A Software Engineer at WeRide.Ai sits at the absolute forefront of the autonomous vehicle (AV) revolution. In this role, you are not simply writing standard web or backend applications; you are building the core software brain, cloud infrastructure, and safety-critical systems that pilot L4 autonomous vehicles. Your work directly impacts the safety, efficiency, and intelligence of robotaxis, robobuses, robovans, and robosweepers operating in complex, dynamic urban environments across the globe.
The engineering challenges at WeRide.Ai are incredibly diverse and technically demanding. Depending on your specific team alignment—whether it is Systems Engineering, Perception, Motion Planning, Mapping & Localization, or Cloud Infrastructure—you will deal with massive data scale, ultra-low latency requirements, and highly complex algorithmic problems. You will design systems that process petabytes of sensor data, optimize real-time path planning under tight millisecond constraints, and implement robust cloud pipelines that manage global fleets.
This position is ideal for engineers who thrive in high-stakes environments where software meets the physical world. At WeRide.Ai, you will collaborate with world-class experts in machine learning, robotics, and high-performance computing. To succeed here, you must possess deep technical curiosity, a rigorous approach to system design, and the resilience to solve highly ambiguous, open-ended engineering challenges.
Initial Recruiter Screening
reportedThe person on this call usually cannot evaluate your code and does not need to. They write a short paragraph, and that paragraph is what a hiring manager skims when deciding who to put on your loop. So the test is not whether your work was hard, it is whether a non-engineer can repeat it correctly. Name systems by what they did rather than by their internal codename, give each project a shape (what was breaking, what you changed, what happened after), and keep the whole walkthrough near ninety seconds. Depth that cannot survive a paraphrase reads as vagueness.
What to demonstrate
- Whether a non-engineer can restate your projects without distorting them, since their paraphrase is what travels to the hiring manager, not your sentences
- Whether each project has a shape rather than a stack list: the failure or constraint, the change you made, the result and how it was measured
- Whether you can say what was yours inside a team project without either inflating it or disappearing into the plural
How to prepare
- Rewrite each headline project as two sentences with no internal system names and no acronyms outside your company, then say them to someone outside engineering and have them repeat them back. Fix whatever came back wrong
- Attach one measured number to each project: the baseline, the change, and the window it was measured over. Where nothing was ever measured, say that plainly rather than reaching for a plausible percentage
- Time the background walkthrough against a clock. If it runs past two minutes, compress the earliest role to a single clause and spend the recovered time on the most recent one
Online Technical Assessment
reportedThe same problem is scored by two different mechanisms depending on the format, and preparing for one does not cover the other. With a person watching, partial progress is visible and a hint is a correction you can absorb; silence is the expensive failure, because nobody can read a half-written function. With an automated grader there is no partial credit for what you were about to do, nobody to ask, and the worked examples in the prompt are the entire specification. Read them as a contract, down to whether an empty result should be an empty list or no output at all.
What to demonstrate
- In a live session, whether your commentary tracks what your hands are doing, and whether a hint redirects you or gets defended against
- In an automated one, whether you cover the cases the examples do not show, since the hidden cases are where the score moves
- Whether you manage the clock on purpose: abandoning an approach that is not converging while there is still time to write something simpler that finishes
How to prepare
- Have someone hand you a problem and feed you one deliberately wrong hint. Practise testing it against a concrete case instead of accepting or rejecting it on authority.
- Do one timed run a week in a plain browser editor with autocomplete, linting and your own snippets switched off, which is closer to what these environments give you
- For the automated format, write the harness before the solution: a main that feeds the worked examples plus an empty and a single-element case and prints expected against actual, so a wrong submission is caught by you first
Technical Phone Screen
reportedBefore anything technical happens, someone has to decide which rung of the ladder your loop is calibrated to, and that decision sets the bar for every round after it. It comes from how you describe scope, not from your title, because titles do not convert cleanly between companies. The weak version of the answer is team size and years. The strong version names the largest change you shipped where nobody reviewed the design, what would have broken if you had been wrong, and what you were paged for. Get the level said out loud on this call, because the range and the loop both follow from it.
What to demonstrate
- Whether the scope in your own account maps onto a level the team actually has an opening at, so a mismatch ends the process cheaply rather than after four interviewers have spent a day
- Whether your title needs re-mapping: the same word describes very different amounts of independent decision-making at a twenty-person company and a ten-thousand-person one
- Whether your compensation expectation can be filled at that level in the structure the role pays in, which is why the number gets asked for before any engineer is scheduled
How to prepare
- Write down two changes from the last two years: the largest one you designed with nobody reviewing the design, and the largest one where someone more senior did. Lead with the first when scope comes up, and be ready to say which parts of the second were yours
- Ask which level the loop is calibrated to and what changes at the level above it, then plan your weeks from that answer rather than from the posting
- Settle a total-compensation range beforehand with the split named, base against bonus against equity and its vesting period, so a question about numbers gets a number instead of the word market
Virtual Onsite Loop
reportedNobody in the room with you decides this. Interviewers typically write their rounds up separately, often before seeing anyone else's, and the outcome is settled later from those write-ups. A split panel gets resolved by whichever note carries specific evidence, so what you want out of each room is one concrete thing that person could write down: a bug you caught yourself, a trade-off you named, a decision you owned. The rest is arithmetic. The project you describe in a behavioural conversation is often the same system you sketched an hour earlier, and the two accounts have to agree.
