TTC (Toronto Transit Commission) · Software Engineer
Updated · 2026-09-24

TTC (Toronto Transit Commission) Software Engineer
Interview Questions & Guide 2026

THE 60-SECOND BRIEF

The TTC (Toronto Transit Commission) serves as the backbone of Toronto’s mobility, and the Software Engineer role is pivotal in maintaining, modernizing, and securing the massive infrastructure that moves millions of people daily. You are not just writing code; you are building the digital systems that interface with critical transit hardware, signaling, and communications networks.

The shape of the workload matters more for your prep than the industry label does. Read-heavy serving, write-heavy ingestion and scheduled batch processing have different binding constraints and fail in different places, so find out which one the team lives in before picking design topics.

TTC (Toronto Transit Commission) candidates report 3 rounds · ≈ 3-5 weeks. The stages below are what candidates describe, not a published process.

Bound blast radius with per-tenant concurrency limitsScope every query and cache key by tenantMake every write idempotent under client retries

35 min read

Browse Software Engineer questions

See the practice prompts

15Practice promptsAcross five skill areas
3With worked solutionsIncluded in the practice prompts

The TTC (Toronto Transit Commission) serves as the backbone of Toronto’s mobility, and the Software Engineer role is pivotal in maintaining, modernizing, and securing the massive infrastructure that moves millions of people daily. You are not just writing code; you are building the digital systems that interface with critical transit hardware, signaling, and communications networks.

This role requires a unique intersection of software development expertise and engineering discipline. You will contribute to complex, high-stakes environments—ranging from electrical and traction power management to sophisticated communications systems. Your work directly impacts the reliability, efficiency, and safety of the transit network, making this an ideal role for engineers who thrive on solving large-scale, tangible problems that affect the public interest.

01

Initial Screening

reported

The person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.

What to demonstrate

  • Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
  • Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
  • Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural

How to prepare

  • Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
  • Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
  • Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one
PracHub interview research ↗
02

Technical Discussions

reported

Most of the time lost in this format is not lost to thinking. It goes to a standard-library call you half-remember, an off-by-one in a loop bound, and a debugging loop that mutates code at random until something passes. When output is wrong, stop re-reading the whole function: take the smallest input that reproduces it and walk the state through by hand, printing intermediates if the environment allows. Guessing at a fix without a failing case you understand is how a five-minute bug becomes twenty, and the clock does not pause while you do it.

What to demonstrate

  • Whether you reach the right structure without a detour, and can write it from memory rather than only recall that one exists
  • Whether overflow is considered where the language has fixed-width integers, since a signed 32-bit value stops at 2,147,483,647 and then wraps in Java, is undefined behaviour in C++, and does not arise in Python, whose integers grow instead
  • Whether recursion depth is treated as a constraint on large inputs, given that CPython's default limit is 1000 frames and a deep recursion can exhaust the stack in any language where an iterative version would not
  • Whether a failing case is isolated and explained before any edit is made to the code

How to prepare

  • From an empty file and with no references open, implement the pieces you lean on most: a heap push and pop, an iterative DFS with an explicit stack, and a binary search whose midpoint is written lo + (hi - lo) / 2, which avoids the overflow that (lo + hi) / 2 can hit in a fixed-width integer type
  • Time yourself on the ten library calls you look up most, such as sorting with a custom comparator, splitting and joining strings, and finding the next key at or above a value in an ordered map, until the lookup is gone
  • Take a solution you know is broken and, before touching it, write one sentence naming the input, the expected value and the actual value. Repeat until you do it without deciding to.
PracHub interview research ↗
03

Final Technical Assessments

reported

Where the day includes a partner from product, design or data, that conversation is weighted like the technical ones and prepared for least. They are deciding one thing: whether having you in the room makes their decisions cheaper. That means options with costs attached, not implementation detail and not "it depends". An estimate someone can plan against — a range, the assumption that would push it to the high end, and what you would drop to hit the low one — is worth more than a confident single number, which everyone present already knows is wrong.

What to demonstrate

  • Whether an estimate comes as a range with the assumption most likely to break it, and states what a specific scope cut would actually buy
  • Whether a technical constraint is handed over as a choice with consequences on their side, rather than as a verdict they have no standing to argue with
  • Whether you establish what decision is on the table before proposing anything
  • Whether risk is raised while it can still change the plan, with the trigger that would confirm it, instead of reported afterwards as a slip

How to prepare

  • Take a project that shipped late and write the two-sentence warning you could have given three weeks earlier, naming what you would have needed decided at that point
  • Rehearse one estimate out loud until it arrives in three parts: the range, the single assumption that would blow it, and the smallest thing you would cut to protect the date
  • Rewrite an objection you have actually made — the "we can't do that" version — as two options with their costs, so the choice ends up with the person who owns it
PracHub interview research ↗

PracHub editorial advice for the preparation topics above.

