As a Software Engineer at Southern California Edison (SCE), you are at the intersection of critical infrastructure and modern technology. Your work directly supports the reliable delivery of power to millions of residents and businesses across Southern California. You are not just writing code; you are building, maintaining, and scaling the software systems that underpin the power grid, manage complex utility operations, and facilitate the transition toward a cleaner energy future. The role involves high-stakes problem solving where your contributions can impact grid safety, operational efficiency, and customer service. You will collaborate with cross-functional teams—including electrical engineers, data scientists, and operations managers—to tackle unique challenges ranging from wildfire mitigation software to advanced grid automation. This position offers the rare opportunity to apply software engineering rigor to physical systems, making it a highly influential role within the company. ##### Tip While technical prowess is essential, SCE values candidates who understand how their software impacts the physical world. Be prepared to discuss how your technical solutions serve the broader mission of safety and grid reliability.
Initial Screening
reportedStarts with a personality or technical assessment to evaluate basic qualifications.
What to demonstrate
- Starts with a personality or technical assessment to evaluate basic qualifications
- Depth in Behavioral Interviewing
How to prepare
- Be able to walk your CV end to end in two minutes, and say why this company specifically.
- Have your salary expectations, notice period and location constraints ready, and ask for the rest of the loop in writing.
Panel Interviews
reportedOne or more rounds of interviews conducted by panels of 3–4 people, including hiring managers and peer engineers.
What to demonstrate
- One or more rounds of interviews conducted by panels of 3–4 people
- Including hiring managers and peer engineers
How to prepare
- Answer aloud and timed: How do you handle situations where you are wrong about a technical calculation or design decision?
- Answer aloud and timed: Give an example of a time you had to think on your feet to solve a difficult problem.
Behavioral Assessment
reportedFocus on assessing how candidates fit into the existing team culture using the STAR method.
What to demonstrate
- Focus on assessing how candidates fit into the existing team culture using the STAR method
- Depth in Behavioral Interviewing
How to prepare
- Prepare three examples from your own work, each with a decision you made and an outcome you can quantify.
- Re-read the description of the behavioral assessment above and write down what you would ask to confirm before it.
Technical Evaluation
reportedPrepare for potential 'whiteboard-style' or design-based questions during the final stages.
What to demonstrate
- Prepare for potential 'whiteboard-style' or design-based questions during the final stages
- Depth in Behavioral Interviewing
How to prepare
- Answer aloud and timed: What are the fundamental differences between a fuse and a circuit breaker?
- Answer aloud and timed: Can you explain your experience with database design (SQL/Oracle) and why it is critical for utility systems?
1 candidate reports. Individual accounts describe a particular role and hiring cycle.
Southern California Edison Software Engineer interview: STAR panel and electrical concepts
I started with a talent-acquisition recruiter call. Because I matched the role requirements, I moved to a four-person panel interview. They took turns asking questions, so the conversation was structured but moved quickly as each interviewer joined in. Most questions were behavioral and expected STAR-style answers. I was pressed about past experience and how I handled particular situations, with…
Read full experiencePracHub editorial advice for the preparation topics above.
Research the company mission
Understand how Southern California Edison serves its customers and the challenges of the modern power grid.
Practice the STAR method
Do not just tell a story; structure it with a clear Situation, Task, Action, and Result to ensure you hit all the points interviewers are grading.
Prepare for panel dynamics
You may be interviewed by multiple people at once. Maintain eye contact with the person who asked the question, but acknowledge the rest of the panel during your response.
Some assessments used by SCE are pass/fail and can have a waiting period of up to 6 months if you do not pass
Take these assessments seriously and ensure you have a quiet, uninterrupted hour to complete them.
Choose a category, try a prompt, then open its approach, worked solution or follow-up when you need it.
Find overlapping job attempts and peak concurrency from lease records
A day of job_run history yields about 50,000,000 attempt records: (job_run_id, job_type, attempt, started_at, finished_at which is NULL when the worker died, lease_expires_at). Leases expire on a clock, so a job that outran its lease ran twice. Produce (a) every job_run_id whose attempts overlapped in wall-clock time and (b) the peak number of simultaneously running attempts per job_type with the minute it occurred. Target O(n log n). State how you treat a NULL finished_at and what clock skew does to your answer.