What to demonstrate
- Whether the scale, team size and timeline you attach to a project hold steady when that project resurfaces in a different round
- Whether each interviewer leaves with a specific thing to cite rather than a general impression of competence
- Whether a trade-off you defended in one round survives a challenge in another, instead of being quietly swapped for the answer the new interviewer seemed to want
- Whether a question you have already answered earlier in the day gets the same answer at the same depth, without visible impatience
How to prepare
- Write a one-page sheet per project fixing the figures you will quote — request volume, data size, team size, elapsed time, what broke — and say them aloud from the sheet until they come out identical every time
- For each round on the schedule, decide in advance the one sentence you want in that person's notes, then check in a mock that you said it outright instead of leaving it to be inferred
- Have someone ask you the same project question twice, an hour apart, and diff the two answers for numbers that moved or a trade-off that reversed
PracHub editorial advice for the preparation topics above.
Treating a timed-out write as a failed write
A timeout says the response did not arrive, not that the work did not happen; the server may well have committed and then lost the connection. Retrying a non-idempotent create after a timeout is the standard way to end up with two of something, and those duplicates land precisely when the system is already degraded and least able to absorb them. The discipline is to treat a timeout as unknown: either the write carries an idempotency key so the retry is safe by construction, or the client re-reads authoritative state before deciding what to do, and the interface says unknown rather than showing a failure that invites a second click.
Checking a quota with a select and then writing
Under read-committed isolation, two concurrent transactions both observe a count below the limit and both insert, so the limit is exceeded by exactly the concurrency. Repeatable read does not rescue it either: it provides a stable snapshot, and this is write skew, which snapshot isolation permits by design. The options are serialisable isolation, which detects the conflict and aborts one transaction with a serialisation failure and therefore obliges the caller to retry; a single statement with the predicate inside the write; or a constraint that makes the surplus insert fail outright. The reason this pattern survives review is that it is correct in every test that runs one request at a time.
Saying 'eventually consistent' without naming the anomaly a user would see
Describe the concrete symptom you are choosing to accept: the author reloads and their own comment is missing for two seconds, or two devices show different balances for a minute. The class of consistency model is a technical label; the tolerable anomaly is the actual product decision.
Assuming the input fits in memory
Ask how large the input is in bytes before committing to an in-memory algorithm; beyond that point the options are a single streaming pass, an external sort with bounded buffers, or a sketch that trades exactness for constant memory. An algorithm that assumes random access to the whole input is a different algorithm from one that sees each element once.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Implement a Least Frequently Used (LFU) Cache with standard O(1) opera…
Implement a Least Frequently Used (LFU) Cache with standard O(1) operations.
Approach
- Restate the input: its shape, its size, and what is guaranteed about it.
- Choose the data structure from the access pattern, not from familiarity.
- Name the brute-force solution and its complexity before improving on it.
Follow-up
- Which test case would catch an off-by-one here?
- What is the worst case, and how likely is it on real data?
Design a custom folder system that supports creation, deletion, and mo…
Design a custom folder system that supports creation, deletion, and move operations, and then returns the total count of active folders.
Approach
- State the target complexity and say which constraint rules the naive version out.
- Walk one small example through your approach before writing the whole thing.
- Name the brute-force solution and its complexity before improving on it.
Follow-up
- What is the worst case, and how likely is it on real data?
- Which test case would catch an off-by-one here?
Given a binary tree, write a program to find and return all the bottom…
Given a binary tree, write a program to find and return all the bottom-most leaf nodes.
Approach
- Name the brute-force solution and its complexity before improving on it.
- Choose the data structure from the access pattern, not from familiarity.
- State the target complexity and say which constraint rules the naive version out.
Follow-up
- Which test case would catch an off-by-one here?
- What is the worst case, and how likely is it on real data?
What are move semantics and perfect forwarding in C++? Explain how `st…
What are move semantics and perfect forwarding in C++? Explain how std::move and std::forward work under the hood.
Approach
- Reach for the cheapest primitive that closes the race, not the broadest lock.
- Identify the window where an invariant is briefly untrue.
- Name what is shared across threads and what owns each piece of state.
Follow-up
- How would you prove the race exists rather than suspect it?
- What happens if two callers reach this at the same time?
How do you implement a thread-safe producer-consumer queue using C++ c…
How do you implement a thread-safe producer-consumer queue using C++ concurrency primitives?
Approach
- Reach for the cheapest primitive that closes the race, not the broadest lock.
- Distinguish a value from a reference to it, and say which one you handed out.
- Identify the window where an invariant is briefly untrue.
Follow-up
- Where could this allocate more than you expect?
- How would you prove the race exists rather than suspect it?
Hold a tenant to a trailing sixty-second request limit
The gateway must hold each tenant to R requests in any trailing 60 seconds, in aggregate across three regions and every pod, within a budget of under 10 ms added p99. Peak is 30,000 requests/second across 200,000 active tenants, and traffic is heavily skewed toward a handful of them. Give an exact single-process algorithm with its amortised per-request cost and its memory per tenant, then a bounded-memory approximation and the worst-case overshoot it actually admits. Say what the distributed version does when the counter store is unreachable.