01

Treating a timed-out write as a failed write

A timeout says the response did not arrive, not that the work did not happen; the server may well have committed and then lost the connection. Retrying a non-idempotent create after a timeout is the standard way to end up with two of something, and those duplicates land precisely when the system is already degraded and least able to absorb them. The discipline is to treat a timeout as unknown: either the write carries an idempotency key so the retry is safe by construction, or the client re-reads authoritative state before deciding what to do, and the interface says unknown rather than showing a failure that invites a second click.

02

Checking a quota with a select and then writing

Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.

03

Going silent while thinking

Narrate the candidates and why you are discarding them, even in fragments: sorting first would make this a two-pointer scan, but it destroys the original indices, which the output needs. From the other side of the table, a candidate thinking hard and a candidate stuck are indistinguishable until one of them speaks.

04

Designing for a scale nobody asked for

Ask for request rate, data size, read-to-write ratio and expected growth, then size the simplest option first; one relational instance on current hardware covers a large share of real workloads. Reaching for shards, queues and a cache tier before any number has been quoted reads as pattern-matching rather than judgement.

Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.

12 technical prompts3 include a worked solution

Locate a billing reconciliation gap without rescanning ninety million events

hard
reconciliationdimensional-bisectionwatermarkshypothesis-testing

A tenant's sealed invoice total is 0.4% below the sum of its raw usage_event rows for the period. That tenant has 90 million events over 30 days in a table partitioned daily on ingested_at, and its rollups carry source_max_ingested_at, revision and sealed_at. Recomputing all 30 days from raw is correct, and you are not going to do it. Give the procedure that locates the divergent (workspace, sku, hour) cell, the cost of each probe, and the one query you run before any of it.

Approach
  1. Run the free query first. Sum raw quantity for the period restricted to ingested_at <= source_max_ingested_at of the sealed rollups, and compare that against the unrestricted sum. The rollup stores the watermark precisely so this can be answered without a scan. If the whole 0.4% sits above the watermark, nothing is broken: it is late data, it becomes an adjustment line, and the investigation ends in one query.
  2. Only if the gap survives that test do you bisect, and you bisect by dimension rather than by rows. Compare 30 per-day totals, then inside the offending day compare the 6 SKUs, then the workspaces, then the 24 hours. That is roughly 30 + 6 + W + 24 grouped probes, each an indexed range scan over one daily partition for one tenant, against O(N) per attempt for the naive re-fold.
  3. Quantify why naive is not merely slow but unusable mid-incident: at a generous 200,000 rows/second sequential, 90 million rows is about 7.5 minutes per attempt, you will want ten attempts, and every one competes for I/O on the same partitions live ingest is writing. The diagnostic worsens the backlog it is diagnosing.
  4. Before fetching each comparison, state what it would look like under each hypothesis. Two adjacent hours off by equal and opposite amounts is occurred_at versus ingested_at bucketing. A whole day offset by exactly N hours is a timezone applied at the wrong layer. A gap confined to one SKU in one workspace is an environment filter. The same (tenant_id, idempotency_key) present in two ingested_day partitions is the dedup horizon losing a retry that crossed midnight.
  5. Make the next bisection cheap by storing the aggregate you keep recomputing. A per-(tenant_id, ingested_day) count and quantity checksum turns step two from thirty probes into one read, and it is the same number the reconciliation job already produces.
  6. Whatever you find, the sealed period does not change value. The correction is an adjustment line pointing at the line it reverses, carrying its own source_rollup_watermark, because the original invoice is the evidence of what the customer was charged.
Follow-up
  • The gap is 0.4% in one direction on one day and 0.4% the other way the next day. What does that shape rule in, and what does it rule out?
  • How do you distinguish a duplicate from a restatement, given revision and recomputed_at on the rollup?
  • Ingest is still running while you investigate. What makes your two numbers comparable at all?

Seal an hour under late data with bounded memory

hardWorked solution
watermarkslate-dataquantile-sketchconditional-write

Metering ingest reads 256 partitions at 10,000 to 40,000 events/second. Events carry occurred_at and ingested_at, and during a producer replay the gap between them is hours. Seal each UTC hour once no more than 50 parts per million of that hour's eventual quantity can still arrive, using memory that does not grow with the size of the replay. Define the watermark, the lateness parameter and how you measure it, the structure holding open hours, and the write that performs the seal. State what an idle partition does to your watermark.