Approach
- Define the interval before sorting anything: an attempt occupies [started_at, COALESCE(finished_at, lease_expires_at)). finished_at is observed and lease_expires_at is only a promise, so every attempt without a finish contributes an estimate and the whole result is a lower bound on overlap rather than an exact count.
- For peak concurrency, sweep: emit 2n endpoints, sort by (timestamp, kind) with ends ordered before starts at equal timestamps, then walk the sequence maintaining a counter per job_type and record each type's maximum with its timestamp. O(n log n) dominated by the sort, O(n) space, or O(1) extra if the sort is external and the walk streams.
- For overlap detection, do not compare attempts pairwise. A single global sort by (job_run_id, started_at) gives both the grouping and the order; within a group, keep the maximum end seen so far and report an overlap exactly when the next start is less than that running maximum, which is one linear pass after the sort.
- Half-open intervals matter and are easy to get wrong: with closed intervals an attempt ending at the same millisecond another begins reads as concurrency two, and across 50,000,000 records that artefact swamps the real signal.
Follow-up
- A handler is not idempotent and you have found 400 overlapping jobs. Which of them actually caused damage, and what would you query to find out?
- Peak concurrency for one job_type is 4 against a configured cap of 4. Is the cap working, or is the data hiding attempts that never started?
Merge partitioned event streams into one ordered feed with bounded lateness
The read-model service consumes 64 log partitions carrying about 4,000 events per second in total. Each partition is ordered within itself, but partitions drift by up to 30 seconds, and the activity feed must present a tenant's events in occurred_at order. Produce the merge. State its complexity, the buffer it requires in events and in bytes, what happens when one partition is idle, and what you do with an event that arrives after you have already emitted its position. Payloads average 1 KB.
Approach
- Merge with a min-heap over the 64 partition heads keyed on (occurred_at, event_id): O(log P) per event and O(n log P) overall. The tie-break on event_id is what makes the output deterministic when two partitions carry the same millisecond, which matters because the feed is paginated and a non-deterministic order reorders pages under the reader.
- Emitting the heap head is only correct once every partition has produced everything up to that timestamp, so the emit condition is a watermark: the minimum across partitions of the highest occurred_at seen, less the allowed lateness. Events are held until the watermark passes them, which is what turns individually ordered streams into a jointly ordered one.
- Size the buffer from the lateness rather than guessing: 4,000 events per second times 30 seconds is 120,000 buffered events, and at 1 KB each about 120 MB of heap. That number is the real price of the ordering guarantee and belongs in front of whoever asked for it.
- Handle the idle partition explicitly, because it fails the feed rather than corrupting it: a partition with no traffic never advances its own maximum, so the watermark freezes and output stops entirely. Either every partition emits a periodic idle marker carrying the broker's current time, or the watermark falls back to wall clock for a partition silent beyond a threshold.
Follow-up
- The lateness budget is raised to five minutes. What is the new buffer, and what besides memory changes?
- The consumer restarts. Where does it resume from, and what does the feed look like for the first 30 seconds?
Collapse a redelivered event batch into per-aggregate high-water marks
You drain a batch of up to 5,000,000 events, each (aggregate_id BIGINT, aggregate_version INT, event_type, payload). The log guarantees order within one aggregate only; the batch merges 64 partitions, and a relay failover has redelivered a range, so an older version for an aggregate can appear after a newer one. Given a map of last_applied_version per aggregate, produce the events worth applying, at most one per (aggregate_id, version), plus the count discarded. Target O(n) time. State the memory for 2,000,000 distinct aggregates and what you do when it does not fit.
Approach
- One pass, one hash map from aggregate_id to the highest version kept, and a discard counter. An event whose version is at or below last_applied_version for its aggregate is dropped without further work, which is the whole reason the event carries its version rather than a delta. O(n) expected time, O(d) space in distinct aggregates.
- Keep the maximum, never the last occurrence. The redelivered range means the final appearance of an aggregate in the batch can be an older version than one seen earlier in the same batch, so last-wins applies stale state over newer state and the projection regresses with no error anywhere.
- Cost the memory instead of calling it large: an 8-byte key plus a 4-byte version is 12 bytes of payload, and an open-addressed table held at a 0.7 load factor costs roughly 17 bytes per entry before per-slot metadata, so 2,000,000 aggregates is tens of megabytes in a native layout and several times that in a runtime that boxes both key and value.