Approach
- Exact, single process: a per-tenant deque of request timestamps. On arrival, pop from the front while
front <= now - 60s, then admit if the remaining length is below R and push. Each timestamp is pushed once and popped once, so the cost is O(1) amortised. The O(R) version is the one that re-filters the whole deque on every request. - Quote the memory. R = 1,000 across 200,000 active tenants is up to 2 x 10^8 timestamps at 8 bytes, about 1.6 GB, and that is the worst case rather than the mean, because the long tail of small tenants holds almost nothing. Skew helps you here and hurts you in the sharding decision.
- Bounded alternative, with its real bound stated: a fixed 60-second counter is O(1) memory but admits close to 2R across a 60-second span straddling a boundary. The weighted two-bucket estimate,
prev * (60 - elapsed)/60 + cur, is better on smooth traffic but assumes the previous window's arrivals were uniform; an adversary packing them at the end of that window is undercounted and can still approach 2R. Say that rather than calling it exact. - Token bucket is the usual gateway answer and a different contract: O(1) state per tenant (
tokens,last_refill), a sustained rate, and a deliberate burst allowance equal to the bucket size. Choose it when a burst is acceptable and the log when the limit is contractual. - Distributed: the limit is per tenant in aggregate, so a local bucket of R/N per pod is wrong in both directions under skew. A tenant landing on one pod is throttled at R/N, and a tenant spread evenly across pods exceeds R. The shared check must be a single atomic round trip, one script or one increment-and-compare, never read-then-write, and it must fit inside the 10 ms p99 budget.
- Decide the unavailable case in advance and write it down. Failing open keeps the product up and lets a tenant exceed its limit for the duration; failing closed converts a counter-store outage into a full outage. Most gateways fail open on rate limits and closed on authorisation, and those are two separate decisions made separately.
Worked solution 25 min
- Implement the deque version and instrument the per-request pop count, then confirm total pops equal total pushes over a run.
- Generate a burst that places R requests in the last 100 ms of one minute and R more in the first 100 ms of the next.
- Run that burst through the exact deque, a fixed 60-second counter, and the weighted two-bucket estimate, recording admissions in the trailing 60 seconds at every instant.
- Size the memory as R x active tenants x 8 bytes at R = 1,000 and 200,000 tenants, and compare it against what a token bucket would need.
Follow-up
- One tenant sends 40% of all traffic. What does that do to a single counter key, and what do you shard on instead?
- Quotas rather than rate limits: the check is
select used; if used < limit then insert. Name the isolation level that still permits the overshoot, and the two fixes. - How do you return an accurate
Retry-Afterfrom the exact algorithm without a second scan?
Decide which facts an invoice line copies instead of joining
invoice_line_item already denormalises tenant_id, which is reachable through invoice_id, and stores amount_minor even though quantity times unit_price_micros would recompute it. A reviewer asks you to normalise both away, and separately asks whether the tenant's legal name and billing address should be copied onto the invoice header. Decide each case. For every field you keep denormalised, name the read pattern or the invariant that justifies it, the anomaly the copy can develop, and the mechanism that prevents that anomaly here.
Approach
- Split the question into two kinds of copy, because they fail differently. A copy of a currently mutable fact is a cache: it drifts and needs invalidation. A copy of a fact frozen at write time is not a cache at all, it is the record of what happened, and normalising it away destroys information the source no longer holds.
- Keep tenant_id on the line. It costs 8 bytes, it leads every index on the table so no read is ever accidentally cross-tenant, and it turns a wrong join into an empty result rather than another tenant's money. Prevent the drift structurally: a unique constraint on invoice (invoice_id, tenant_id) plus a composite foreign key from the line on (invoice_id, tenant_id) makes a mismatched pair impossible, so the database enforces agreement instead of a code review.
- Keep amount_minor. Rounding must happen exactly once, at a named site, with a stated mode (half-even here). If readers recompute from quantity and unit_price_micros, every reader owns a rounding decision, and half-up and half-even diverge systematically across thousands of lines rather than cancelling out. A check constraint can bound the stored value but deliberately cannot re-derive it.
- Copy the legal name and billing address onto the invoice header, written once and never updated. The statement must show what was true when it was sealed, and the tenant record will change afterwards. This is a snapshot for the same reason
source_rollup_watermarkis stored per line: without it, nobody can reconstruct what the customer was told. - Name the read pattern that pays for all of it. Rendering, dispute response and export are per-tenant, per-period reads over thousands of lines that would otherwise join back to slowly changing dimensions that no longer hold the historical value. The write side is a once-per-period batch, so the extra columns cost nothing that matters.
- Concede the case where the reviewer is right: a mutable operational attribute such as the tenant's current plan name has no business on a line. If a report wants it, join. If a statement needs the plan as of the period, that is another snapshot and it belongs on the header with the rest.
Follow-up
- Write the composite foreign key and the unique constraint it requires on the parent. What does it cost on every line insert, and what does it do to a bulk load?
- A tenant is renamed after being invoiced. Which rows change, and what does the customer see on last quarter's PDF?
- Where does currency live, and what breaks if a tenant's billing currency changes between two periods?
