Design a DAG task graph with cycle rejection and a deterministic execution order
Role: Software Engineer
Category: Software Engineering Fundamentals
Difficulty: medium
Interview Round: Other
Design a directed acyclic graph (DAG) of tasks that manages tasks and their dependencies. Each task is identified by a unique string `taskId`. A task can only be executed after every task it depends on has finished executing.
The graph must always remain acyclic: any dependency that would introduce a cycle must be rejected. The system should also support querying a valid topological execution order of all currently registered tasks.
When multiple tasks are ready to execute at the same time, ties are broken in lexicographic order of `taskId`, so the output is deterministic across runs.
Implement a class `DAGTaskGraph` with these methods:
- `addTask(taskId: str) -> bool`: register a new task. Return true if it was added, false if a task with the same id already exists.
- `addDependency(taskId: str, dependsOn: str) -> bool`: declare that `taskId` depends on `dependsOn`. Return false if either task is missing, the edge already exists, or it would introduce a cycle; otherwise return true.
- `execute(taskId: str) -> bool`: mark the task as executed. Return false if the task is missing, already executed, or has any unfinished prerequisite; otherwise return true.
- `getExecutionOrder() -> List[str]`: return a deterministic topological ordering of all registered tasks, breaking ties by lexicographic `taskId`. Return an empty list if no tasks exist.
Example 1 (a small build pipeline):
```python
graph = DAGTaskGraph()
graph.addTask("build") # -> True
graph.addTask("test") # -> True
graph.addTask("lint") # -> True
graph.addTask("deploy") # -> True
graph.addTask("test") # -> False (already registered)
graph.addDependency("test", "build") # -> True (test depends on build)
graph.addDependency("deploy", "test") # -> True
graph.addDependency("deploy", "lint") # -> True
graph.addDependency("deploy", "lint") # -> False (edge already exists)
graph.addDependency("deploy", "docs") # -> False (docs is not a task)
graph.getExecutionOrder() # -> ["build", "lint", "test", "deploy"]
graph.execute("test") # -> False (build has not run)
graph.execute("build") # -> True
graph.execute("build") # -> False (already executed)
graph.execute("test") # -> True
graph.execute("deploy") # -> False (lint has not run)
graph.execute("lint") # -> True
graph.execute("deploy") # -> True
```
Build and lint have no prerequisites, so both are ready at the start and the tie-break places build first. Once build is placed, test becomes ready too, and lint sorts before test. Deploy needs both test and lint, so it comes last.
Example 2 (a rejected cycle):
```python
graph = DAGTaskGraph() # empty graph
graph.addTask("a") # -> True
graph.addTask("b") # -> True
graph.addTask("c") # -> True
graph.addDependency("b", "a") # -> True (b depends on a)
graph.addDependency("c", "b") # -> True (c depends on b)
graph.addDependency("a", "c") # -> False (a runs before b, b before c, so c cannot run before a)
graph.getExecutionOrder() # -> ["a", "b", "c"]
```
```hint When an edge closes a cycle
The graph is acyclic before each insertion. A new edge closes a cycle only when a path already runs the other way between its two endpoints.
```
```hint Making the order deterministic
Kahn's algorithm keeps a set of tasks whose prerequisites are all placed. Choose a container for that set that always hands back the smallest id.
```
### Constraints & Assumptions
- `1 <= taskId.length <= 20`
- `taskId` consists of lowercase English letters and digits.
- At most ${10^4}$ calls to `addTask`.
- At most ${10^5}$ calls to `addDependency`.
- At most ${10^4}$ calls to `execute` and `getExecutionOrder` combined.
### Clarifying Questions to Ask
- Should `getExecutionOrder` list every registered task, including tasks already executed, or only the ones still pending?
- Can a dependency be added to a task that has already been executed, and should that call succeed?
- Is lexicographic order plain character order, so that `"a10"` sorts before `"a9"`?
- Will tasks or dependencies ever need to be removed?
- How often is `getExecutionOrder` called compared with the methods that change the graph?
### What a Strong Answer Covers
- A graph representation that supports both the cycle check and the prerequisite check, with the cost of each method stated.
- Cycle detection at insertion time, including self-dependencies and the correct direction for the reachability search.
- A topological sort whose tie-break produces exactly one order, and its complexity.
- Every case where `addTask`, `addDependency` and `execute` return false.
- How the design behaves near the stated limits, especially ${10^5}$ dependency insertions.
### Follow-up Questions
- Each cycle check can walk the whole graph. How would you make the common case of `addDependency` cheaper?
- How would you avoid recomputing the full order on every `getExecutionOrder` call?
- How would you add `removeDependency` and `removeTask`?
- How would you return the tasks that are ready to execute right now, in lexicographic order?
Overview: Implement a task dependency graph that registers tasks, rejects any dependency that would create a cycle, runs a task only after its prerequisites finish, and returns one deterministic topological order. It tests graph modeling, reachability checks, Kahn's algorithm with a min-heap and careful handling of every failure case.