Approach
  1. Two clocks, two jobs. Bucket by occurred_at, because that is the hour the customer is billed for, and advance the watermark on ingested_at, because that is what the fold has consumed and what source_max_ingested_at records. Conflating them is what makes late data invisible.
  2. The global watermark is the min over partitions of each partition's committed ingested_at, not the max: the fold is trustworthy only as far as the slowest partition. The consequence is that one idle partition pins the watermark forever and nothing seals, so an idle partition must promote its watermark to wall clock after a stated idle timeout, and that timeout becomes a correctness parameter, because a partition that is slow rather than idle gets sealed past.
  3. Choose the lateness L from the measured distribution of ingested_at - occurred_at, weighted by quantity rather than by event count. The target is 50 ppm of the hour's quantity, and a replay is rare in events while carrying disproportionate mass, so an event-weighted quantile picks an L that is comfortably wrong at exactly the moment it matters.
  4. Measure that quantile in bounded memory. A Greenwald-Khanna summary gives epsilon-approximate quantiles in O((1/epsilon) log(epsilon n)) space; a t-digest costs more per merge but has relative error that tightens at the tails, which is the half of the distribution you are reading at p99.99. Keep a separate summary per tenant class, because one tenant's batch importer is not the population.
  5. Hold open hours in a min-heap keyed by hour_start. When the watermark advances, pop every hour with hour_end + L < W and seal it: O(log H_open) per advance and O(1) amortised per event to touch its bucket. Memory is open hours multiplied by distinct (tenant, workspace, sku) keys, so cap the number of simultaneously open hours and spill the oldest into usage_rollup_hourly as status='open' with a revision bump. While an hour is open the row is upsertable, so the store is your overflow.
  6. The seal itself is a conditional write: update ... set status='sealed', sealed_at=now() where status='open' returning .... Two sealers race on every restart, and the loser must see zero rows and stop rather than write a second value. After the seal, an event for that hour is not an upsert but an adjustment, and source_max_ingested_at is what proves it arrived afterwards.
Worked solution 40 min
  1. Replay a day of events with a synthetic lateness distribution: 99.9% under two minutes, plus a 0.05% tail at four to six hours that carries 3% of total quantity.
  2. Compute the p99.99 lateness two ways, event-weighted and quantity-weighted, and put the two numbers side by side.
  3. Implement the min-heap of open hours with the watermark as the min over 256 partitions, then stall one partition for 20 minutes and observe what seals.
  4. Set the idle-partition timeout to 60 seconds, repeat the stall, and measure how much quantity arrives after the seal.
  5. Attempt the seal from two workers at once and confirm the conditional update lets exactly one through.
EXPECTED RESULTThe quantity-weighted p99.99 is hours larger than the event-weighted one. Choosing L from the event-weighted number lets roughly the tail's 3% of quantity land after the seal, 600 times the 50 ppm target. With the min watermark and no idle timeout, the stalled partition blocks all sealing; with a 60-second timeout, the stall is sealed past and its events arrive late.
Follow-up
  • A replay starts during the sealing window for a period you are about to close. What do you do, and what is the customer-visible consequence of each option?
  • Your measured quantity-weighted p99.99 lateness is six hours and the invoice must be issued at 02:00 UTC on the first. How do you reconcile those two numbers?
  • How would you detect that L has drifted before it costs you an hour's quantity?

Find peak concurrent sandbox usage from run intervals

medium
sweep-lineintervalsconcurrency-capsnull-semantics

Given up to 5 million job_run rows for one tenant over one day, with run_id, started_at, finished_at, status and wall_clock_limit_seconds, report the maximum number of sandboxes running at once, the earliest instant that maximum is reached, and the first run_id that would breach a per-tenant cap of C. started_at is null while a run is queued; finished_at is null both for runs still executing and for runs in status lost. Treat a run as occupying [started_at, finished_at). Give the complexity and state how you handle each null.