Migrate a live partitioned event table without blocking ingest
usage_event is range-partitioned daily on ingested_at, holds roughly 250M rows per day across 400 live partitions, and is written at 10-40k rows/second. Two changes are required: quantity must move from double precision to numeric(20,6), and a new environment column must become NOT NULL with a default of 'production'. Ingest cannot stop. Give the ordered plan, naming for each step the lock it takes, what that lock blocks, and roughly how long it is held. Identify the one step that cannot be rolled back cleanly once traffic depends on it.
Approach
- Classify the two changes before planning anything. Adding a column with a non-volatile default has been metadata-only since PostgreSQL 11, so it is cheap. Changing double precision to numeric is not binary-coercible, so
alter column ... typerewrites every partition under ACCESS EXCLUSIVE and rebuilds its indexes; on this volume that is hours of blocked ingest and is simply not an option, which is why the plan is expand-and-contract rather than one statement. - Expand: add
quantity_numeric numeric(20,6)andenvironmentwith its default on the parent. Both are catalogue-only but both take a brief ACCESS EXCLUSIVE that cascades to partitions, so run each withlock_timeoutset to a second or two and retry on failure. A queued ACCESS EXCLUSIVE request blocks every reader behind it, which is how a metadata-only change turns into an outage. - Dual-write: deploy producer code that populates both columns on every insert, and leave it running before anything reads the new column. This is the step that cannot be reverted cleanly. Once readers depend on quantity_numeric, reverting the writer leaves rows with a null there, and the gap is only discoverable by re-reading the old column, which the readers have stopped doing.
- Backfill older partitions in batches keyed on the primary key, oldest first, committing every few thousand rows with a pause between batches, and skipping the partition still receiving writes until it rotates. Each batch is an ordinary UPDATE taking row locks only. The cost is bloat and WAL rather than blocking, so watch dead tuples and let autovacuum keep pace instead of wrapping 400 partitions in one transaction.
- Make NOT NULL cheap with the three-step form:
add constraint ... check (environment is not null) not valid(brief ACCESS EXCLUSIVE, no scan), thenvalidate constraint(SHARE UPDATE EXCLUSIVE, scans while reads and writes continue), thenset not null, which from PostgreSQL 12 uses the validated check and skips its own full scan. Do this per partition, then on the parent. - Switch and contract: move reads to the new column behind a flag, verify over a full period that both columns agree on freshly written rows, drop the old column (metadata-only), and only then remove the dual-write. Any index on the new column goes on with CREATE INDEX CONCURRENTLY per partition, since CIC is not supported on a partitioned parent: create the parent index with ONLY, build each child concurrently, then ALTER INDEX ... ATTACH PARTITION until the parent index becomes valid.
Worked solution 45 min
- On a scratch cluster, build 10 partitions of 2M rows each and run a writer at a few thousand inserts/second.
- Run the naive type change and measure how long writes stall and how far ingest lag grows before killing it.
- Run the expand step with
lock_timeout = '2s'while the writer runs, and observe a clean lock timeout and retry instead of a pile-up of blocked readers. - Backfill in 5k-row batches and chart dead tuples and WAL generated per batch.
- Run the not-valid, validate, set-not-null sequence and confirm from
pg_stat_activityand timings that nothing held an exclusive lock through a full scan. - Add an index with CIC per partition plus ATTACH PARTITION and confirm the parent index reports valid only after the last attach.
Follow-up
- A CREATE INDEX CONCURRENTLY fails halfway through the partition list. What state is the table in, how do you detect it, and what do you run?
- The producer computes quantity itself. What happens to a request already in flight when the dual-write deploy lands, and does it matter?
- Give two queries that prove the backfill is complete: one cheap enough to run every minute, one authoritative.
How do virtual machines connect to one another across a physical netwo…
How do virtual machines connect to one another across a physical network? Describe the virtualization of network interfaces.
Approach
- Name the failure you are designing for, then the recovery path.
- State the consistency you need, and where you are willing to be stale.
- Name the read and write paths separately; they rarely have the same bottleneck.
Follow-up
- What would you drop to keep the system up under load?
- How does this behave when that dependency is down for an hour?
What are the architectural differences between virtual machines (VMs) …
What are the architectural differences between virtual machines (VMs) and Docker containers? What are the specific performance advantages of Docker?
Approach
- Choose a partition key and say what query it makes expensive.
- Name the read and write paths separately; they rarely have the same bottleneck.
- State the consistency you need, and where you are willing to be stale.
Follow-up
- What would you drop to keep the system up under load?
- How does this behave when that dependency is down for an hour?
Explain the core components of Kubernetes (K8s) and how it manages con…
Explain the core components of Kubernetes (K8s) and how it manages container orchestration at scale.
Approach
- Fix the scope first: who calls this, how often, and what they do when it fails.
- Choose a partition key and say what query it makes expensive.
- Name the failure you are designing for, then the recovery path.
Follow-up
- What would you drop to keep the system up under load?
- What breaks first when traffic grows ten times?
Sealing a billing period against late-arriving usage
billing seals a tenant's period once the metering watermark passes the period end, prices the sealed rollups against the plan (included allowance, tier boundaries, negotiated discount) and writes invoice_line_item rows: quantity numeric(28,6), unit_price_micros bigint, amount_minor bigint, currency char(3), source_rollup_watermark timestamptz. The job is re-run after failures and two workers may attempt the same tenant. Events legitimately arrive with occurred_at inside the period and ingested_at after it. Specify the seal transition, the idempotency key for every write including the payment-processor call, the rounding position and mode, and the fate of a post-seal event.