- If the distinct set exceeds memory, partition on hash(aggregate_id) mod P and reduce each partition independently. Every event for one aggregate hashes to the same partition, so the per-partition result is exact and the merge is concatenation rather than a second reduction.
Follow-up
- The payload is a patch rather than a snapshot, so applying only the highest version loses the intermediate changes. What changes in your reduction?
- How do you detect that version 7 arrived while version 6 was never delivered, and what should the consumer do about the gap?
Hold a per-tenant active cap against concurrent creates
A tenant on the standard plan may hold at most 50 resources with status='active'. The create handler runs SELECT count(*) FROM resource WHERE tenant_id = $1 AND status = 'active', compares to 50, then inserts. Two creates arrive 3 ms apart on different instances and the tenant lands at 51. Name the anomaly, say whether PostgreSQL 16 READ COMMITTED or REPEATABLE READ prevents it and why, then give an implementation that holds the cap at READ COMMITTED with the exact statements. Finally, say what changes when the cap is 'at most one running export per tenant' on job_run.
Approach
- Name it: write skew. The two transactions read an overlapping set and write disjoint rows, so there is no row-level conflict for the engine to detect and each commit is individually legal.
- Rule out the levels precisely. READ COMMITTED takes a fresh snapshot per statement and takes no lock on the counted rows, so both see 49. PostgreSQL's REPEATABLE READ is snapshot isolation: it removes non-repeatable reads and phantoms within the snapshot but still admits write skew, because the anomaly is not a re-read of a changed row, it is a read of a set that a concurrent transaction invalidates. Only SERIALIZABLE closes it, by tracking the read dependency and aborting one transaction with SQLSTATE 40001 — a guarantee that exists only if the application re-runs the whole transaction from the read.
- Convert the set predicate into a single-row conflict: keep tenant.active_resource_count and run UPDATE tenant SET active_resource_count = active_resource_count + 1 WHERE tenant_id = $1 AND active_resource_count < 50 in the same transaction as the INSERT. Zero affected rows is the cap, returned as 409. The row lock serialises the decision at any isolation level, and contention is bounded to one tenant's row — which is also the fair-scheduling unit, unlike a global counter that would convoy every tenant behind one row.
- State the cost you just took on: a counter is a second source of truth that can drift, so every path that changes status must adjust it inside the same transaction, and a periodic reconciliation has to exist, with resource_revision as the authority for what the count should have been.
Follow-up
- A resource moves from archived back to active. Which statements change, and what breaks if the counter update and the status change land in different transactions?
- The cap becomes plan-dependent and a plan can change mid-month. Where does the number 50 live, and who reads it?
Stop tag and share joins from fanning out a page
resource_tag is (resource_id, tag_id) with PK (resource_id, tag_id); resource_share is (resource_id, shared_with_user_id, permission). The tagged-and-shared listing inner-joins resource to both, filters tenant_id, tag_id = ANY($2) and shared_with_user_id = $3, orders by updated_at DESC and takes 50. Pages come back with fewer than 50 distinct resources and the total in the header is far too high. Explain the row multiplication, rewrite both the page query and the count query so each is correct, and name the index each one needs. PostgreSQL 16.
Approach
- Do the arithmetic against the predicates that are actually there. An inner join emits one row per matching child row, and both joins are filtered: tag_id = ANY($2) admits only the requested tags, shared_with_user_id = $3 admits one user's share rows. So a resource holding three of the requested tags and shared with $3 once yields three rows, not one — the multiplier is its count of matching tags times its share rows for that single user, and that second factor is 1 unless the table admits duplicate (resource_id, shared_with_user_id) pairs. LIMIT 50 then limits rows rather than resources, and COUNT(*) counts pairs — the header is the product, not the population.
- Reject DISTINCT as the fix. It deduplicates after the product has been built, so the planner must materialise and sort the fanned-out set before the LIMIT can apply, and it leaves any SUM or AVG in the same select list wrong.
- Rewrite both filters as semi-joins, keeping resource as the only row source: AND EXISTS (SELECT 1 FROM resource_tag rt WHERE rt.resource_id = r.resource_id AND rt.tag_id = ANY($2)) and the same shape against resource_share. A semi-join stops at the first match per resource and preserves the driving index order, so ORDER BY updated_at DESC, resource_id DESC LIMIT 50 still stops after 50 rows.