Approach
  1. Turn each run into two sweep events, (started_at, +1) and (end, -1), then sort the 2n events by timestamp with -1 ordered before +1 at equal timestamps. That tie-break is what makes the interval half-open, so a run finishing at 10:00:00 and one starting at 10:00:00 never overlap.
  2. Decide each null out loud before sweeping, because each choice moves the answer. A null started_at means queued and contributes nothing. A null finished_at with status running or leased is clipped to the window end. Status lost has no observed end at all, so clip it at started_at + wall_clock_limit_seconds on the grounds that the supervisor owns the timeout, and record that you did. The table's check (finished_at is null or started_at is not null) guarantees you never see an end without a start.
  3. Sweep once, maintaining a running counter, the maximum, and the timestamp at which the maximum was first attained (update peak_at only on a strict increase, or you will report the last such instant instead of the earliest). Capture the first run_id whose +1 takes the counter to C+1 during the same sweep rather than in a second pass.
  4. Complexity: O(n log n) dominated by the sort, O(n) space. If rows already arrive ordered by started_at, a min-heap of end times gives O(n log k) time and O(k) space with k the peak concurrency, which is the better shape when the rows come from an index scan on (tenant_id, started_at).
  5. If second resolution is acceptable, counting-sort the endpoints into an 86,400-slot delta array and prefix-sum it: O(n + T) time and O(T) space, which beats the comparison sort at 5 million rows. It answers only at second granularity, so state which resolution the cap is defined in.
Follow-up
  • Now report peak concurrency per tenant for 10,000 tenants from one globally sorted stream. What changes about memory and about the sort?
  • The cap has to be enforced at dispatch rather than reported afterwards. What does the admission check look like, and where does it race?
  • How would you answer 'peak concurrency within any 5-minute window' without re-sorting?

Four days sample coding, design, fundamentals and the practical rounds at deliberately shallow depth, which is enough to surface the topics you did not know were in scope. That map, rather than a guess made on day one, decides where the last three days go.

Small steps. Visible outcomes.0 / 7 completed
ONE WEEK · YOUR PACE

Prepare, practise & reflect

One practical outcome each day. Spend longer where you need it.

0 / 7 done
01Coding, one pass at shallow depth
  • Solve one problem from each of six families, an array with two pointers, hash counting, binary search, a tree traversal, a graph traversal and one dynamic program, under a hard twenty-minute cap with no extensions, marking each finished, late, or stalled.
  • For every stall, write the exact move you could not make rather than the subject, so the note reads could not turn the recurrence into a loop rather than bad at dynamic programming.
  • Fix nothing today. The value of the pass is the unfixed record.

Deliverable: Six timed attempts marked finished, late or stalled, each stall carrying a named blocking move.

Practice prompt ↗Practice prompt ↗Practice prompt ↗Worked solution ↗
02Design, one pass at shallow depth
  • Spend twenty minutes each on three different shapes, a read-heavy feed, a write-heavy ingest path, and something needing a transaction across two entities, stopping each at requirements, interface and data model.
  • After each, write the first question you could not answer, which is usually a number you could not estimate or a failure mode you had no vocabulary for.
  • Mark which of the three you would be most relieved not to be asked, and treat that as data rather than as a preference.

Deliverable: Three shallow designs, each with the first unanswerable question written at the bottom.

Practice prompt ↗Practice prompt ↗
03Fundamentals and the practical rounds
  • Answer eight short questions in writing at four minutes each, covering the material that fills the gaps between the big rounds: what happens between a URL and a rendered page, what an index costs on write, when a process is preferable to a thread, and what conditions a deadlock requires.
  • Do one thirty-minute practical task of the kind a take-home compresses: read an unfamiliar two-hundred-line file and write what it does, what you would change, and the one thing you remain unsure of.
  • Score every answer fluent, correct but slow, or absent, and keep the absent ones visible.

Deliverable: Eight scored short answers and one written reading of unfamiliar code.

Practice prompt ↗Practice prompt ↗
04The rounds that are about you, and the map
  • Deliver three behavioural answers aloud against a timer, a conflict, a failure you owned, and a decision made without enough information, marking any that ran past three minutes or contained no number.
  • Assemble the map: every marked item from days one to three on a single page, sorted by how likely it is to appear in your loop rather than by how uncomfortable it felt.
  • Choose exactly two areas for the remaining three days and write down what you are deliberately abandoning.

Deliverable: A one-page scored map of the whole surface area with two areas chosen and the rest explicitly abandoned.

Practice prompt ↗Practice prompt ↗Worked solution ↗
05First chosen area, to the depth you skipped
  • Work the higher-ranked area in four focused blocks, choosing items one level above where you stalled rather than repeating what already works.
  • After each block write the rule you extracted in one sentence with its precondition attached, since a rule carrying no precondition is exactly what fails under a variation.
  • Re-attempt the day-one or day-two item that exposed this area and compare against the original timing.