Approach
- Make sealing a conditional write rather than a read followed by a write: UPDATE usage_rollup_hourly SET status = 'sealed', sealed_at = now() WHERE tenant_id = $1 AND hour_start >= $2 AND hour_start < $3 AND status = 'open' RETURNING rollup_id. Two concurrent sealers cannot both win because the loser's predicate no longer matches, and the loser learns it lost from an empty result rather than from a lock timeout.
- Gate the seal on the watermark, not on the clock - the period closes when the fold is trustworthy past period_end - but cap the wait, because an unsealed period blocks the whole billing run. Seal anyway after a stated maximum (six hours past period end is a reasonable default) and let whatever arrives afterwards become an adjustment. The trade-off is named in one line: adjustments are cheap, a missed billing cycle is not.
- Make every write converge under re-run. Line items are idempotent on (invoice_id, sku, rate_tier) with ON CONFLICT DO UPDATE permitted only while the invoice is draft; the payment-processor call carries (tenant_id, billing_period_start) as its idempotency key, because a timeout there is an unknown outcome, not a failed one, and a plain retry is how a customer gets charged twice.
- Keep the arithmetic exact and round exactly once. quantity stays numeric, the rate is an integer unit_price_micros in millionths of a minor unit because per-request prices are genuinely below a cent, and amount_minor = round_half_even(quantity x unit_price_micros / 1,000,000) is computed once per line and stored. Tiering walks the boundaries in order emitting one line per (sku, rate_tier) with tier 0 as the included allowance at price zero; the invoice total is the sum of stored amount_minor values and is never recomputed downstream from quantity and rate.
- Handle the post-seal event as a forward-only correction. The sealed rollup is frozen, so the difference between the sealed value and the restated value becomes a new invoice_line_item with kind = 'adjustment' and voided_by_line_id pointing at the line it reverses, carrying its own source_rollup_watermark. Nothing is edited in place, because the original line is the only evidence of what the customer was actually charged and is precisely what a dispute, a refund or an audit asks to see.
Worked solution 35 min
- Write the seal as a single conditional UPDATE ... WHERE status = 'open' RETURNING and state exactly what the losing worker sees.
- Price one line by hand: quantity 4,318,904.250000 at unit_price_micros 1200 gives 5,182.6851 minor units and 5,183 after a single half-even rounding. Then do quantity 2,500,000.000000 at unit_price_micros 1, which lands exactly on 2.5 and rounds to 2 under half-even but 3 under half-up.
- Take four hundred synthetic lines with fractional minor units and compute the total two ways - sum of per-line rounded amounts, and a single rounding of the summed exact amounts - then record the gap.
- Trace one event with occurred_at inside the period and ingested_at two days after the seal all the way to the row that eventually reflects it.
Follow-up
- Two workers start the same tenant's seal a millisecond apart and the winner crashes after sealing but before writing any line. What does the second worker observe, and is the resulting invoice correct?
- Show the divergence between rounding each line and rounding the total once over four hundred lines, and say which direction it goes.
- A customer disputes a charge from two quarters ago. Which rows answer it, and which single design decision made that answer possible?
A rare job-run overwrite that logging makes disappear
About one job run in fifty thousand records billable_seconds matching no observed sandbox lifetime, and a few rows show worker_id changing after finished_at was already set. It does not reproduce: debug logging around the terminal write made it vanish for two weeks before it returned. Runs last from 200 ms to 30 minutes, the lease is 60 seconds and is renewed while a run executes. Give an ordered checklist, the mechanism, and a fix that makes the illegal write impossible rather than merely rarer.
Approach
- Mine the evidence instead of chasing a repro: select rows where updated_at is later than finished_at, or where a terminal status was written twice, and join them to attempt history to recover both writer identities. The defect has already happened tens of times and the rows are the recording.
- State the signature before measuring it. If the cause is a lease that expired while the original worker was stalled, affected runs should cluster where the gap between the last renewal and the terminal write exceeds the lease, and should correlate with worker pause metrics rather than with workload shape.
- Read the disappearance honestly. Logging inside the window changed the timing and lowered the probability; it is evidence about how narrow the window is, not a fix. Reproduce by widening the window on purpose, shortening the lease and injecting a pause between sandbox exit and the terminal write, rather than by adding more instrumentation.
- Name the mechanism precisely: the lease expires during a stall such as a long garbage-collection pause or a brief partition, the run is re-dispatched, and the original worker then wakes and writes its terminal state over the new attempt's row. A lease alone cannot stop this, because the check and the write are separated by the stall.
- Fix by fencing the write itself: UPDATE job_run SET status = $2, finished_at = $3, billable_seconds = $4 WHERE run_id = $1 AND status = 'running' AND lease_token = $5, with zero rows affected interpreted as having been fenced rather than as success. The token lives on the row so the store arbitrates, not the worker's memory.
- Keep the state machine honest: a retry inserts a new row pointing at parent_run_id rather than resetting the old one, and a run whose worker vanished terminates as lost with billable_seconds null, because recording failure asserts an outcome nobody observed and then bills and retries on that assertion.
Follow-up
- The supervisor also emits a usage event on completion. What does the fenced worker do about the event it already emitted, and how does metering absorb it?