- Count with the same predicates and no join at all: SELECT count(*) FROM resource r WHERE r.tenant_id = $1 AND r.status = 'active' AND EXISTS (...) AND EXISTS (...). Nothing multiplies a resource, so the number is the population.
Follow-up
- The filter changes from 'any of these tags' to 'all of these tags'. Rewrite it and state what it costs relative to the ANY form.
- A resource can be shared with the same user twice under different permissions. Does your count change, and should it?
How would you approach preventing wildfires in relation to power lines from a software perspective?
How would you approach preventing wildfires in relation to power lines from a software perspective?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
What are the fundamental differences between a fuse and a circuit breaker?
What are the fundamental differences between a fuse and a circuit breaker?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
How would you draw a one-line diagram of a power system including main components like transformers and relays
How would you draw a one-line diagram of a power system including main components like transformers and relays?
Approach
- Clarify what is being asked and what a complete answer contains.
- State your assumptions explicitly before working the problem.
- Say what you would check first and why it is the highest-information step.
- Work from the requirement backwards to the design.
Follow-up
- What assumption would you test first?
- How would you know your answer was wrong?
Exports duplicate a row range about once a week
Roughly once a week an export writes a file containing a duplicated range of rows. The affected job_run rows show attempt = 1, status = succeeded, one started_at, and a lease_owner naming a different host from the one whose logs show the job starting. Leases last 30 seconds and are heartbeated every 10 from inside the handler; lease_expires_at is computed on the worker and compared against the database's now(). Find the mechanism, and give a fix that holds even if you cannot fix the clocks.
Approach
- Start from the fact that eliminates the obvious answer. attempt = 1 means no retry was recorded, so this is not a re-run after failure; two workers ran the same row concurrently and the takeover path never touched the counter. lease_owner naming a host other than the one that started the job is the same statement from the other side.
- Enumerate the mechanisms that cause a premature takeover, then find the signal that separates them. Either the lease genuinely expired because the heartbeat did not fire, which is what happens when the heartbeat runs on the handler's own thread and the handler makes a long blocking call, or it only appeared expired because two clocks disagree, since lease_expires_at is written from the worker's clock and evaluated against the database's. The discriminator is the distribution: incidents clustered on the longest exports indict the heartbeat, incidents clustered on one host indict skew. Measure both, and measure each host's offset against the database directly.
- Read the reclaim query precisely. In PostgreSQL now() is transaction start time, not statement time, so a reclaimer holding a long transaction compares against an older timestamp than expected; clock_timestamp() is the statement-time function. This is worth ruling in or out before you redesign anything, because it changes which rows look expired.
- Remove the second clock rather than trying to synchronise it. Issue and extend the lease in the database, with lease_expires_at = now() + interval '30 seconds' in both the claim and the heartbeat, so exactly one clock is ever compared and worker skew stops mattering to this predicate.
Follow-up
- The displaced worker has already streamed half the file to object storage. What makes that side effect safe to repeat?
- You now count takeovers. What alert fires on that counter, and at what threshold?
Built from the rounds and topics Southern California Edison candidates report.
Prepare, practise & reflect
One practical outcome each day. Spend longer where you need it.
0 / 7 done01Map the Southern California Edison loop
- Write out the reported sequence: Initial Screening, Panel Interviews, Behavioral Assessment, Technical Evaluation.
- For each round, write one sentence on what it is judging, from the description above, and mark the one you are least ready for.
Deliverable: A one-page map of the 4 reported rounds, with the weakest marked.
02Work Behavioral Interviewing
- Spend the session on Behavioral Interviewing, which Southern California Edison candidates report being tested on.
- Write one worked example in Behavioral Interviewing and time yourself on it.
Deliverable: One timed worked example in Behavioral Interviewing.
03Work STAR Method (Situation-Task-Action-Result)
- Spend the session on STAR Method (Situation-Task-Action-Result), which Southern California Edison candidates report being tested on.
- Write one worked example in STAR Method (Situation-Task-Action-Result) and time yourself on it.
Deliverable: One timed worked example in STAR Method (Situation-Task-Action-Result).
04Work Power Systems Domain Knowledge
- Spend the session on Power Systems Domain Knowledge, which Southern California Edison candidates report being tested on.
- Write one worked example in Power Systems Domain Knowledge and time yourself on it.