Deliverable: Four worked blocks, a timed re-attempt against the original, and three one-sentence rules with preconditions.

Practice prompt ↗Practice prompt ↗
06Second chosen area, where the gap is coverage rather than speed
  • Treat the second area differently from the first. Day five drilled something you could already half-do; this one is usually a topic you had simply never met, so build one worked reference example end to end and keep it, rather than attempting six problems badly.
  • Write down the vocabulary you were missing on day two or three, five terms at most, each with the one sentence that makes it usable in an answer rather than the textbook definition.
  • Redo the shallow attempt that exposed this area and note whether you now fail later in the problem, because moving the failure point is the realistic gain from a single day and is worth more than a score that did not change.

Deliverable: One worked reference example for the newly covered area, a five-term vocabulary list, and a note on where the failure point moved.

Practice prompt ↗Practice prompt ↗
07Reassemble the loop
  • Sit two rounds back to back with no gap, ordering them so the area you chose second comes last, because the map was built from rested, isolated attempts and the loop will reach your weaker area when you are already spent.
  • Write where the second round suffered from the first, which is normally the point at which structure collapses into narration.
  • Reduce the week to one page holding only the rules you can state without reading them.

Deliverable: Mock notes on cross-round carryover plus a one-page card of rules you can recite from memory.

Practice prompt ↗Practice prompt ↗Worked solution ↗

Expand any day for tasks and deliverables. Your progress is saved on this device.

Bring the two or three numbers the story rests on and know how they were collected. A p99 whose timer starts inside your handler excludes the time a request spent queued, so it can sit flat while users wait longer. Give the window, the percentile and what the measurement left out, or drop the number.

How do you handle disagreements regarding technical direction within y…

medium
behavioural and engineering judgement

How do you handle disagreements regarding technical direction within your team?

Approach
  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Close with what you would do differently, concretely.
  3. Pick a story where you made the decision, not one where you watched it.
Follow-up
  • How did you know your change caused the improvement?
  • What did you decide not to do, and why?

Describe a time you had to integrate a new software solution with lega…

medium
behavioural and engineering judgement

Describe a time you had to integrate a new software solution with legacy hardware components.

Approach
  1. State the situation in two sentences and spend the rest on the reasoning.
  2. Close with what you would do differently, concretely.
  3. Pick a story where you made the decision, not one where you watched it.
Follow-up
  • What did you decide not to do, and why?
  • What would you do differently if you ran that again?

Can you describe your experience with real-time systems or embedded so…

medium
behavioural and engineering judgement

Can you describe your experience with real-time systems or embedded software development?

Approach
  1. Close with what you would do differently, concretely.
  2. Give the blast radius: what could have broken, and what you measured.
  3. Pick a story where you made the decision, not one where you watched it.
Follow-up
  • What would you do differently if you ran that again?
  • What did you decide not to do, and why?
  • 01

    How do you handle disagreements regarding technical direction within your team?

  • 02

    Describe a time you had to integrate a new software solution with legacy hardware components.

  • 03

    Can you describe your experience with real-time systems or embedded software development?

PracHub interview preparation framework ↗
Is this an official TTC (Toronto Transit Commission) interview guide?

No. It is PracHub's own research and practice material for the Software Engineer role at TTC (Toronto Transit Commission). Rounds and questions reflect what candidates have reported, not a process TTC (Toronto Transit Commission) has published, and they change over time. Confirm the current format and scope with your recruiter.

PracHub interview research ↗
What is the interview difficulty level?

The interviews are challenging because they focus on real-world engineering constraints rather than abstract coding puzzles. Expect to be pushed on your design choices and your reasoning for prioritizing one solution over another.

PracHub interview research ↗
How much time should I spend preparing?

Preparation should be thorough and focused on your past projects. Dedicate time to reviewing your own code and understanding the "why" behind your past architectural decisions, as interviewers will dig deep into your experience.

PracHub interview research ↗
What differentiates successful candidates?

Successful candidates demonstrate a "safety-first" mindset and an ability to collaborate across engineering disciplines. Showing that you care about the end-user experience and the reliability of the transit network will set you apart.

PracHub interview research ↗
Is the work environment collaborative?

Yes, you will work closely with other engineering teams. The culture values clear communication, rigorous testing, and a shared commitment to keeping Toronto moving.

PracHub interview research ↗
Sources & methodology 3 sources ↗

No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.