- Lease renewal is itself a network call. What happens when a renewal times out, and how does the worker decide whether it still holds the lease?
- Why is lengthening the lease past the longest legitimate run the wrong lever, and what breaks if you do it anyway?
For someone who has spent the last few years shipping features and reading other people's code, and who has not solved a timed problem from a blank file in a long time. Five days rebuild the primitives and the patterns that sit on them, working from invariants rather than remembered solutions, and the last two attach that back to the rest of the loop.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Rebuild the primitives by implementing them
- Implement a dynamic array with doubling growth and an operation counter, then change the growth rule to add a fixed sixteen slots instead, and time both for n of ten thousand, a hundred thousand and a million. The fixed-increment version resizes n/16 times at O(n) each, so its total work is quadratic; doubling is what makes append amortised constant.
- Implement a hash map with separate chaining and a load-factor resize, then insert ten thousand keys engineered to land in one bucket and record what happens to lookup time, so that average-case O(1) becomes a claim with a stated precondition rather than a reflex.
- For dynamic-array append and hash-map insert, write down which cost is amortised rather than worst-case, which single operation pays the whole bill, and what a system with a hard per-operation deadline would have to do instead.
Deliverable: Two working implementations plus a timing table showing the input at which each structure's advertised complexity stops holding.
Practice prompt ↗Practice prompt ↗Practice prompt ↗Worked solution ↗02Arrays under an invariant: two pointers, sliding window, binary search
- Solve longest-subarray-with-sum-at-most-K using a sliding window, then run it on an input containing negative numbers and watch it return the wrong answer: extending the window only moves the sum monotonically when every element is non-negative, and that precondition is the whole reason the technique works.
- Write the binary search that finds the first index satisfying a predicate rather than an exact value, put the loop invariant above the loop in a comment, and verify termination on the two inputs that break careless versions: the empty range, and a range where every element satisfies the predicate.
- Compute the midpoint as lo + (hi - lo) / 2 and write one line on why the obvious (lo + hi) / 2 is a genuine defect in a fixed-width integer type and a non-issue in a language with arbitrary-precision integers.
Deliverable: Three solved problems, each with its invariant written above the loop, plus one recorded input on which the sliding window is provably wrong.
Practice prompt ↗Practice prompt ↗Practice prompt ↗03Sorting, heaps, and the greedy argument that has to be proved
- Solve one top-k problem three ways, by full sort, by a size-k heap, and by quickselect, then write the values of n and k at which each becomes the right choice, along with quickselect's quadratic worst case and why a randomised pivot makes that unlikely rather than impossible.
- Implement bottom-up heapify and count sift-down steps to confirm it does linear work rather than n log n, because most nodes sit near the bottom of the tree and therefore move only a short distance.
- Take interval scheduling by earliest finishing time and write the exchange argument out in full: given any optimal schedule, swapping in the earliest-finishing interval keeps it feasible and no smaller. Then construct the weighted variant where that same greedy fails and name what has to replace it.
Deliverable: A three-way top-k comparison with measured crossover points, one written exchange argument, and one counterexample to a greedy rule that looks almost identical.
Practice prompt ↗Practice prompt ↗04Recursion, memoisation, and the step to a table
- Take one problem with overlapping subproblems, such as edit distance or coin change, instrument the plain recursion with a call counter to show the blow-up, then add memoisation and re-count.
- Convert the memoised version to a bottom-up table and state the two properties you relied on: each subproblem's result depends only on its arguments, and the dependencies form a DAG you can enumerate in order.
- Rewrite one deep recursion with an explicit stack, then find the input length at which the original hits the interpreter's frame limit, which defaults to about a thousand frames in CPython, so you know when the rewrite is required rather than decorative.
Deliverable: One problem in three forms, naive, memoised and tabulated, with call counts for each and the input length at which recursion depth becomes the binding constraint.
Practice prompt ↗Practice prompt ↗Worked solution ↗05Graphs, where most of the work is choosing the traversal
- Implement BFS and DFS over one adjacency list, then answer for each which finds a shortest path in an unweighted graph and which you would use to detect a cycle in a directed graph, including why the in-progress versus finished distinction matters for the second.
- Implement topological sort by in-degree, feed it a graph containing a cycle, and confirm the failure signature is that fewer than V nodes come out rather than an exception, then note that the order it produces is one of several valid ones.
- Run a shortest-path search on a graph with a single negative edge weight and show the wrong answer, then write the precondition Dijkstra actually needs, non-negative weights, because it finalises a node's distance the first time that node is popped, and name the algorithm you would switch to and its own limit.
Deliverable: A small graph library with BFS, DFS and topological sort, plus two inputs that produce documented wrong answers under the wrong algorithm choice.
Practice prompt ↗Practice prompt ↗06One day for everything that is not an algorithm
- Sketch one system only to the depth a coding-heavy loop tends to reach: the endpoints, what the service stores, and the single query pattern that decides the schema. Stop at twenty-five minutes.
- Prepare the project answer for an interviewer who codes, which means rehearsing the two levels they push to: the specific thing you built, and why you chose that approach over the alternative they will name. Open with a number and be ready to say what it excludes.
- Prepare the answer to what you would do differently, choosing a real technical mistake with a specific fix rather than a complaint about process or staffing.
Deliverable: One design sketch at endpoint-and-schema depth, plus a project answer rehearsed to two levels of follow-up.
