.
- Fix nothing today. The value of the pass is the unfixed record.
Deliverable: Six timed attempts marked finished, late or stalled, each stall carrying a named blocking move.
Practice prompt ↗Practice prompt ↗Worked solution ↗02Design, one pass at shallow depth
- Spend twenty minutes each on three different shapes, a read-heavy feed, a write-heavy ingest path, and something needing a transaction across two entities, stopping each at requirements, interface and data model.
- After each, write the first question you could not answer, which is usually a number you could not estimate or a failure mode you had no vocabulary for.
- Mark which of the three you would be most relieved not to be asked, and treat that as data rather than as a preference.
Deliverable: Three shallow designs, each with the first unanswerable question written at the bottom.
Practice prompt ↗Practice prompt ↗03Fundamentals and the practical rounds
- Answer eight short questions in writing at four minutes each, covering the material that fills the gaps between the big rounds: what happens between a URL and a rendered page, what an index costs on write, when a process is preferable to a thread, and what conditions a deadlock requires.
- Do one thirty-minute practical task of the kind a take-home compresses: read an unfamiliar two-hundred-line file and write what it does, what you would change, and the one thing you remain unsure of.
- Score every answer fluent, correct but slow, or absent, and keep the absent ones visible.
Deliverable: Eight scored short answers and one written reading of unfamiliar code.
Practice prompt ↗Practice prompt ↗04The rounds that are about you, and the map
- Deliver three behavioural answers aloud against a timer, a conflict, a failure you owned, and a decision made without enough information, marking any that ran past three minutes or contained no number.
- Assemble the map: every marked item from days one to three on a single page, sorted by how likely it is to appear in your loop rather than by how uncomfortable it felt.
- Choose exactly two areas for the remaining three days and write down what you are deliberately abandoning.
Deliverable: A one-page scored map of the whole surface area with two areas chosen and the rest explicitly abandoned.
Practice prompt ↗Practice prompt ↗Worked solution ↗05First chosen area, to the depth you skipped
- Work the higher-ranked area in four focused blocks, choosing items one level above where you stalled rather than repeating what already works.
- After each block write the rule you extracted in one sentence with its precondition attached, since a rule carrying no precondition is exactly what fails under a variation.
- Re-attempt the day-one or day-two item that exposed this area and compare against the original timing.
Deliverable: Four worked blocks, a timed re-attempt against the original, and three one-sentence rules with preconditions.
Practice prompt ↗Practice prompt ↗06Second chosen area, where the gap is coverage rather than speed
- Treat the second area differently from the first. Day five drilled something you could already half-do; this one is usually a topic you had simply never met, so build one worked reference example end to end and keep it, rather than attempting six problems badly.
- Write down the vocabulary you were missing on day two or three, five terms at most, each with the one sentence that makes it usable in an answer rather than the textbook definition.
- Redo the shallow attempt that exposed this area and note whether you now fail later in the problem, because moving the failure point is the realistic gain from a single day and is worth more than a score that did not change.
Deliverable: One worked reference example for the newly covered area, a five-term vocabulary list, and a note on where the failure point moved.
Practice prompt ↗Practice prompt ↗07Reassemble the loop
- Sit two rounds back to back with no gap, ordering them so the area you chose second comes last, because the map was built from rested, isolated attempts and the loop will reach your weaker area when you are already spent.
- Write where the second round suffered from the first, which is normally the point at which structure collapses into narration.
- Reduce the week to one page holding only the rules you can state without reading them.
Deliverable: Mock notes on cross-round carryover plus a one-page card of rules you can recite from memory.
Practice prompt ↗Worked solution ↗Expand any day for tasks and deliverables. Your progress is saved on this device.
Every story you tell gets read for blast radius and judgement: what could have broken, who else it touched, what you knew at the moment you decided. Nobody can audit your code in an hour, so they audit your reasoning instead. Pick work where the call was genuinely yours and the consequences were real enough to remember.
Share an example of how you have mentored junior engineers or contribu…
Share an example of how you have mentored junior engineers or contributed to team knowledge sharing.
Approach
- Name the disagreement and how you resolved it with evidence.
- Close with what you would do differently, concretely.
- State the situation in two sentences and spend the rest on the reasoning.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
Describe your experience with automated testing frameworks in a produc…
Describe your experience with automated testing frameworks in a production environment.
Approach
- Close with what you would do differently, concretely.
- Name the disagreement and how you resolved it with evidence.
- Pick a story where you made the decision, not one where you watched it.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
How do you maintain quality standards when working under tight project…
How do you maintain quality standards when working under tight project deadlines?
Approach
- State the situation in two sentences and spend the rest on the reasoning.
- Pick a story where you made the decision, not one where you watched it.
- Close with what you would do differently, concretely.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
How do you handle data integrity when integrating new software with le…
How do you handle data integrity when integrating new software with legacy machinery?
Approach
- Close with what you would do differently, concretely.
- Name the disagreement and how you resolved it with evidence.
- State the situation in two sentences and spend the rest on the reasoning.
Follow-up
- How did you know your change caused the improvement?
- What would you do differently if you ran that again?
- 01
Share an example of how you have mentored junior engineers or contributed to team knowledge sharing.
- 02
Describe your experience with automated testing frameworks in a production environment.
- 03
How do you maintain quality standards when working under tight project deadlines?
- 04
How do you handle data integrity when integrating new software with legacy machinery?
Is this an official thyssenkrupp interview guide?
No. It is PracHub's own research and practice material for the Software Engineer role at thyssenkrupp. Rounds and questions reflect what candidates have reported, not a process thyssenkrupp has published, and they change over time. Confirm the current format and scope with your recruiter.
PracHub interview research ↗How difficult are the technical interviews at thyssenkrupp?
The interviews are challenging but fair, focusing on practical application rather than abstract theory. Expect to be tested on your ability to solve real-world problems that the team is currently facing.
PracHub interview research ↗What is the best way to stand out during the interview?
Show a deep interest in the intersection of software and physical engineering. Candidates who can articulate how their code directly impacts the efficiency or safety of industrial processes tend to perform the best.
PracHub interview research ↗How long does the hiring process usually take?
While timelines vary by location and seniority, you should expect a professional and deliberate process. It is common to have several rounds of interviews, so ensure you have the capacity for a multi-week engagement.
PracHub interview research ↗Is there a specific focus on company culture?
Yes, thyssenkrupp values long-term commitment, safety, and technical excellence. Be prepared to discuss how you align with these values in your daily work.
PracHub interview research ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01PracHub interview research ↗
PracHub editorial research into this company and role, maintained with this guide. Candidate-reported, not an employer publication.
PracHub page · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
Cross-company practice questions for this role.
PracHub page · Accessed 2026-09-22 - 03PracHub interview preparation framework ↗
The framework the preparation plan follows.
PracHub page · Accessed 2026-09-22