Deliverable: One timed worked example in Power Systems Domain Knowledge.
05Answer out loud: Behavioral and Leadership
- Answer aloud, timed: Describe a hardship you faced in a professional project and how you overcame it.
- Answer aloud, timed: Tell me about a time you had a disagreement with a colleague; how did you resolve it?
Deliverable: Spoken answers to 2 reported Behavioral and Leadership question(s), under time.
06Answer out loud: Technical and Domain Knowledge
- Answer aloud, timed: How would you approach preventing wildfires in relation to power lines from a software perspective?
- Answer aloud, timed: What are the fundamental differences between a fuse and a circuit breaker?
Deliverable: Spoken answers to 2 reported Technical and Domain Knowledge question(s), under time.
07Dry run for Southern California Edison
- Run one full mock under time, then write down the two questions you most want to ask your interviewers.
Deliverable: A completed timed mock and two questions to ask.
Expand any day for tasks and deliverables. Your progress is saved on this device.
Behavioural rounds judge the decision you made and what it cost.
Describe a hardship you faced in a professional project and how you overcame it.
Describe a hardship you faced in a professional project and how you overcame it.
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Tell me about a time you had a disagreement with a colleague; how did you resolve it?
Tell me about a time you had a disagreement with a colleague; how did you resolve it?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
How do you handle situations where you are wrong about a technical calculation or design decision?
How do you handle situations where you are wrong about a technical calculation or design decision?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Give an example of a time you had to think on your feet to solve a difficult problem.
Give an example of a time you had to think on your feet to solve a difficult problem.
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Why do you want to work for Southern California Edison?
Why do you want to work for Southern California Edison?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Can you explain your experience with database design (SQL/Oracle) and why it is critical for utility systems?
Can you explain your experience with database design (SQL/Oracle) and why it is critical for utility systems?
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
Describe your experience with specific programming languages like Java or Python in a professional setting.
Describe your experience with specific programming languages like Java or Python in a professional setting.
Approach
- Pick a story where you made the decision, not one where you watched it.
- State the situation in two sentences and spend the rest on the reasoning.
- Give the blast radius: what could have broken, and what you measured.
- Name the disagreement and how you resolved it with evidence.
Follow-up
- What would you do differently if you ran that again?
- How did you know your change caused the improvement?
- 01
Describe a hardship you faced in a professional project and how you overcame it.
- 02
Tell me about a time you had a disagreement with a colleague; how did you resolve it?
- 03
How do you handle situations where you are wrong about a technical calculation or design decision?
- 04
Give an example of a time you had to think on your feet to solve a difficult problem.
How long is the typical interview process?
The process can range from a few weeks to a couple of months. While some stages move quickly, the overall timeline is deliberate to ensure the right team fit.
Southern California Edison Software Engineer candidate reports ↗Are technical questions always included?
Not always. Many candidates report purely behavioral interviews, but you should always be prepared for at least one technical or design-related question, especially if the role is highly specialized.
Southern California Edison Software Engineer candidate reports ↗What is the best way to prepare for the personality assessment?
Research the company’s core values—safety, integrity, and excellence. Answer consistently and honestly, as these tests are designed to measure alignment with the organizational culture.
Southern California Edison Software Engineer candidate reports ↗Can I expect a remote interview?
Yes, most initial rounds and many panel interviews are conducted via Microsoft Teams, though some roles may eventually require in-person attendance depending on the department.
Southern California Edison Software Engineer candidate reports ↗What topics does Southern California Edison test in interviews?
Southern California Edison interviews most often cover Behavioral Interviewing, Phone Screening, Problem Solving, Panel Interviewing, and Cybersecurity (General). The exact emphasis depends on the specific role you apply for.
Southern California Edison Software Engineer candidate reports ↗Sources & methodology 3 sources ↗
No official company page is cited. Rounds and questions come from candidate reports and PracHub editorial material; each source shows the date it was read.
- 01Southern California Edison Software Engineer candidate reports ↗
Company-reported rounds, questions and FAQ.
Candidate reports · Accessed 2026-09-22 - 02PracHub Software Engineer practice ↗
PracHub practice material, not company-reported.
PracHub page · Accessed 2026-09-22 - 03PracHub preparation framework ↗
PracHub preparation guidance.
PracHub page · Accessed 2026-09-22