Practice prompt ↗Practice prompt ↗07Solve out loud, under time
- Do three timed problems at twenty-five minutes each in a plain editor with no autocomplete and no execution until the end, then tally separately the failures that were syntax and the ones that were approach, because those two numbers call for different fixes.
- Narrate one solution from the first sentence, stating the approach and its complexity before writing any code, and rehearse the sentence you will use when you realise mid-solution that the approach is wrong.
- Re-solve from blank the two problems you were slowest on this week and compare the times against the day they first appeared.
Deliverable: A recording of one fully narrated solution and a tally that separates syntax failures from approach failures.
Practice prompt ↗Practice prompt ↗Worked solution ↗Expand any day for tasks and deliverables. Your progress is saved on this device.
Engineers over-index on what they repaired. A stronger answer covers something you knowingly left broken: the alert you tuned down, the data inconsistency you documented instead of chasing, the cleanup you deferred past two quarters. Give the reasoning and the condition that would have reopened it, so it reads as a decision and not as neglect.
Ship metered billing with a named deduplication horizon
Metered billing must be on in three weeks. usage_event is partitioned daily, so its unique index must include the partition key and deduplicates only within a day: a producer retry that crosses midnight, or a replay run a week later, gets through. A cross-partition dedup store is two weeks you do not have. Describe shipping with debt you named in advance: what you shipped, what you wrote down, the detector you added, the trigger and date for paying it off, and what you would have refused to ship under the same pressure.
Approach
- Show you can separate the two kinds of debt, because that distinction is what the question actually probes. Debt that costs engineering time later is shippable on a deadline. Debt that silently corrupts a number a customer gets charged for is not shippable unless the corruption is detectable, and detectability is the whole negotiation.
- Make the exposure narrow and measured rather than gestural. The hole is duplicates whose occurrences straddle a UTC day boundary, plus any replay older than partition retention. Measure it before arguing about it: how often an idempotency_key recurs at all, and the distribution of the gap between first and last occurrence. If the ninety-ninth percentile of that gap is four minutes, the residual risk is a small band around midnight and you can say so numerically.
- Add the detector before the feature, not after. A nightly job counting keys that appear in more than one partition is one grouped scan over recent partitions, and it converts a silent overcount into a page. State what it costs to run and what it fires on.
- Buy the cheap half of the real fix immediately: extend partition retention so the dedup horizon exceeds the producer's maximum retry window plus the longest replay you intend to support. That reframes retention as a correctness parameter rather than a storage cost, which is the sentence you need on record before someone optimises the bill.
- Make repayment mechanical instead of aspirational: a dated entry with a named owner, plus a threshold that pulls the date forward — first detector hit above N events, or first customer dispute. Debt with a trigger gets paid; debt with only a date does not.
- Answer the second half honestly by naming what you would refuse under identical pressure: the sealing path, because a sealed row is frozen and a wrong number there stops being a bug and becomes an adjustment line, a dispute and an audit question.
Follow-up
- The detector fires on forty duplicate events for one tenant, and two of their invoices have already sealed. What happens next?
- Whom did you tell that the billing numbers had a known hole, and in what words?
- Finance asks you to cut storage by shortening partition retention. What do you say, and to whom?
Disclose a cross-tenant webhook delivery to affected customers
An enqueue path took the subscription from one lookup and the payload from another. For nineteen minutes, webhook_delivery rows were created whose tenant_id did not match the subscription's tenant, and eleven payloads were signed and sent to four endpoints belonging to other customers. You hold payload_digest, delivery timestamps and response codes. Describe how you handle a disclosure of this kind: what the records prove, what they cannot prove, what you say before you know everything, the one code change that closes it, and which parts you personally drove.
Approach
- Bound the population before saying anything externally. The affected set is deliveries in the window where the event's tenant and the subscription's tenant differ; the ones that actually left are those with delivered_at set and a 2xx in last_response_code. Attempted and delivered are two different counts and a disclosure has to use the right one in the right sentence.
- Separate what the records prove from what they do not, and say both halves rather than the flattering one. They prove which payloads were signed, where they went, and — through payload_digest — exactly which bytes. They do not prove what the receiving system did with them, and they do not bound the window more precisely than your deploy timestamps do.
- Communicate on the facts you hold, with the scope stated as an upper bound: 'at most eleven payloads, four recipient endpoints, these fields, this window' is more useful and more honest than waiting a day for certainty. The field list matters more than the event count, because a customer cannot assess exposure from 'an event'.
- Name the code change precisely, because this class never originates in the delivery worker. Compare the event's tenant against the subscription's tenant at enqueue and again immediately before the payload is signed, and make the second comparison drop the delivery rather than log a warning. Say why one check is insufficient: the enqueue check protects against the bug you know about, the pre-signing check protects the boundary itself.
- Run the history question in parallel and say so: a query over historical deliveries for the same mismatch tells you whether this was nineteen minutes or a year, and you would rather find the second case yourself than have a customer find it after your disclosure.
- Split the response into workstreams with owners — recipients asked to delete, affected customers notified, the check landed with a test, history swept — and say which you personally drove and which you handed off. Claiming all four is not credible and claiming none is not ownership.
Follow-up
- The historical sweep finds two more instances from last year. What changes in what you have already told people?
- Who approves the wording, and what do you do when you are asked to soften the scope?
- A customer asks you to prove a redelivery contained the same bytes as the original. What do you show them?
Unblock an engineer on a job run that finished twice
An engineer two weeks into the team brings you a job_run row showing status succeeded with an exit_code written by a worker declared dead ten minutes earlier; the retry attempt also shows succeeded. They have spent a day adding logging and are no closer. You have twenty minutes and you do not want to take the keyboard. Describe how you unblock someone: the question you ask first, what you let them find themselves, the concept you name and when, and how you check the next day that they own the fix rather than having watched you produce it.
Approach
- Ask what they expect rather than what they see: which statement set status to succeeded, and what did it check before writing? That question points directly at the update's WHERE clause, which is where the answer lives, and it costs them nothing to answer, so it does not read as a test.
- Let them build the timeline themselves from the row: queued_at, started_at, leased_until, finished_at and worker_id, on both the original run and the retry. Two different worker_ids with a lease expiry between them tells the whole story, and they will see it before you say it.
- Name the concept once the evidence has earned it. A lease bounds time; it does not prevent a write. The store has to reject a stale writer, which means the update carries a fencing token the row compares — update job_run set status = 'succeeded' where run_id = $1 and lease_token = $2 and status = 'running' — and a long garbage-collection pause or a brief partition is enough to produce what they are looking at.
- Point at the second, less obvious half and let them decide it: 'lost' exists in the status enum precisely so a run whose worker vanished is not recorded as failed, because failed asserts an outcome nobody observed and the system then bills and retries on that assertion. Ask them what these two rows should have said.
- Leave them with the next step rather than the patch — a test that kills the first worker after the sandbox exits and before the row is written — and say when you are available again, so the offer is real rather than polite.
- Check ownership the next day by what they produced, not by asking if it went well: a test that reproduces the window proves they understood it; a test that only asserts the new WHERE clause proves they copied it. Ask them to explain it to a third person and listen for whether the explanation is theirs.
Follow-up
- They propose a longer lease instead of a token. What do you say, and what breaks when legitimate runs last thirty minutes?
- How can you tell whether your explanation landed or they simply deferred to you?
- The same engineer hits a variant of this next month. What did you fail to teach the first time?
- 01
Metered billing must be on in three weeks. usage_event is partitioned daily, so its unique index must include the partition key and deduplicates only within a day: a producer retry that crosses midnight, or a replay run a week later, gets through. A cross-partition dedup store is two weeks you do not have. Describe shipping with debt you named in advance: what you shipped, what you wrote down, the detector you added, the trigger and date for paying it off, and what you would have refused to ship under the same pressure.
- 02
An enqueue path took the subscription from one lookup and the payload from another. For nineteen minutes, webhook_delivery rows were created whose tenant_id did not match the subscription's tenant, and eleven payloads were signed and sent to four endpoints belonging to other customers. You hold payload_digest, delivery timestamps and response codes. Describe how you handle a disclosure of this kind: what the records prove, what they cannot prove, what you say before you know everything, the one code change that closes it, and which parts you personally drove.
- 03
An engineer two weeks into the team brings you a job_run row showing status succeeded with an exit_code written by a worker declared dead ten minutes earlier; the retry attempt also shows succeeded. They have spent a day adding logging and are no closer. You have twenty minutes and you do not want to take the keyboard. Describe how you unblock someone: the question you ask first, what you let them find themselves, the concept you name and when, and how you check the next day that they own the fix rather than having watched you produce it.
Is this an official Weride.Ai interview guide?
No. It is PracHub's own research and practice material for the Software Engineer role at Weride.Ai. Rounds and questions reflect what candidates have reported, not a process Weride.Ai has published, and they change over time. Confirm the current format and scope with your recruiter.
PracHub interview research ↗How difficult is the WeRide.Ai interview process compared to other tech companies?
The technical bar is exceptionally high, particularly regarding the Online Assessment and coding rounds. Expect questions that lean heavily toward Leetcode medium/hard and hard difficulties, with a strong focus on low-level system details and manual algorithm implementation.
PracHub interview research ↗Is there a specific programming language requirement for the interviews?
While you can use Python or Java for general algorithmic rounds, C++ is highly preferred and often mandatory for systems, embedded, and motion planning roles. You will be expected to answer deep C++ conceptual questions regardless.
PracHub interview research ↗What is the company culture and working style like at WeRide.Ai?
The culture is fast-paced, highly technical, and deeply collaborative. Because of close coordination with global engineering offices, some roles may require evening meetings (typically between 7:00 PM and 9:00 PM EST) to sync with teams in different time zones.
PracHub interview research ↗How quickly does WeRide.Ai make hiring decisions after the onsite loop?
Decisions are typically made during weekly hiring committee meetings, which usually occur on Fridays. Candidates often receive updates or feedback within a few business days following these meetings.
PracHub interview research ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01PracHub interview research ↗
PracHub editorial research into this company and role, maintained with this guide. Candidate-reported, not an employer publication.
PracHub page · Accessed 2026-09-24 - 02PracHub Software Engineer practice ↗
Cross-company practice questions for this role.
PracHub page · Accessed 2026-09-24 - 03PracHub interview preparation framework ↗
The framework the preparation plan follows.
PracHub page · Accessed 2026-09-24